Permit Information
Permit NumberBLD17-03486
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 7128 E HIGHLAND VALLEY RD
Project NameRegis B
Customer Number 
ePlanReviewYes
Description
WUI VALLEY, PERIMETER LOT, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 2424 sq. ft., two story (first story 956 sq. ft., second story 1468 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 112 sq. ft. of covered patio/porch and a 836 sq. ft. attached garage per the approved plans. R-1C/DA zoning and setbacks per planning.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/26/201811/30/201811/30/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled11/30/201811/30/201811/30/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results11/26/201811/30/201811/30/2018ADONE
DetailsBrandon Shaw
ACH50- 4.2
PubWorks Occupancy Approval11/21/201811/21/201811/21/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Energy code compliance9/4/20189/6/20189/6/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in8/28/20189/4/20189/4/2018APEND
DetailsBrandon Shaw
Hold downs to be as per plans, installed per manufact. install. instructions

OK to insulate
BLD-Wall Bracing8/6/20188/6/20188/6/2018PPEND
DetailsBrandon Shaw
Missing straps and hold downs to be installed before framing rough in...
BLD-Foundation6/26/20186/26/20186/26/2018APASS
DetailsBrandon Shaw
BLD-Footing6/15/20186/15/20186/15/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing6/14/20186/14/20186/14/2018PNR
DetailsBrandon Shaw
Brian Phone #: ###-####
PubWorks Subgrade Approval6/14/20186/14/20186/14/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  4/19/2018  
Plan assigned to (BJM)9/28/20179/28/20174/19/2018 DONE
DetailsBrian McGowan
1st review complete 2-5 Corrections requested-Need Hillside to final. 10/18 sfd L2 ePlan
Issue PAID IN FULL permit  4/19/2018 DONE
Inspection Record Card- Bld  4/19/2018 DONE
Routing - PLAN CHECK4/17/2018 4/19/2018 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  4/19/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  4/19/2018 DONE
met
Telephone call  4/10/2018 DONE
Josh emailed asking about the status of this permit. I emailed him back that the permit was in the building dept and was the last one to review the resubmittals
Routing PW Grading-Hillside2/26/2018 2/26/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Routing PW Grading-Hillside2/1/2018 2/2/2018 FAIL
DetailsMelissa Jannusch
See changemarks in ePlan
Routing - PUBLIC WORKS2/1/2018 2/1/2018 PASS
DetailsRachael Beierle
Routing - PLAN CHECK1/31/2018 1/31/2018 FAIL
DetailsBrian McGowan
Need Hillside Changemarks resolved. Sheet sizes must match
Routing PW Grading-Hillside1/11/2018 1/11/2018 FAIL
DetailsJason C. Taylor
see changemarks in eplan. JCT
Routing PW Grading-Hillside11/6/2017 11/6/2017 FAIL
DetailsMelissa Jannusch
see changemarks in ePlan
1st review completed  10/31/2017 FAIL
DetailsBrian McGowan
Top of FND and FTG needed. Garage beam verification.
Routing - PLAN CHECK9/28/2017 10/31/2017 FAIL
DetailsBrian McGowan
Top of FND and FTG needed. Garage beam verification.
Routing - FIRE9/28/20179/28/201710/2/2017 PASS
DetailsScott Arellano
NO comments attached.
Routing - MECHANICAL9/28/2017 10/2/2017 PASS
DetailsTroy James
Routing - Erosion and Sediment9/28/2017 10/2/2017 PASS
DetailsAndy J. Long
ESC plan approved. Valid stormwater and pollution prevention team designated. Site preparation inspection is required.
Route to Impact Fee Review9/28/201710/1/20179/29/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Intake Approval  9/28/2017 PASS
Plans ACCEPTED BY PLAN TECH  9/28/2017 DONE
Recd Pcfee & Taken To Pln CK  9/28/2017 DONE
Routing - PLANNING9/28/2017 9/28/2017 PASS
DetailsSue Cummings
Routing - Addressing9/28/2017 9/28/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/28/2017 9/28/2017 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside9/28/2017 9/28/2017 FAIL
DetailsMelissa Jannusch
See changemarks in ePlan
Application received  9/27/2017 DONE
Application submitted via PDS Online on Sep 27 2017 11:12AM