Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-03516
StatusFinaled
Name QUALITY ELECTRIC INC
Site Address 5272 W IRVING ST
Project NameQuality Electric Line Shed
Customer Number 
ePlanReviewYes
Description
(QUALITY ELECTRIC) Permit for the construction of a new 4,000 sq. ft. storage building with work to include general site work and building construction per the approved plans and the attached engineering. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice4/11/20184/11/20184/18/2018 DONE
DetailsJim Sly
This permit finaled on the web by Scott Campbell
BLD-Final4/11/20184/11/20184/11/2018PPASS
DetailsJim Sly
Contacts are either Don Rye or Jay Hintze Phone #: ###-#### Inspection requested via web by Scott Campbell
DOC - Permit Finaled4/11/20184/11/20184/11/2018PPASS
DetailsJim Sly
FIRE-Final Inspection4/10/20184/11/20184/11/2018APASS
DetailsJim Page
No fire sprinklers, no fire alarm, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
Zoning Approval4/3/20184/3/20184/3/2018 PASS
DetailsKatelyn Menuge
PubWorks Occupancy Approval3/26/20183/26/20183/26/2018 DONE
DetailsTiffany Lowery
BLD-Framing/Rough-in2/13/20182/14/20182/14/2018APASS
DetailsJim Sly
- Duke Phone #: ###-####
BLD-Wall Bracing2/13/20182/14/20182/14/2018APASS
DetailsJim Sly
shear- Duke Phone #: ###-####
BLD-Conference1/22/20181/22/20181/23/2018PDONE
DetailsJim Sly
Duke Phone #: ###-####
BLD-Other12/20/201712/21/201712/21/2017APASS
DetailsJim Sly
Hole - Duke Phone #: ###-####
Holes for P/T 6x8 columns.
BLD-Conference12/11/201712/12/201712/12/2017ADONE
DetailsJim Sly
btwn 8-10 // Duke Phone #: ###-####
Issue PAID IN FULL permit  12/4/2017 DONE
DetailsChristina Prado
Print Occupancy Form  12/4/2017 DONE
OVERRIDE  11/24/2017  
Plan assigned to (CDM)10/18/201710/18/201711/24/2017 PASS
DetailsCarl D Madsen
Quality Electric
Routing - PLAN CHECK11/10/2017 11/24/2017 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL11/10/2017 11/24/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  11/24/2017 DONE
Permit Ready to Issue  11/24/2017 DONE
DetailsChristina Prado
Need:
ACHD - met
Revised Value - met
GC form - met
Routing - Design Review11/10/2017 11/20/2017 PASS
DetailsKatelyn Menuge
Routing - FIRE11/10/201711/10/201711/14/2017 PASS
DetailsScott Arellano
Attached comments to case
Route to Impact Fee Review11/9/201711/12/201711/9/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  11/9/2017 DONE
Routing - PLAN CHECK10/18/2017 11/9/2017 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL10/18/2017 11/9/2017 FAIL
DetailsCarl D Madsen
Routing - PLANNING Land Div10/18/2017 11/3/2017 PASS
DetailsTodd Tucker
Routing PW Drainage10/19/2017 11/1/2017 PASS
DetailsBrian Murphy
Routing PW Environmental10/19/2017 10/27/2017 PASS
DetailsRick Christenson
Routing PW Solid Waste10/19/2017 10/25/2017 PASS
DetailsEvan Carpenter
Routing - FIRE10/18/201710/18/201710/20/2017 FAIL
DetailsScott Arellano
Attached review comments to case and emailed architect
Routing - Erosion and Sediment10/18/2017 10/20/2017 PASS
DetailsMichael Zawacki
Routing - PUBLIC WORKS10/18/2017 10/19/2017 PASS
DetailsRachael Beierle
Routing - PLANNING10/18/2017 10/19/2017 PASS
DetailsDavid Moser
Planning approval as per DRH and current planning not required.
Routing PW Sewer Rating10/19/2017 10/19/2017 PASS
DetailsMorgan Webb
Routing - Design Review10/18/2017 10/18/2017 FAIL
DetailsKatelyn Menuge
Corrections required, DR Appeal Period Ends October 23rd
Intake Approval  10/18/2017 PASS
Routing - Addressing10/18/2017 10/18/2017 PASS
DetailsDoug Chausow
Intake Approval  10/13/2017 FAIL
Please provide the following items. Pre-Screen 10/13/17
Provide a soils and geotechnical report for the drainage report. The drainage report indicates a referenced geotechnical report but it is not for this property.
Site specific fire flow letter.
Design review approval letter.
Building code analysis on a cover sheet. No Building code analysis has been provided
Vicinity map
Indicate Fire Hydrants
Show current Parking
Intake Approval  10/10/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Please complete and upload the 502 checklist. All required documents shall be uploaded. No pre screen can occur at this time as submittal is not complete.
Application received  9/29/2017 DONE
Application submitted via PDS Online on Sep 29 2017 8:16AM