BLD-Final | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | PASS |
Jim Sly
|
|
|
Andrina-was a foundation only permit-building permit has been issued Phone #: ###-####
|
DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PASS |
Jim Sly
|
|
|
Paul Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 11/13/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 11/8/2017 | | |
|
|
|
|
Telephone call | | | 11/8/2017 | | DONE |
|
|
|
Left a message informing that this plan mod is ready to be picked up and the fee amount due.
|
Permit Ready to Issue | | | 11/8/2017 | | DONE |
|
|
|
DO NOT REISSUE. PLAN MOD
|
Plan assigned to (BJM) | 11/3/2017 | 11/3/2017 | 11/7/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 11/7/2017 | | 11/7/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/7/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2017 | | DONE |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 11/3/2017 | | DONE |
|
|
|
2 copies of A0.0 stamped and taken to Brain M
|
OVERRIDE | | | 10/6/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/6/2017 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2017 | | DONE |
|
|
|
called Andrina at Magellan Co and left vm foundation permit is ready and fee due.
|
Issue PAID IN FULL permit | | | 10/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (BJM) | 9/27/2017 | 9/27/2017 | 10/5/2017 | | DONE |
Brian McGowan
|
|
|
Foundation only
|
Routing - PLAN CHECK | 9/27/2017 | | 10/5/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 10/5/2017 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/5/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLANNING | 9/28/2017 | | 9/29/2017 | | PASS |
Jeff Lowe
|
|
|
setbacks for foundation only. need to review driveway, height, etc.
|
Plans ACCEPTED BY PLAN TECH | | | 9/27/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/27/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/27/2017 | | DONE |
|
|
|
|
Application received | | 9/27/2017 | | | |
|
|
|
|