Permit Information
Permit NumberBLD17-03496
StatusFinaled
Name DEBELLOY CONSTRUCTION
Site Address 6871 W OVERLAND RD
Project NameGyro Shack
Customer Number 
ePlanReviewYes
Description
(GYRO SHACK – REMODEL AND ADDITION) (DRH17-00212) (3-13-18 PLAN MODIFICATION TO REARRANGE THE KITCHEN AREA AND TO MODIFY THE BUFFET LINE. TWO TYPE I GREASE HOOD AND DUCT SYSTEMS WILL BE INSTALLED.) This building does not have a fire sprinkler system. To construct a 27 square foot drive-thru window addition to an existing restaurant building and to remodel the building for a new restaurant tenant. After the addition, this building will have a total interior floor area of about 1,976 square feet. For the addition, work is to include concrete footings, concrete foundation, concrete slab on grade, wood framed exterior walls, exterior windows, a roof with insulation on top of the roof deck and a new membrane roof covering, exterior finishes, and interior finishes. For the existing building, structural work is to include new shear walls; new roof parapets and parapet braces; strengthening existing roof truss to support new roof top equipment, the grease hood, and snow and wind loads caused by the new parapets; and a rebuilt roof structure over the West entry vestibule. Special Inspection is required for concrete and for post installed anchors in hardened concrete. A new trash enclosure will be constructed, a new 12’ x 38’ exterior concrete patio will be placed at the North end of the building, new exterior finishes will be applied, a new awning will be installed above the new drive-thru window, and new exterior doors will be installed in new exterior wall openings. Interior work is to include interior nonbearing walls, two toilet rooms accessible to the disabled, millwork, a Type I grease hood and duct system, kitchen equipment, gypsum board ceilings and soffits, suspended acoustical ceilings, and interior finishes. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/15/20189/17/2018 DONE
This permit finaled on the web by kevin debelloy
Third Notice 8/12/20189/10/2018 DONE
mailed 9-11-18
Third Notice 7/16/20188/7/2018 DONE
Mailed 8/10/18
Second Notice 6/21/20187/11/2018 DONE
mailed 7-12-18
First Notice 5/31/20186/11/2018 DONE
maild 6-12
BLD-Final5/21/20185/21/20185/21/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by kevin debelloy. OK for perm occ.
FIRE-Final Inspection5/20/20185/21/20185/21/2018PPASS
DetailsTroy Cobbley
Life safety passed

Phone #: ###-#### Inspection requested via web by kevin debelloy
Permanent Occupancy  5/21/2018 DONE
BLD-Conference5/18/20185/18/20185/18/2018ACANC
DetailsMike Jordan
I might be able to explain my question with a phone a call. ###-#### Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
FIRE-Final Inspection5/17/20185/17/20185/17/2018PFAIL
DetailsTroy Cobbley
Provide occupant load sign, provide testing/annunciator for the duct smoke detector, provide approval of the kitchen hood/appliance layout from the mechanical inspector.

Phone #: ###-#### Inspection requested via web by kevin debelloy
Zoning Approval5/9/20185/9/20185/9/2018 PASS
DetailsKatelyn Menuge
BLD-Energy code compliance4/11/20184/12/20184/12/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by kevin debelloy.
BLD-Framing/Rough-in4/9/20184/10/20184/10/2018PPASS
DetailsMike Jordan
please call 15 minutes before arrival - thanks Kevin deBelloy Phone #: ###-#### Inspection requested via web by kevin debelloy. Interior steel stud framed walls and steel stud framed walls ok. Structural upgrade work for MAU, new hood and parapets ok.
OVERRIDE  3/13/2018  
Plan assigned to (CJW)2/26/20182/26/20183/13/2018 PASS
DetailsCarl Westfall
x plan mod - Gyro Shack (3-9-18 routed again to CDHD)
CHANGE STATUS TO (ISS)  3/13/2018 DONE
Routing Off Site - C.D.H3/9/2018 3/13/2018 PASS
DetailsCarl Westfall
Will Reynolds
Plan Reviewer's activity  3/13/2018 PASS
Plan mod approved
Permit Ready to Issue  3/13/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Plan resubmittals requested  3/9/2018 DONE
Plan resubmittals received  3/9/2018 DONE
Routing - PLAN CHECK3/9/2018 3/9/2018 PASS
DetailsCarl Westfall
Routing Off Site - C.D.H3/6/2018 3/9/2018 FAIL
DetailsCarl Westfall
Will Reynolds
Routing - PLUMBING3/6/2018 3/6/2018 PASS
DetailsBill VanDegrift
hand sink added, see redlines
Routing PW Sewer Rating3/6/2018 3/6/2018 PASS
DetailsMorgan Webb
NO NEW FEES. CUSTOMER SERVICE AREA THE SAME WITH MOD.
Routing PW Sewer Rating3/5/2018 3/6/2018 PASS
DetailsMorgan Webb
review customer service area for mod
Plan resubmittals requested  3/6/2018 DONE
Plan resubmittals received  3/6/2018 DONE
Routing - PLAN CHECK3/6/2018 3/6/2018 PASS
DetailsCarl Westfall
Routing - MECHANICAL2/28/2018 3/5/2018 PASS
DetailsChad Schwendiman
Plan mod
Routing PW Environmental2/28/2018 3/5/2018 PASS
DetailsRick Christenson
Plan mod
Routing Off Site - C.D.H2/28/2018 3/2/2018 FAIL
DetailsCarl Westfall
Will Reynolds
Routing - FIRE2/28/2018 3/2/2018 PASS
DetailsErika Akin
Plan mod; no changes to previous review
Routing - PLUMBING2/28/2018 3/1/2018 PASS
DetailsBill VanDegrift
Plan mod see redlines
Routing - PLAN CHECK2/26/2018 2/28/2018 PASS
DetailsCarl Westfall
1st plan mod - 1st review approved
Routing - Design Review2/28/2018 2/28/2018 PASS
DetailsKatelyn Menuge
Plan mod
Plan Modification Accepted  2/26/2018 DONE
DetailsChristina Prado
Plan Mod to re-arrange food storage area & add buffet line
BLD-Wall Bracing2/19/20182/20/20182/20/2018PPASS
DetailsMike Jordan
inspection is for wall shear on parapet walls Phone #: ###-#### Inspection requested via web by kevin debelloy. Neew parapets.
