BLD-Final | 3/7/2018 | 3/12/2018 | 3/12/2018 | A | DONE |
Tony Young
|
|
|
Kaare Phone #: ###-####
|
BLD-Final | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 3/7/2018 | 3/9/2018 | 3/9/2018 | A | PASS |
Brandon Shaw
|
|
|
Kore Phone #: ###-####
|
BLD-Framing/Rough-in | 1/4/2018 | 1/5/2018 | 1/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####
|
BLD-Energy code compliance | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | NR |
Jim Sly
|
|
|
Jeff Phone #: ###-#### Complete corrections
|
BLD-Framing/Rough-in | 12/29/2017 | 1/2/2018 | 1/2/2018 | A | PART |
Jim Sly
|
|
|
Jeff Phone #: ###-#### C/N posted....BCI joists compromised 2 places.
|
BLD-Conference | 12/15/2017 | 12/18/2017 | 12/18/2017 | A | PASS |
Tony Young
|
|
|
Jeff Phone #: ###-####,, garage wall ?s,, garage firewall,, 2 layers on each side to roof deck and 4 foot out protection on deck
|
BLD-Wall Bracing | 12/14/2017 | 12/15/2017 | 12/15/2017 | P | PASS |
Tony Young
|
|
|
Jeff Phone #: ###-####,, garage ok
|
Plan Modification Accepted | | | 12/13/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 12/13/2017 | | 12/13/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 12/6/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Jim Sly
|
|
|
Shear // Cory Phone #: ###-####
|
BLD-Foundation | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 11/10/2017 | 11/13/2017 | 11/13/2017 | A | PART |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
Issue PAID IN FULL permit | | | 11/1/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/1/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/31/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 10/31/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (JAB) Josh | 10/26/2017 | 10/26/2017 | 10/30/2017 | | PASS |
Josh Bogle
|
|
|
1st done - missing ceiling heights & one egress window
|
Routing - Design Review | 10/30/2017 | | 10/30/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 10/30/2017 | | 10/30/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
1st review completed | | | 10/26/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/4/2017 | | 10/26/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 10/4/2017 | | 10/11/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 10/4/2017 | 10/7/2017 | 10/5/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Application received | | | 10/4/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 4 2017 11:17AM
|
Plan assigned to (BJM) | 10/4/2017 | 10/4/2017 | 10/4/2017 | | DEFR |
Brian McGowan
|
|
|
10/17 sfd L1 ePlan
|
Plans ACCEPTED BY PLAN TECH | | | 10/4/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/4/2017 | | DONE |
|
|
|
|
Intake Approval | | | 10/4/2017 | | PASS |
|
|
|
|
Routing - Addressing | 10/4/2017 | | 10/4/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/4/2017 | | 10/4/2017 | | PASS |
Morgan Webb
|
|
|
CREDIT FOR DEMO
|
Routing - PLANNING | 10/4/2017 | | | | FAIL |
|
|
|
Prior to the City of Boise issuing any building permits, submit written documentation from Idaho Power stating the building separation from the powerline is appropriate and the design of the project has been reviewed and approved. You may coordinate with Cory Bolander at Idaho Power (###-#### or cbolander@idahopower.com).
Submit a common wall agreement for the shared wall between the garages. The applicant has not provided the elevations of the two garage units.
Install a 5-foot concrete sidewalk on N. 29th Street abutting the site.
Close the existing driveway that intersects N. 29th Street with standard curb, gutter and sidewalk to match the surrounding improvements.
Landscape the front yard up to the existing sidewalk on N. 29th Street.
|