BLD-Final | 11/18/2019 | 11/19/2019 | 11/19/2019 | A | PASS |
Jim Storey
|
|
|
Leslie Phone #: ###-####
|
DOC - Permit Finaled | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 7/18/2019 | 7/18/2019 | 7/18/2019 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Energy code compliance | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | PASS |
Jim Storey
|
|
|
Lesley Phone #: ###-####
|
BLD-Energy code compliance | 2/27/2019 | 2/28/2019 | 2/28/2019 | A | NR |
Jim Storey
|
|
|
Lesie Phone #: ###-####
|
BLD-Framing/Rough-in | 2/28/2019 | 2/28/2019 | 2/28/2019 | A | PASS |
Jim Storey
|
|
|
Lesie Phone #: ###-#### framing c/n made ok air seal ok to insulate
|
BLD-Framing/Rough-in | 2/22/2019 | 2/25/2019 | 2/25/2019 | A | PART |
Jim Storey
|
|
|
Lesie Phone #: ###-#### header at entry/ hangers at jack girders 3/ ok to insulate
|
Plan Modification Accepted | | | 1/23/2019 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 1/23/2019 | | 1/23/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | PASS |
Jim Storey
|
|
|
shear // leslie Phone #: ###-####
|
BLD-Foundation | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | PASS |
Brandon Shaw
|
|
|
Mud room to be mono-pour
|
BLD-Footing | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | PASS |
Brandon Shaw
|
|
|
Mudd room to be a mono-pour
|
OVERRIDE | | | 11/14/2018 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/14/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/14/2018 | | DONE |
|
|
|
plan mod
|
Inspection Record Card- Bld | | | 11/14/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/14/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE(plan mod fees due)
|
Plan assigned to (M_H) | 10/30/2018 | | 11/14/2018 | | DONE |
Michael Hanson
|
|
|
10/30 Plan Mod SFD. Applicant has not uploaded anything to review. 10/30/2018 MDH
|
Routing - PLAN CHECK | 10/30/2018 | | 11/14/2018 | | PASS |
Michael Hanson
|
|
|
Plan modifications. 2 hour review fee. MDH
|
Routing - PLANNING | 11/9/2018 | | 11/9/2018 | | PASS |
Katelyn Menuge
|
|
|
Ada County Assessor confirmed lots 20 and 21 are one parcel. See email in agency comments.
|
Routing - PLANNING | 11/1/2018 | | 11/2/2018 | | FAIL |
Katelyn Menuge
|
|
|
The lots must to be consolidated, so there is no property line through the structure. Provide documentation that all structures are on one lot.
Need site plan updated to show breezeway location.
Attaching the garage and the home with a structure requires the garage to have a 15 foot rear setback.
|
Plan Modification Accepted | | | 10/30/2018 | | DONE |
|
|
|
Enclosing breezeway from the detached garage to house. It will be two story (with closet upstairs) and mud room (downstairs).
9 foot wide and 15 deep, for and additional 270 sq. ft.
|
1st review completed | | | 10/30/2018 | | FAIL |
Michael Hanson
|
|
|
Applicant has not uploaded anything to review. 10/30/2018 MDH
|
CHANGE STATUS TO (ISS) | | | 10/18/2018 | | DONE |
|
|
|
|
BLD-Foundation | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PASS |
Jim Storey
|
|
|
Lesley-this is to make sure foundation passes but to also extend the life of the permit Phone #: ###-#### foudation only pending other work.
|
BLD-Aging Inspection | 5/23/2018 | 5/23/2018 | 5/23/2018 | | PASS |
Jim Storey
|
|
|
foudation only pending other work.
|
BLD-Footing | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Jim Storey
|
|
|
Jeremy Phone #: ###-####
|
Inspection Record Card- Bld | | | 12/5/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/5/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 11/22/2017 | | |
|
|
|
|
Plan assigned to (M_H) | 10/31/2017 | | 11/22/2017 | | DONE |
Michael Hanson
|
|
|
10/20 sfd L1 ePlan. Returned to applicant. Need tall wall calculations and lateral calcs at stairs. Also sent to DR. 11/3 MDH
|
Routing - PLAN CHECK | 11/3/2017 | | 11/22/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan Reviewer's activity | | | 11/22/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2017 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 11/22/2017 | | DONE |
|
|
|
Waiting to hear back from Mike about the PRK fees
|
1st review completed | | | 11/3/2017 | | FAIL |
Michael Hanson
|
|
|
Returned to applicant. Need tall wall and lateral calculations. MDH
|
Routing - PLAN CHECK | 10/9/2017 | | 11/3/2017 | | FAIL |
Brian McGowan
|
|
|
Need tall wall and lateral calculations at stair. MDH
|
Routing - PLANNING | 10/9/2017 | | 11/3/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Route to Impact Fee Review | 10/9/2017 | 10/12/2017 | 10/10/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 10/9/2017 | | 10/10/2017 | | PASS |
Troy James
|
|
|
|
Plan assigned to (BJM) | 10/9/2017 | 10/9/2017 | 10/9/2017 | | DEFR |
Brian McGowan
|
|
|
10/20 sfd L1 ePlan
|
Routing - Addressing | 10/9/2017 | | 10/9/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/9/2017 | | 10/9/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/9/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/9/2017 | | DONE |
|
|
|
|
Intake Approval | | | 10/9/2017 | | PASS |
|
|
|
|
Intake Approval | | | 10/3/2017 | | FAIL |
|
|
|
Missing Manual J and cross section
|
Application received | | | 10/2/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 2 2017 12:09AM
|