BLD-Final | 1/22/2020 | 1/31/2020 | 1/31/2020 | P | PEND |
Tony Young
|
|
|
Aitor Phone #: ###-####// follow up review
|
BLD-Final | 1/2/2020 | 1/21/2020 | 1/22/2020 | P | PEND |
Tony Young
|
|
|
Aitor Phone #: ###-####// follow up review// ok pending hillside public works approval
|
BLD-Final | 12/27/2019 | 1/2/2020 | 1/2/2020 | A | PEND |
Tony Young
|
|
|
Aitor Phone #: ###-####.. ok pending public works hillside
|
BLD-Final | 12/19/2019 | 12/26/2019 | 12/27/2019 | A | PEND |
Tony Young
|
|
|
Aitor Phone #: ###-####
|
BLD-Final | 12/16/2019 | 12/17/2019 | 12/19/2019 | P | PEND |
Tony Young
|
|
|
Aitor Phone #: ###-####,, ok pending public works
|
BLD-Final | 12/13/2019 | 12/16/2019 | 12/16/2019 | A | PEND |
Tony Young
|
|
|
Aitor Phone #: ###-####,, looks ok,, need to find out if PW needs to sign off 1st
|
Telephone call | | | 12/13/2019 | | DONE |
|
|
|
Per phone call with Tony Young ok to charge fee and reopen expried permit
|
CHANGE STATUS TO (ISS) | | | 12/13/2019 | | DONE |
|
|
|
Aitor with Capitol Landscaping in office to reopen expired permit
|
DOC - Permit Expired | 10/8/2018 | 11/21/2018 | 11/20/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/5/2018 | 10/5/2018 | 10/8/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/4/2018 | 10/4/2018 | 10/8/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Footing | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 5/23/2018 | 5/23/2018 | 5/23/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Conference | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | PART |
Tony Young
|
|
|
Ryan, 1212; Phone #: ###-####,, complicated job,, needs soils report,, etc
|
OVERRIDE | | | 5/11/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 5/11/2018 | 5/11/2018 | 5/11/2018 | A | DONE |
Josh Bogle
|
|
|
per CFH17-00056
|
Plan assigned to (JAB) Josh | 4/6/2018 | 4/6/2018 | 5/11/2018 | | PASS |
Josh Bogle
|
|
|
1st done - resubmittal, Hillside deck - waiting on resubmittals
|
Routing - PLAN CHECK | 5/11/2018 | | 5/11/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/11/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/11/2018 | | DONE |
|
|
|
NEED
RP
|
Telephone call | | | 5/11/2018 | | DONE |
|
|
|
Left a message for Dan informing him that this permit is ready, fee amount due and that an RP is needed since the one given is expired
|
Telephone call | | | 5/11/2018 | | DONE |
|
|
|
left a message recommending to send in a request for a 180 day extension since this permit is showing as 39 days past the expiration date.
|
Issue PAID IN FULL permit | | | 5/11/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/11/2018 | | DONE |
|
|
|
two copies of full new plans, stamped and taken to JAB
|
Routing Walk-In (BLD) | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | FAIL |
Josh Bogle
|
|
|
do we need a form #310
|
Plan resubmittals received | | | 4/23/2018 | | DONE |
|
|
|
Resubmittals received 2 sets of sheets L1.00, L1.01, L1.02, L1.03.L1.04, L1-05,L1.06, L1.07,, L1.08, S-101, S-101, S-501, S-502, S-503 1 cover sheet and a srtuc calcs-put on JAB's chair
|
Routing - PLAN CHECK | 4/17/2018 | | 4/17/2018 | | FAIL |
Josh Bogle
|
|
|
see e-mail 4/17/18 - JAB
|
Routing PW Grading-Hillside | 4/6/2018 | | 4/13/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Routing - PUBLIC WORKS | 4/13/2018 | | 4/13/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 4/5/2018 | | 4/5/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Site preparation inspeciton/pre construction conference is required. Certified RP designated.
|
Routing Walk-In (Zoning) | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | PASS |
Jeff Lowe
|
|
|
per CFH17-00056
|
Routing Walk-In (PW Hillside) | 10/4/2017 | 10/4/2017 | 10/4/2017 | A | DONE |
Melissa Jannusch
|
|
|
Sign off per Melissa
|
Routing Walk-In (Zoning) | 10/4/2017 | 10/4/2017 | 10/4/2017 | A | FAIL |
Sue Cummings
|
|
|
Doesn't meet rear setback
|
Routing Walk-In (BLD) | 10/4/2017 | 10/4/2017 | 10/4/2017 | A | FAIL |
Brian McGowan
|
|
|
Planning failed it. Project must show WUI compliance within drawings.
|
1st review completed | | | 10/4/2017 | | FAIL |
Brian McGowan
|
|
|
Planning failed it. Project must show WUI compliance within drawings.
|
Routing - PLAN CHECK | 10/4/2017 | | 10/4/2017 | | FAIL |
Brian McGowan
|
|
|
Planning failed it. Project must show WUI compliance within drawings.
|
Application received | | 10/4/2017 | | | |
|
|
|
|
Routing - PLAN CHECK | 4/5/2018 | | | | |
Josh Bogle
|
|
|
|