BLD-Final | 11/27/2017 | 11/28/2017 | 11/28/2017 | P | PASS |
Brandon Shaw
|
|
|
Eve Phone #: ###-####
|
DOC - Permit Finaled | 11/28/2017 | 11/28/2017 | 11/28/2017 | P | PASS |
Brandon Shaw
|
|
|
|
Telephone call | | | 11/16/2017 | | DONE |
|
|
|
as per James Ady-Energy Enterprise Group LLC is going to take responsiblity for any work the homeowners did on the electrical portion for the solar panels so homeowner does not need to pull an extra ele permit-i called Eva to let her know and talked to Joseph her husband
|
BLD-Framing/Rough-in | 10/30/2017 | 10/30/2017 | 10/30/2017 | P | CANC |
Brandon Shaw
|
|
|
Needs Electrical final
|
Routing Walk-In (Zoning) | 10/9/2017 | 10/9/2017 | 10/9/2017 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 10/9/2017 | 10/9/2017 | 10/9/2017 | P | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 10/9/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/9/2017 | | 10/9/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/9/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/9/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/9/2017 | | DONE |
|
|
|
|
Application received | | 10/9/2017 | | | |
|
|
|
|