BLD-Framing/Rough-in2/20/20182/20/20182/20/2018PPASS
DetailsMike Jordan
inspection is for wall shear on parapet walls Phone #: ###-#### Inspection requested via web by kevin debelloy. New parapets ok.
BLD-Energy code compliance1/17/20181/17/20181/17/2018PPASS
DetailsMike Jordan
Inspection is for 2” ridged foundation insulation Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Footing1/16/20181/16/20181/16/2018APASS
DetailsMike Jordan
Concrete is scheduled for 10:30 Phone #: ###-#### Inspection requested via web by kevin debelloy. Footing for new drive thru window.
OVERRIDE  12/22/2017  
Issue PAID IN FULL permit  12/22/2017 DONE
Print Occupancy Form  12/22/2017 DONE
Permit Ready to Issue  12/22/2017 DONE
MET
Need:
GC form
Revised Value MET
RP MET
Plan assigned to (CJW)10/6/201710/6/201712/21/2017 PASS
DetailsCarl Westfall
(2nd done) (Oct 26 - 15 days) (48 sheets) Gyro Shack
Routing - Design Review  12/21/2017 PASS
DetailsKatelyn Menuge
In addition to your plan review, please resolve your changemarks in ePlanReview
Plan resubmittals received  12/21/2017 DONE
Routing - PLAN CHECK12/21/2017 12/21/2017 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  12/21/2017 DONE
Plan resubmittals requested  12/19/2017 DONE
Routing PW Environmental12/14/2017 12/18/2017 PASS
DetailsRick Christenson
Routing Off Site - STRUCTURAL12/14/2017 12/18/2017 PASS
DetailsCarl Westfall
Chris Holladay (AHJ)
Routing - Design Review12/14/2017 12/14/2017 FAIL
DetailsKatelyn Menuge
Need tree in southeast corner, two bicycle parking spaces, stucco and metal siding cannot be within two feet of the ground per DRH17-00212 conditions.
Routing - PLANNING12/14/2017 12/14/2017 PASS
DetailsBrent Moore
Routing - PLAN CHECK12/13/2017 12/14/2017 PASS
DetailsCarl Westfall
Pending structural approval
Plan resubmittals received  12/13/2017 DONE
Route to Impact Fee Review11/27/201711/30/201711/27/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  11/27/2017 DONE
The structural review was done on Wednesday at 10:52 AM the day before Thanksgiving. The Plans Examiner was off work on Friday. The workflow was sent back to the applicant on Monday.
Plan resubmittals requested  11/27/2017 DONE
After the structural review
Routing Off Site - STRUCTURAL11/14/2017 11/22/2017 FAIL
DetailsCarl Westfall
Routed to AHJ
Plan resubmittals requested  11/15/2017 DONE
The IBC plan review report was Emailed to the Architect so he could get started on revisions while the structural review is completed.
Routing - PLAN CHECK10/6/2017 11/15/2017 FAIL
DetailsCarl Westfall
Revised drawings required. See the 1st IBC plan review report.
Routing Off Site - C.D.H10/6/2017 10/20/2017 PASS
DetailsCarl Westfall
Will Reynolds
Routing - MECHANICAL10/6/2017 10/12/2017 PASS
DetailsChad Schwendiman
Routing - FIRE10/6/201710/6/201710/11/2017 PASS
DetailsScott Arellano
Attached review comments to case
Routing - Erosion and Sediment10/6/2017 10/11/2017 PASS
DetailsMichael Zawacki
ESCP waiver approved. Need to designate RP.
Routing - PLUMBING10/6/2017 10/9/2017 PASS
DetailsBill VanDegrift
1) R.P. required on soda lines.
2) additional cross conection protection may be required
Routing - PLANNING10/6/2017 10/9/2017 FAIL
DetailsBrent Moore
Routing - Addressing10/6/2017 10/6/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/6/2017 10/6/2017 PASS
DetailsRachael Beierle
Intake Approval  10/6/2017 PASS
DetailsAdele J Schaffeld-Griffin
Julie completed pre screen
Routing - Design Review10/6/2017 10/6/2017 FAIL
DetailsKatelyn Menuge
Corrections required to Site Plan, Landscape Plan and Elevations.
Routing PW Environmental10/6/2017 10/6/2017 FAIL
DetailsRick Christenson
Owner needs to demonstrate proper grease abatement. Submitted plans do not match on site facility.
Intake Approval  10/2/2017 FAIL
DetailsJulie Romig
submit the CDHD application with all owner/establishment information filled out
Intake Approval  9/29/2017 FAIL
DetailsJulie Romig
Need
1. Approved CDHD plans
2. Erosion and Sediment Control Plan Waiver Request Letter.
3. Structural calculations for foundation and framing design.
4. Structural calculations showing the existing building can support the new hood and new mechanical unit MAU-1.
5. Location of Portable Fire Extinguishers.
Application received  9/27/2017 DONE