Permit Information
Permit NumberBLD17-03614
StatusFinaled
Name ESI
Site Address 1150 W MYRTLE ST
Project NamePanera Bread Cafe #6066
Customer Number 
ePlanReviewYes
Description
(PANERA BREAD CAFE #6066) Permit for the construction of a new 4,700 sq. ft. cafe with work to include general site work and construction of a new type VB building with an associated drive thru per the approved plans. his building is fully fire sprinklered for A2 occupancy over 100. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/20/2018 DONE
Second Notice 10/21/201811/6/2018 DONE
mailed 11-12
First Notice 9/16/201810/11/2018 DONE
mailed 10-12-18
BLD-Final9/5/20189/6/20189/6/2018APASS
DetailsDave Hannah
Please call 5 minutes before on site. Phone #: ###-#### Inspection requested via web by Philip Allen
PubWorks Occupancy Approval9/6/20189/6/20189/6/2018 DONE
DetailsTiffany Lowery
Permanent Occupancy  9/6/2018 DONE
Zoning Approval8/8/20188/8/20188/8/2018 DONE
DetailsAndrea Tuning
BLD-Final7/12/20187/13/20187/13/2018APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Philip Allen ok for temp occ ok for perm after public works gos perm
FIRE-Final Inspection7/12/20187/13/20187/13/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete.

Phone #: ###-#### Inspection requested via web by Philip Allen
Temporary Occupancy7/13/201810/11/20187/13/2018 DONE
DetailsBrittany Hill
FIRE-Final Inspection7/11/20187/12/20187/12/2018PCANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
BLD-Final7/11/20187/12/20187/12/2018PCANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
Zoning Approval Temp7/11/20187/11/20187/11/2018 DONE
DetailsAndrea Tuning
90 day temporary occupancy. Bond has been posetd.
PubWorks Temp Occupancy Appr7/11/20187/11/20187/11/2018 DONE
DetailsTiffany Lowery
Will sign off permanent occupancy when GRD16-00081 and BLD16-03292 has all site work complete and inspected.
BLD-Final7/5/20187/6/20187/6/2018PPEND
DetailsDave Hannah
Requesting TCO for training purposes- Please call when on site. Phone #: ###-#### Inspection requested via web by Philip Allen ok to stock kitchen and train staff.
FIRE-Final Inspection7/5/20187/5/20187/5/2018APART
DetailsJim Page
Partial final life fire safety inspection for TCO complete. Fire extinguishers are in place, fire sprinkler permit is still in issued status and will remain in issued status until underground supply is repaired, fire alarm permit will remain in issued status until fire sprinkler system is made active, fire alarm system is for fire sprinkler riser monitoring and cannot be completed until fire sprinklers are made active. TCO is authorized for 30 days per conversation with Jason Blais, TCO is for employee training only, TCO is also contigent on a 24 hour fire watch, a 24 hour fire watch is REQUIRED until fire sprinkler/fire alarm inspections are complete and finaled.
FIRE-Final Inspection7/2/20187/3/20187/3/2018PFAIL
DetailsJim Page
FIre sprinkler inspection is not complete, building is in no way ready for life fire safety inspection.

No personnel other that construction personnel inside of building until life fire safety inspection is complete.

Please call Phil when on site. Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Conference6/28/20186/29/20186/29/2018PDONE
DetailsDave Hannah
Please call when on site. Phone #: ###-#### Inspection requested via web by Philip Allen
FIRE-Conference6/28/20186/28/20186/28/2018PDONE
DetailsJim Page
Fire conference complete.

