Third Notice | | 9/15/2018 | 9/17/2018 | | DONE |
|
|
|
This permit finaled on the web by kevin debelloy
|
Third Notice | | 8/12/2018 | 9/10/2018 | | DONE |
|
|
|
mailed 9-11-18
|
Third Notice | | 7/16/2018 | 8/7/2018 | | DONE |
|
|
|
Mailed 8/10/18
|
Second Notice | | 6/21/2018 | 7/11/2018 | | DONE |
|
|
|
mailed 7-12-18
|
First Notice | | 5/31/2018 | 6/11/2018 | | DONE |
|
|
|
maild 6-12
|
BLD-Final | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy. OK for perm occ.
|
FIRE-Final Inspection | 5/20/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
Permanent Occupancy | | | 5/21/2018 | | DONE |
|
|
|
|
BLD-Conference | 5/18/2018 | 5/18/2018 | 5/18/2018 | A | CANC |
Mike Jordan
|
|
|
I might be able to explain my question with a phone a call. ###-#### Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
|
FIRE-Final Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide occupant load sign, provide testing/annunciator for the duct smoke detector, provide approval of the kitchen hood/appliance layout from the mechanical inspector.
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
Zoning Approval | 5/9/2018 | 5/9/2018 | 5/9/2018 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Energy code compliance | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy.
|
BLD-Framing/Rough-in | 4/9/2018 | 4/10/2018 | 4/10/2018 | P | PASS |
Mike Jordan
|
|
|
please call 15 minutes before arrival - thanks Kevin deBelloy Phone #: ###-#### Inspection requested via web by kevin debelloy. Interior steel stud framed walls and steel stud framed walls ok. Structural upgrade work for MAU, new hood and parapets ok.
|
OVERRIDE | | | 3/13/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 2/26/2018 | 2/26/2018 | 3/13/2018 | | PASS |
Carl Westfall
|
|
|
x plan mod - Gyro Shack (3-9-18 routed again to CDHD)
|
CHANGE STATUS TO (ISS) | | | 3/13/2018 | | DONE |
|
|
|
|
Routing Off Site - C.D.H | 3/9/2018 | | 3/13/2018 | | PASS |
Carl Westfall
|
|
|
Will Reynolds
|
Plan Reviewer's activity | | | 3/13/2018 | | PASS |
|
|
|
Plan mod approved
|
Permit Ready to Issue | | | 3/13/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
|
Plan resubmittals requested | | | 3/9/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/9/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/9/2018 | | 3/9/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - C.D.H | 3/6/2018 | | 3/9/2018 | | FAIL |
Carl Westfall
|
|
|
Will Reynolds
|
Routing - PLUMBING | 3/6/2018 | | 3/6/2018 | | PASS |
Bill VanDegrift
|
|
|
hand sink added, see redlines
|
Routing PW Sewer Rating | 3/6/2018 | | 3/6/2018 | | PASS |
Morgan Webb
|
|
|
NO NEW FEES. CUSTOMER SERVICE AREA THE SAME WITH MOD.
|
Routing PW Sewer Rating | 3/5/2018 | | 3/6/2018 | | PASS |
Morgan Webb
|
|
|
review customer service area for mod
|
Plan resubmittals requested | | | 3/6/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/6/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/6/2018 | | 3/6/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing - MECHANICAL | 2/28/2018 | | 3/5/2018 | | PASS |
Chad Schwendiman
|
|
|
Plan mod
|
Routing PW Environmental | 2/28/2018 | | 3/5/2018 | | PASS |
Rick Christenson
|
|
|
Plan mod
|
Routing Off Site - C.D.H | 2/28/2018 | | 3/2/2018 | | FAIL |
Carl Westfall
|
|
|
Will Reynolds
|
Routing - FIRE | 2/28/2018 | | 3/2/2018 | | PASS |
Erika Akin
|
|
|
Plan mod; no changes to previous review
|
Routing - PLUMBING | 2/28/2018 | | 3/1/2018 | | PASS |
Bill VanDegrift
|
|
|
Plan mod see redlines
|
Routing - PLAN CHECK | 2/26/2018 | | 2/28/2018 | | PASS |
Carl Westfall
|
|
|
1st plan mod - 1st review approved
|
Routing - Design Review | 2/28/2018 | | 2/28/2018 | | PASS |
Katelyn Menuge
|
|
|
Plan mod
|
Plan Modification Accepted | | | 2/26/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod to re-arrange food storage area & add buffet line
|
BLD-Wall Bracing | 2/19/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Mike Jordan
|
|
|
inspection is for wall shear on parapet walls Phone #: ###-#### Inspection requested via web by kevin debelloy. Neew parapets.
|
BLD-Framing/Rough-in | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Mike Jordan
|
|
|
inspection is for wall shear on parapet walls Phone #: ###-#### Inspection requested via web by kevin debelloy. New parapets ok.
