BLD-Final | 1/22/2018 | 1/23/2018 | 1/23/2018 | A | PASS |
Jim Sly
|
|
|
Please call on your way. Phone #: ###-#### Inspection requested via web by Candyce Moss
|
DOC - Permit Finaled | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PASS |
Jim Sly
|
|
|
Candyce or Gary @ ###-#### Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/23/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/10/2017 | | DONE |
|
|
|
all met
|
Plan assigned to (BJM) | 10/9/2017 | 10/9/2017 | 10/9/2017 | | DONE |
Brian McGowan
|
|
|
sunroom
|
Routing - PLAN CHECK | 10/9/2017 | | 10/9/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2017 | | DONE |
Brian McGowan
|
|
|
ESC NO ENERGY NO
|
Routing Walk-In (Zoning) | 10/4/2017 | 10/4/2017 | 10/4/2017 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 10/4/2017 | 10/4/2017 | 10/4/2017 | A | FAIL |
Brian McGowan
|
|
|
Need updated section. Need insulated panel chart showing allowable spans.
|
1st review completed | | | 10/4/2017 | | FAIL |
Brian McGowan
|
|
|
Need updated section. Need insulated panel chart showing allowable spans.
|
Routing - PLAN CHECK | 10/4/2017 | | 10/4/2017 | | FAIL |
Brian McGowan
|
|
|
Need updated section. Need insulated panel chart showing allowable spans. Connecting to fascia is not allowed. Need alternate attachmment to home.
|
Application received | | | 9/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 29 2017 8:37AM
|
Plan assigned to (JAB) Josh | 9/29/2017 | 9/29/2017 | 9/29/2017 | | DEFR |
Josh Bogle
|
|
|
sunroom
|
Routing - PLANNING | 9/29/2017 | | 9/29/2017 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 9/29/2017 | | PASS |
|
|
|
|