Please call Phil Allen at Phone number listed when on site. Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Ceiling Grid Inspection6/25/20186/26/20186/26/2018APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Philip Allen pending trades aproval// ceilling ok to cover
BLD-Conference6/21/20186/22/20186/22/2018ADONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Philip Allen. Concern with landing from south exit to public way.. less than 2% slope to sidewalk.
BLD-Conference6/12/20186/12/20186/12/2018PDONE
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Ceiling Grid Inspection5/16/20185/17/20185/17/2018PPASS
DetailsJim Storey
Hard Lids above Bakery ; Dining Soffits Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Wall cover5/8/20185/9/20185/9/2018APASS
DetailsDave Hannah
Interior walls. Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Energy code compliance5/1/20185/1/20185/1/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Wall cover4/30/20185/1/20185/1/2018ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Footing4/27/20184/30/20184/30/2018APEND
DetailsBrandon Shaw
Exterior Drive Thru Trellis Footing
Pending Special Inspection approval
BLD-Framing/Rough-in4/26/20184/27/20184/27/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Framing/Rough-in4/25/20184/26/20184/26/2018ADEFR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Philip Allen wrong day requisted rolled to fri 27
BLD-Conference4/24/20184/25/20184/25/2018ANR
DetailsDave Hannah
Exterior wall insulate ; cover Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Framing/Rough-in4/17/20184/18/20184/18/2018APART
DetailsDave Hannah
Inspection requested via web by Philip Allen roof sheating ok after mti sign off
BLD-Framing/Rough-in4/17/20184/18/20184/17/2018ACANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
BLD-Concrete3/19/20183/20/20183/22/2018PDONE
DetailsDave Hannah
Building Slab On Grade Prep, Vapor Barrier, Rebar... Special Inspector scheduled as well. Phone #: ###-#### Inspection requested via web by Philip Allen covered by spec inspection
BLD-Footing2/27/20183/1/20183/1/2018APASS
DetailsDave Hannah
Special Inspector scheduled as well Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Footing2/27/20182/28/20182/27/2018PCANC
DetailsDave Hannah
Special Inspector scheduled as well Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
CHANGE STATUS TO (ISS)  1/22/2018 DONE
DetailsChristina Prado
Changed by mistake
Issue PAID IN FULL permit  1/10/2018 DONE
Inspection Record Card- Bld  1/10/2018 DONE
Print Occupancy Form  1/10/2018 DONE
OVERRIDE  11/22/2017  
Plan assigned to (CDM)10/30/201710/30/201711/22/2017 DONE
DetailsCarl D Madsen
Panera Bread
Routing Off Site - STRUCTURAL11/17/2017 11/22/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  11/22/2017 DONE
Permit Ready to Issue  11/22/2017 DONE
DetailsChristina Prado
NEED
ACHD - met
RP - met
GC FORM - met
REVISED CERT - met
Routing - PLAN CHECK11/17/2017 11/17/2017 PASS
DetailsCarl D Madsen
Route to Impact Fee Review11/16/201711/19/201711/16/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing Off Site - STRUCTURAL10/30/2017 11/16/2017 FAIL
DetailsCarl D Madsen
1st review completed  11/16/2017 FAIL
Routing Off Site - C.D.H10/30/2017 11/16/2017 PASS
DetailsCarl D Madsen
Routing - FIRE10/30/201710/30/201711/6/2017 PASS
DetailsScott Arellano
Attached review comments to case
Routing - Erosion and Sediment10/30/2017 11/3/2017 PASS
DetailsAndy J. Long
ESC plan approved under ESC16-01354 (Pioneer Crossing). Need to identify certified RP for project. ESC site preparation required.
Routing PW Environmental10/30/2017 11/3/2017 PASS
DetailsRick Christenson
Routing - PLUMBING10/30/2017 11/1/2017 PASS
DetailsBill VanDegrift
See redline notes and per ISPC.
Routing - PLANNING10/30/2017 10/31/2017 PASS
DetailsLeon Letson
Routing - PLANNING Land Div10/30/2017 10/31/2017 PASS
DetailsLeon Letson
Routing - Design Review10/30/2017 10/31/2017 PASS
DetailsSarah Schafer
approved per DRH17-00183
Routing - MECHANICAL10/30/2017 10/31/2017 PASS
DetailsTroy James
Routing PW Street Lights10/30/2017 10/31/2017 PASS
DetailsTom Marshall
Routing PW Sewer Design10/30/2017 10/31/2017 PASS
DetailsKyle S. Rosenmeyer
Routing PW Solid Waste10/30/2017 10/31/2017 PASS
DetailsEvan Carpenter
Routing PW Drainage10/30/2017 10/30/2017 PASS
DetailsBrian Murphy
Intake Approval  10/30/2017 PASS
Routing - Addressing10/30/2017 10/30/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/30/2017 10/30/2017 PASS
DetailsRachael Beierle
Routing PW Geothermal10/30/2017 10/30/2017 PASS
DetailsJon R. Gunnerson
No Connection to Geothermal. Contact Public Works if desiring to connect onto system. 208.608.7150
Intake Approval  10/10/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Please see submittal check list for items that are missing from this submittal. Some of the items are checked yes and they are not uploaded into the system. There other items noted as NA that are required for this project. Please provide all items indicated in red on the checklist.
Application received  10/5/2017 DONE
Application submitted via PDS Online on Oct 5 2017 5:11PM
Routing - PLAN CHECK10/30/2017    
DetailsJulie Romig