BLD-Framing/Rough-in | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 10/24/2017 | 10/24/2017 | 10/24/2017 | P | PASS |
Jim Storey
|
|
|
|
Routing Walk-In (Zoning) | 10/17/2017 | 10/17/2017 | 10/17/2017 | P | PASS |
Jeff Lowe
|
|
|
Plan mod to add patio cover to permit
|
Routing Walk-In (BLD) | 10/17/2017 | 10/17/2017 | 10/17/2017 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/17/2017 | | 10/17/2017 | | PASS |
Josh Bogle
|
|
|
modification adding engineering details to patio rebuild JAB
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/17/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for plan mod
|
(F) Reprint permit | | | 10/17/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/17/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/4/2017 | 10/4/2017 | 10/4/2017 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/4/2017 | | 10/4/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/4/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/4/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/4/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/4/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/3/2017 | 10/3/2017 | 10/3/2017 | P | FAIL |
Brian McGowan
|
|
|
More details and drawings required to replace the patio cover. Ledger board detail, slope of cover, rafter size and spacing and beam size.
|
1st review completed | | | 10/3/2017 | | FAIL |
Brian McGowan
|
|
|
More details and drawings required to replace the patio cover. Ledger board detail, slope of cover, rafter size and spacing and beam size.
|
Routing - PLAN CHECK | 10/3/2017 | | 10/3/2017 | | FAIL |
Brian McGowan
|
|
|
More details and drawings required to replace the patio cover. Ledger board detail, slope of cover, rafter size and spacing and beam size.
|
Application received | | 10/3/2017 | | | |
|
|
|
|