Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-03531
StatusFinaled
Name ALTECCA LLC
Site Address 350 N MILWAUKEE ST Unit: 5511
Project NameBTS - #5511
Customer Number 
ePlanReviewYes
Description
(JAMBA JUICE – BTS SPACE # 5511 – Kiosk) Permit is for a 250 sq. ft. wet kiosk and a 325 sq. ft. remote storage room into an existing covered mall building. Permit is to bring in a 240 sq. ft. wet kiosk into an existing covered mall building. Fire Retardant Treated wood materials shall be used in the construction of this kiosk as allowed in section 402.6.2 / 2012 IBC. A redline was made about accessible POS counter and verify 20 ft. from other kiosks. work also to include: A walk-in freezer to be installed in a remote storage room location #STORA-1 behind space BTS #1087 within the existing covered mall building, new acoustic ceiling, light fixtures, electrical work, plumbing work and mechanical work. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing - PLUMBING10/17/2017 10/19/2020 PASS
DetailsBill VanDegrift
1) verify venting requirements with the plumbing field inspector before starting work.
2) additional cross connection protection may be required.
First Notice 5/5/20185/10/2018 DONE
mailed 5-11-18
Permanent Occupancy  4/25/2018 DONE
BLD-Final3/8/20183/8/20183/8/2018PPASS
DetailsMike Jordan
Troy Phone #: ###-####. Ok for perm occ. No card on site to sign.
Print Occupancy Form  3/8/2018 DONE
BLD-Final2/21/20182/21/20182/21/2018PFAIL
DetailsMike Jordan
Troy Phone #: ###-####. Provide ADA compliant bar as noted on approved plans.
FIRE-Final Inspection2/21/20182/21/20182/21/2018PPASS
DetailsTroy Cobbley
Life safety passed. Round knob to be removed from the storage room door and replaced with ADA compliant hardware prior to a building inspection.

Troy Phone #: ###-####
BLD-Final2/20/20182/21/20182/21/2018ANR
DetailsMike Jordan
Troy Phone #: ###-####. Needs fire/life/safety.
FIRE-Final Inspection2/20/20182/21/20182/21/2018AFAIL
DetailsTroy Cobbley
Contractor could not meet me when we were each available. Will need to be rescheduled.

Troy Phone #: ###-####
Additional plans submitted  1/29/2018 DONE
GC dropped off approved smoke control documents from engineer and owner.
BLD-Final12/29/201712/29/201712/29/2017PPART
DetailsBrandon Shaw
T/O is OK for kiosk only, storage rooms 1 & 2 to be finished at a later date
BLD-Framing/Rough-in12/22/201712/22/201712/22/2017PPASS
DetailsMike Jordan
Troy Phone #: ###-####
Print Occupancy Form  11/17/2017 DONE
Issue PAID IN FULL permit  11/17/2017 DONE
Plan assigned to (JG)10/17/201710/17/201711/16/2017 PASS
DetailsJavier Guzman
1st rev comp, 10/30 L2 Jamba Juice ePlan, pend plumb/mech
Routing - MECHANICAL11/16/2017 11/16/2017 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  11/16/2017 DONE
Permit Ready to Issue  11/16/2017 DONE
NEED
GC FORM
REVISED CERT
Routing - PLUMBING11/13/2017 11/15/2017 PASS
DetailsBill VanDegrift
VENTING WILL NEED TO BE BELOW FLOOR. CONTACT FIELD INSPECTR FOR VENTING REQUIREMENTS
Routing - PLAN CHECK11/13/2017 11/13/2017 PASS
DetailsJavier Guzman
Routing - MECHANICAL11/13/2017 11/13/2017 FAIL
DetailsTroy James
Need to revise comcheck
Routing - PLAN CHECK11/8/2017 11/9/2017 FAIL
DetailsJavier Guzman
Route to Impact Fee Review11/2/201711/5/201711/6/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  11/2/2017 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK10/17/2017 11/2/2017 FAIL
DetailsJavier Guzman
Routing Off Site - C.D.H10/17/2017 10/26/2017 PASS
DetailsJavier Guzman
signed off in ePlan by Central District Health Department Will Reynolds
Routing - FIRE10/17/201710/17/201710/23/2017 PASS
DetailsScott Arellano
Attached review comments to case
Routing - MECHANICAL10/17/2017 10/17/2017 PASS
DetailsTroy James
Routing - Addressing10/17/2017 10/17/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/17/2017 10/17/2017 PASS
DetailsMorgan Webb
WEST BOISE SEWER DISTRICT
Intake Approval  10/17/2017 PASS
DetailsJavier Guzman
Intake Approval  10/12/2017 FAIL
DetailsMichael Hanson
Ryan,
Thanks for the updated information.
This prescreen is being failed due to the following:
1. Missing lighting COMcheck.
2. Missing mechanical COMcheck.
When completed this prescreen will be approved and proceed to permit review.
Thank You,
Michael Hanson
Boise City
###-####
Intake Approval  10/11/2017 FAIL
DetailsMichael Hanson
Ryan,
This prescreen is being failed due to the following:
1. Missing completed and signed 304 form.
2. Missing completed and signed 518 checklist.
When completing the 518 please provided all necessary information and location on sheets that it can be found. This greatly speeds up the review process so we can serve you faster.
Thank You,
Michael Hanson
Boise City
###-####
Application received  9/29/2017 DONE
Application submitted via PDS Online on Sep 29 2017 4:07PM