BLD-Final | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
DOC - Permit Finaled | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 5/21/2018 | 5/21/2018 | 5/21/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
BLD-Other | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | PASS |
Brandon Shaw
|
|
|
SOFITS, ROLLO Phone #: ###-####
|
BLD-Framing/Rough-in | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Framing corrections- SAT
|
BLD-Energy code compliance | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PASS |
Brandon Shaw
|
|
|
Need Engineering approval/revised fix for broken A4 truss, at Family room.
OK to insulate
|
BLD-Wall Bracing | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Foundation | 12/3/2017 | 12/4/2017 | 12/5/2017 | P | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Foundation | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 11/26/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
PubWorks Subgrade Approval | 11/13/2017 | 11/13/2017 | 11/13/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 11/6/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/6/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2017 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 11/6/2017 | | DONE |
|
|
|
MET
|
Plan assigned to (M_H) | 10/26/2017 | | 11/6/2017 | | DONE |
Michael Hanson
|
|
|
10/17 sfd L2 ePlan - 1st review complete, applicant corrections required. 10/30 MDH
|
Routing - PLAN CHECK | 10/31/2017 | | 11/6/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan Reviewer's activity | | | 11/3/2017 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 11/2/2017 | | FAIL |
Michael Hanson
|
|
|
Foundation elevations incorrect. MDH
|
Routing - PLAN CHECK | 10/30/2017 | | 10/31/2017 | | FAIL |
Brian McGowan
|
|
|
Foundation elevation marks do not correlate with the grading and drainage sheet (+100' off). MDH
|
Routing PW Grading-Hillside | 10/31/2017 | | 10/31/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLAN CHECK | 9/27/2017 | | 10/30/2017 | | FAIL |
Brian McGowan
|
|
|
Incorrect grading and drainage plan. Missing Harris Ranch approval letter. MDH
|
Routing - FIRE | 9/27/2017 | 9/27/2017 | 10/2/2017 | | PASS |
Scott Arellano
|
|
|
Approved as shown.
|
Routing - Erosion and Sediment | 9/27/2017 | | 10/2/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Site preparation inspection is required.
|
Routing - MECHANICAL | 9/27/2017 | | 10/2/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 9/27/2017 | 9/30/2017 | 9/29/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 9/27/2017 | | 9/28/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Plan assigned to (BJM) | 9/27/2017 | 9/27/2017 | 9/27/2017 | | DEFR |
Brian McGowan
|
|
|
10/17 sfd L2 ePlan
|
Plans ACCEPTED BY PLAN TECH | | | 9/27/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/27/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/27/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 9/27/2017 | | 9/27/2017 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 9/27/2017 | | 9/27/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/27/2017 | | 9/27/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Sewer Rating | 9/27/2017 | | 9/27/2017 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 9/26/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 26 2017 3:57PM
|