Third Notice | | 8/12/2018 | 9/6/2018 | | DONE |
|
|
|
Mailed 9-10-18
|
Third Notice | | 7/14/2018 | 8/7/2018 | | DONE |
|
|
|
Mailed 8-10-18
|
Third Notice | | 6/16/2018 | 7/9/2018 | | DONE |
|
|
|
mailed 7-10 MAIL TO 302 DESIGNS LLC 6/20/18 PER EMAIL (RED TAGGED)
|
Case Summary (BLD) | | | 6/20/2018 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/20/2018 | | DONE |
Rita DeYoung
|
|
|
|
Second Notice | | 5/21/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
First Notice | | 4/21/2018 | 5/11/2018 | | DONE |
|
|
|
mailed 5-14
|
Permanent Occupancy | | | 4/11/2018 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 4/5/2018 | 4/5/2018 | 4/5/2018 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 4/3/2018 | 4/4/2018 | 4/4/2018 | A | PASS |
Jim Storey
|
|
|
Joe Phone #: ###-#### final ok pending plm .
|
BLD-Final | 3/29/2018 | 4/3/2018 | 4/3/2018 | P | DEFR |
Jim Storey
|
|
|
Joe Phone #: ###-#### need pw and health dept.
|
FIRE-Final Inspection | 4/3/2018 | 4/3/2018 | 4/3/2018 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, commercial hood fire suppression system inspection complete, fire extinguishers are mounted with current inspection tags. Final life fire safety inspection complete.
|
FIRE-Final Inspection | 3/30/2018 | 4/3/2018 | 4/3/2018 | A | FAIL |
Jim Page
|
|
|
Life fire safety inspection is complete with exception to the Type I hood fire suppression system inspection, FIR permit FIR18-00220 needs to be finaled before BLD permit life fire safety can be finaled.
|
BLD-Ceiling Grid Inspection | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PASS |
Jim Storey
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 2/12/2018 | 2/13/2018 | 2/13/2018 | P | PART |
Jim Storey
|
|
|
Troy Phone #: ###-#### framing ok ok to one side walls for tile aplacation/ need engineer to look at back window and door openings for support.
|
OVERRIDE | | | 12/15/2017 | | |
|
|
|
|
Plan assigned to (JG) | 10/6/2017 | 10/6/2017 | 12/15/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 10/26 L3 Madre Taco Restaurant ePlan, pend eng
|
Issue PAID IN FULL permit | | | 12/15/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/15/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/15/2017 | | DONE |
|
|
|
met
|
Routing Off Site - STRUCTURAL | 12/7/2017 | | 12/15/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Dave Haugland
|
Routing - PLAN CHECK | 12/7/2017 | | 12/13/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Flood Plain | 12/7/2017 | | 12/8/2017 | | PASS |
Jason C. Taylor
|
|
|
Project does not meet the substantial improvement threshold. Improvements are under the 50% valuation of the existing building. No review required. Jason Taylor ###-####
|
Routing PW Flood Plain | 11/17/2017 | | 12/1/2017 | | FAIL |
Jason C. Taylor
|
|
|
need new application submitted for review. JCT
|
Routing PW Sewer Design | 11/17/2017 | | 11/30/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by PW Sewer Design Mike Sheppard
|
Routing - PLAN CHECK | 11/17/2017 | | 11/30/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 11/17/2017 | | 11/30/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Dave Haugland
|
Routing PW Sewer Design | 11/22/2017 | | 11/22/2017 | | PASS |
Mike Sheppard
|
|
|
|
Routing - MECHANICAL | 11/17/2017 | | 11/21/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PUBLIC WORKS | 11/17/2017 | | 11/20/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 11/17/2017 | | 11/17/2017 | | PASS |
Bill VanDegrift
|
|
|
1) asse 1070 mixing valve required at public lavs
2) additional cross connection protection may be required
3) provide a DCVA for premise protection or provide a 4" drain for an R.P.
|
Routing - Design Review | 11/17/2017 | | 11/17/2017 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 11/2/2017 | 11/5/2017 | 11/6/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 10/6/2017 | | 11/2/2017 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 11/2/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Drainage | 10/20/2017 | | 10/31/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 10/6/2017 | | 10/27/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Dave Haugland
|
Routing - MECHANICAL | 10/6/2017 | | 10/12/2017 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 10/6/2017 | 10/6/2017 | 10/11/2017 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - Erosion and Sediment | 10/6/2017 | | 10/11/2017 | | PASS |
Michael Zawacki
|
|
|
ESCP approved. RP to be designated. Site inspection required.
|
Routing PW Environmental | 10/6/2017 | | 10/11/2017 | | PASS |
Rick Christenson
|
|
|
Per Plumbing notes.
|
Routing PW Flood Plain | 10/6/2017 | | 10/10/2017 | | FAIL |
Jason C. Taylor
|
|
|
A portion of the property is within the floodplain. Comply with Boise Floodplain Ordinance (B.C.C. 11-08). Elevation Certificate and elevations need to be placed on site plan, foundation plan, and cross section plans. Jason Taylor ###-####
|
Routing - PLANNING | 10/6/2017 | | 10/10/2017 | | PASS |
Leon Letson
|
|
|
|
Routing - PLUMBING | 10/6/2017 | | 10/9/2017 | | FAIL |
Bill VanDegrift
|
|
|
1) provide a cleanout on the discharge side of the grease interceptor.
2) All kitchen waste to rout to the interptor per Public Works Pretreatment requirements.
3) locate premise BFP inside building
3) aditional cross connection protection may be required
|
Routing - Addressing | 10/6/2017 | | 10/6/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/6/2017 | | 10/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 10/6/2017 | | 10/6/2017 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 10/6/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Michael approved pre screen, CDH approval recieved
|
Routing PW Sewer Design | 10/6/2017 | | 10/6/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Connect service to public main at 90 degrees and maintain perpendicular alignment within public r/w. Connect service as a type "D" using an insert-a-tee fitting. Contractor shall sleeve sewer services through seepage beds such that no joints in the pipe sleeve occur within the seepage bed, and the sleeve extends a minimum of 5 feet outside of the seepage bed on either side. Sleeves shall be composed of SDR-35 PVC, equivalent or greater quality material. Spacers (or approved equivalent) and rubber end seals shall be required to support the service line and prevent leaking into the sleeve.
|
Plan Reviewer's activity | | | 10/6/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
John,
Please make sure that you reach out to ACHD for review on this change of use/occupancy. If additional fees are due they will need to be paid or paid when the permit is issued. If no fees are do please submit the documentation from ACDH as such.
Thank you
|
Routing PW Solid Waste | 10/6/2017 | | 10/6/2017 | | PASS |
Evan Carpenter
|
|
|
|
Application received | | | 9/28/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 28 2017 10:37AM
|