|
BLD-Energy code compliance | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | PASS |
Mike Jordan
|
|
|
Inspection is for 2” ridged foundation insulation Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Footing | 1/16/2018 | 1/16/2018 | 1/16/2018 | A | PASS |
Mike Jordan
|
|
|
Concrete is scheduled for 10:30 Phone #: ###-#### Inspection requested via web by kevin debelloy. Footing for new drive thru window.
|
OVERRIDE | | | 12/22/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/22/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/22/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/22/2017 | | DONE |
|
|
|
MET
Need:
GC form
Revised Value MET
RP MET
|
Plan assigned to (CJW) | 10/6/2017 | 10/6/2017 | 12/21/2017 | | PASS |
Carl Westfall
|
|
|
(2nd done) (Oct 26 - 15 days) (48 sheets) Gyro Shack
|
Routing - Design Review | | | 12/21/2017 | | PASS |
Katelyn Menuge
|
|
|
In addition to your plan review, please resolve your changemarks in ePlanReview
|
Plan resubmittals received | | | 12/21/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/21/2017 | | 12/21/2017 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 12/19/2017 | | DONE |
|
|
|
|
Routing PW Environmental | 12/14/2017 | | 12/18/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing Off Site - STRUCTURAL | 12/14/2017 | | 12/18/2017 | | PASS |
Carl Westfall
|
|
|
Chris Holladay (AHJ)
|
Routing - Design Review | 12/14/2017 | | 12/14/2017 | | FAIL |
Katelyn Menuge
|
|
|
Need tree in southeast corner, two bicycle parking spaces, stucco and metal siding cannot be within two feet of the ground per DRH17-00212 conditions.
|
Routing - PLANNING | 12/14/2017 | | 12/14/2017 | | PASS |
Brent Moore
|
|
|
|
Routing - PLAN CHECK | 12/13/2017 | | 12/14/2017 | | PASS |
Carl Westfall
|
|
|
Pending structural approval
|
Plan resubmittals received | | | 12/13/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 11/27/2017 | 11/30/2017 | 11/27/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 11/27/2017 | | DONE |
|
|
|
The structural review was done on Wednesday at 10:52 AM the day before Thanksgiving. The Plans Examiner was off work on Friday. The workflow was sent back to the applicant on Monday.
|
Plan resubmittals requested | | | 11/27/2017 | | DONE |
|
|
|
After the structural review
|
Routing Off Site - STRUCTURAL | 11/14/2017 | | 11/22/2017 | | FAIL |
Carl Westfall
|
|
|
Routed to AHJ
|
Plan resubmittals requested | | | 11/15/2017 | | DONE |
|
|
|
The IBC plan review report was Emailed to the Architect so he could get started on revisions while the structural review is completed.
|
Routing - PLAN CHECK | 10/6/2017 | | 11/15/2017 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required. See the 1st IBC plan review report.
|
Routing Off Site - C.D.H | 10/6/2017 | | 10/20/2017 | | PASS |
Carl Westfall
|
|
|
Will Reynolds
|
Routing - MECHANICAL | 10/6/2017 | | 10/12/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - FIRE | 10/6/2017 | 10/6/2017 | 10/11/2017 | | PASS |
Scott Arellano
|
|
|
Attached review comments to case
|
Routing - Erosion and Sediment | 10/6/2017 | | 10/11/2017 | | PASS |
Michael Zawacki
|
|
|
ESCP waiver approved. Need to designate RP.
|
Routing - PLUMBING | 10/6/2017 | | 10/9/2017 | | PASS |
Bill VanDegrift
|
|
|
1) R.P. required on soda lines.
2) additional cross conection protection may be required
|
Routing - PLANNING | 10/6/2017 | | 10/9/2017 | | FAIL |
Brent Moore
|
|
|
|
Routing - Addressing | 10/6/2017 | | 10/6/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/6/2017 | | 10/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 10/6/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Julie completed pre screen
|
Routing - Design Review | 10/6/2017 | | 10/6/2017 | | FAIL |
Katelyn Menuge
|
|
|
Corrections required to Site Plan, Landscape Plan and Elevations.
|
Routing PW Environmental | 10/6/2017 | | 10/6/2017 | | FAIL |
Rick Christenson
|
|
|
Owner needs to demonstrate proper grease abatement. Submitted plans do not match on site facility.
|
Intake Approval | | | 10/2/2017 | | FAIL |
Julie Romig
|
|
|
submit the CDHD application with all owner/establishment information filled out
|
Intake Approval | | | 9/29/2017 | | FAIL |
Julie Romig
|
|
|
Need
1. Approved CDHD plans
2. Erosion and Sediment Control Plan Waiver Request Letter.
3. Structural calculations for foundation and framing design.
4. Structural calculations showing the existing building can support the new hood and new mechanical unit MAU-1.
5. Location of Portable Fire Extinguishers.
|
Application received | | | 9/27/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 27 2017 2:50PM
|