BLD-Aging Inspection | 6/6/2018 | 6/6/2018 | 6/12/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 1/19/2018 | 1/23/2018 | 1/23/2018 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Wall Bracing | 1/18/2018 | 1/19/2018 | 1/22/2018 | P | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 1/18/2018 | 1/19/2018 | 1/19/2018 | A | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Energy code compliance | 1/17/2018 | 1/18/2018 | 1/18/2018 | P | PART |
Tony Young
|
|
|
Matt Phone #: ###-####,, needed frame,, needs seal pack,, ok to insulate
|
BLD-Foundation | 11/7/2017 | 11/8/2017 | 11/8/2017 | A | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Tony Young
|
|
|
Wes Phone #: ###-####
|
PubWorks Subgrade Approval | 10/26/2017 | 10/26/2017 | 10/26/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 10/13/2017 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 10/6/2017 | 10/6/2017 | 10/13/2017 | | PASS |
Josh Bogle
|
|
|
1st done - hillside addition missing WUI and Energy details
|
Issue PAID IN FULL permit | | | 10/13/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/13/2017 | | 10/13/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/13/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/13/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 10/13/2017 | | DONE |
|
|
|
MET
Need
RP
|
Routing - PLAN CHECK | 10/9/2017 | | 10/11/2017 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 10/11/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 10/6/2017 | | 10/9/2017 | | PASS |
Michael Zawacki
|
|
|
ESC plan waiver approved. RP needs to get Interim RP status by signing up for scheduled class.
|
Routing Walk-In (Zoning) | 10/6/2017 | 10/6/2017 | 10/6/2017 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (Zoning) | 10/4/2017 | 10/4/2017 | 10/5/2017 | P | CANC |
Josh Bogle
|
|
|
no contact with applicant
|
Routing Walk-In (PW Hillside) | 10/4/2017 | 10/4/2017 | 10/4/2017 | P | PASS |
Melissa Jannusch
|
|
|
Site plan will be ok. Only subgrade approvals will be required.
|
Routing Walk-In (PW Hillside) | 9/26/2017 | 9/26/2017 | 9/26/2017 | P | FAIL |
Tisha Gallop
|
|
|
per Melissa; (Category 1) need grading plan sealed by eng.
|
Application received | | 9/26/2017 | | | |
|
|
|
|