Permit Information
Permit NumberBLD17-03529
StatusIssued
Name ESI
Site Address 350 N MILWAUKEE ST Unit: 2185
Project NameBTS #218 Haagen-Dazs
Customer Number 
ePlanReviewYes
Description
(HAAGEN-DAZS – BTS SPACE #2185) **Permit for minor tenant improvements to an existing 428 sq. ft. ice cream shop within a covered mall building. This tenant space was last remodeled under BLD06-01623 for “Haagen-Das”. Work to include new ACT tiles, new lighting, new equipment, new countertops, refinishing existing millwork, and new finishes. Finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. NOTE: a separate sign permit for interior mall signage is required before sign installation. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/7/20182/8/20182/8/2018APASS
DetailsMike Jordan
Daven Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once fire/life/safety sings perm.
FIRE-Final Inspection2/7/20182/8/20182/8/2018APART
DetailsTroy Cobbley
A temporary for life safety is ok per scott until a fire sprinkler permit is issued/passed for the require fire sprinkler modifications.

Devon Phone #: ###-####
Inspection Record Card- Bld  2/8/2018 DONE
Meeting  2/8/2018 DONE
GC came in to get temp c of o but this permit doesn't get a c of o (they already have it) after talking to the plan reviewer they already have the c of o. They didn't stop business while doing the TI so they just need to get all finals they we can give them the C of C
BLD-Final2/6/20182/7/20182/7/2018PCANC
DetailsDave Hannah
Devin Phone #: ###-####
Telephone call  2/7/2018 DONE
DetailsScott Arellano
Communication with Project Coodinator at ESI (Ryan),

Ryan, Once the field inspectors listed basic life safety items have been completed, call in your final inspection and we can work through the fire sprinkler system issue as appropriate and relative to TVFP’s recommendations.

Regards,

Scott Arellano - Fire Protection Supervisor
FIRE-Final Inspection2/6/20182/6/20182/6/2018PFAIL
DetailsTroy Cobbley
Provide city approved plans/small documents, hang fire extinguisher, repair emergency light in back room, provide fire sprinkler permit for the relocation of the sprinkler pendants that are located too close to one another.

Devin Phone #: ###-####
(F) Reprint permit  11/7/2017 DONE
Telephone call  11/7/2017 DONE
called ESI-they said to meail Anna Mariott not Joe to have this permit signed-I sent it to her for her signature
(F) Reprint permit  11/3/2017 DONE
Issue PAID IN FULL permit  11/2/2017 DONE
Inspection Record Card- Bld  11/2/2017 DONE
Route to Impact Fee Review10/28/201710/31/201710/30/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Permit Ready to Issue  10/30/2017 DONE
DetailsChristina Prado
Need
GC - MET
rev cert of val - MET
impact fees need signed off - MET
Plan assigned to (JAR)10/23/201710/23/201710/28/2017 DONE
DetailsJulie Romig
11/03 - L2 Haagen Dazs Boise
Routing - PLAN CHECK10/23/2017 10/28/2017 PASS
DetailsJulie Romig
1st review completed  10/28/2017 DONE
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  10/28/2017 DONE
Routing - FIRE10/23/201710/23/201710/25/2017 PASS
DetailsErika Akin
Attached review comments to case
Routing - PUBLIC WORKS10/23/2017 10/24/2017 PASS
DetailsRachael Beierle
Routing - Addressing10/23/2017 10/23/2017 PASS
DetailsDoug Chausow
Intake Approval  10/23/2017 PASS
DetailsAdele J Schaffeld-Griffin
Michael completed pre screen
Intake Approval  10/9/2017 FAIL
DetailsMichael Hanson
Applicant needs to provide CDHD information
Application received  9/29/2017 DONE
Application submitted via PDS Online on Sep 29 2017 2:44PM
Intake Approval  9/29/2017 FAIL
DetailsMichael Hanson
Jesse,
Your application is being failed due to the following:
1. All plan sheets must be uploaded individually.
2. Form #304 - needs to be signed.
3. Application needs to be signed.
Please make the following correction and upload again.
Thank you,
Michael Hanson
Boise City PDS
###-####