Permit Information
Permit NumberBLD17-03648
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 367 N ANCESTOR PL
Project NameEpisciences Manufacturing Faci
Customer Number 
ePlanReviewYes
Description
(EPISCIENCES MANUFACTURING) This building is fire sprinklered for area increase and story increase. Permit for the construction of a new 18,446 sq. ft., 2-story concrete tilt-up building for a makeup manufacturing and office facility and associated site work. Scope of work includes: construction of slab on grade concrete foundation, concrete tilt up construction, second floor, interior non-bearing walls, restrooms, electrical, mechanical, plumbing, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. All work shall comply with the approved plans, DRH16-00360 and all applicable codes. Note: Special Inspections Required, see form 310. Note: complies with ANSI/ASHREA 90.1. **JAR**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/13/20195/6/2019 DONE
mailed 5-10-19 with first follow up letter
First Follow up  5/6/2019 DONE
Print Statement  4/16/2019 DONE
Third Notice 3/16/20194/8/2019 DONE
mailed 4/11
Third Notice 2/12/20193/11/2019 DONE
mailed 3-12-19
Second Notice 1/18/20192/7/2019 DONE
mailed 2-11-19
First Notice 12/28/20181/8/2019 DONE
mailed 1-11-19
BLD-Final12/17/201812/18/201812/18/2018APASS
DetailsMike Jordan
Tony Phone #: ###-####. OK for perm occ.
Permanent Occupancy  12/18/2018 DONE
BLD-Final12/13/201812/14/201812/14/2018ANR
DetailsMike Jordan
Tony Phone #: ###-####. Needs both mech. permits finaled first.
BLD-Final11/14/201811/15/201811/15/2018PPASS
DetailsMike Jordan
Tony Phone #: ###-####. OK for temp occ. Will be ok for perm occ. once trades sign perm.
FIRE-Final Inspection11/14/201811/15/201811/15/2018APASS
DetailsTroy Cobbley
life safety passed

Tony Phone #: ###-####
Temporary Occupancy11/15/20182/13/201911/15/2018 DONE
DetailsChristina Prado
FIRE-Final Inspection11/13/201811/14/201811/14/2018PFAIL
DetailsTroy Cobbley
Life safety will be ok to final when the project related fire alarm and fire sprinkler permit is addressed.

Tony Phone #: ###-####
BLD-Final11/14/201811/14/201811/14/2018AFAIL
DetailsMike Jordan
Tony Phone #: ###-####. Provide code compliant hardware on west stair.
FIRE-Conference11/7/201811/7/201811/7/2018PDONE
DetailsTroy Cobbley
I verified exit light and emergency light function
Zoning Approval11/1/201811/1/201811/1/2018 PASS
DetailsKatelyn Menuge
PubWorks Occupancy Approval11/1/201811/1/201811/1/2018 DONE
DetailsTiffany Lowery
BLD-Ceiling Grid Inspection10/18/201810/18/201810/18/2018PPASS
DetailsMike Jordan
Ceiling grid for soffits in ware house ok.
BLD-Ceiling Grid Inspection10/17/201810/18/201810/18/2018ACANC
DetailsMike Jordan
Jose Phone #: ###-####.
BLD-Ceiling Grid Inspection10/3/201810/3/201810/3/2018PPASS
DetailsJim Storey
Jose Phone #: ###-####
BLD-Ceiling Grid Inspection9/27/20189/27/20189/27/2018PPASS
DetailsMike Jordan
Jose Phone #: ###-####. 1st. Floor only ok, pending sprinkler rough in.
BLD-Ceiling Grid Inspection9/25/20189/26/20189/27/2018ACANC
DetailsMike Jordan
Jose Phone #: ###-####
BLD-Ceiling Grid Inspection9/26/20189/26/20189/27/2018PCANC
DetailsMike Jordan
BLD-Other8/6/20188/7/20188/7/2018ACANC
DetailsMike Jordan
Jose-plenum wall Phone #: ###-####
BLD-Energy code compliance8/2/20188/2/20188/2/2018PPASS
DetailsMike Jordan
Jose Phone #: ###-####. 2nd.floor ok.
BLD-Energy code compliance7/30/20187/31/20187/31/2018APASS
DetailsMike Jordan
Jose Phone #: ###-####. Exterior walls, north of gridline 2 only, 1st. floor.
BLD-Framing/Rough-in7/31/20187/31/20187/31/2018APART
DetailsMike Jordan
Jose Phone #: ###-####. Interior steel stud framed walls, 1st. and 2nd. floors north of gridline 2. pending plumbing rough in inspection.
BLD-Framing/Rough-in7/12/20187/13/20187/13/2018APART
DetailsMike Jordan
Jose Phone #: ###-####. Interior steel stud framed walls from gridlines 2 to 5 ok. Pending plumbing rough in inspection. Also noted that a select number of the interior full height walls are to be plenum walls. Electrical and plumbing inspectors were notified, as there are additional requirements.
BLD-Framing/Rough-in6/22/20186/25/20186/26/2018APASS
DetailsMike Jordan
Jose Phone #: ###-####. Exterior steel stud columns ok.
BLD-Footing3/12/20183/13/20183/13/2018APART
DetailsMike Jordan
Jose Phone #: ###-####. Interior column pad footings and exterior perimter footings. Pending special inspection.
Issue PAID IN FULL permit  1/30/2018 DONE
Print Occupancy Form  1/30/2018 DONE
Plan assigned to (JAR)11/8/201711/8/20171/26/2018 DONE
DetailsJulie Romig
**1st Rev Comp - 2nd Rec'd 01/17 - 502 Episciences
Routing - PLAN CHECK1/26/2018 1/26/2018 PASS
DetailsJulie Romig
3rd Review - Routed to Design Review
PLANS/APPL TAKEN TO FRONT DESK  1/26/2018 DONE
Permit Ready to Issue  1/26/2018 DONE
email permit to macyl@mcalvain.com
NEED RP -met
GC FORM -met
REVISED VALUE -met
ACHD -met
Routing - Design Review1/25/2018 1/25/2018 PASS
DetailsKatelyn Menuge
Routing - PLAN CHECK1/17/2018 1/22/2018 PASS
DetailsJulie Romig
2nd Review - pending Structural and Design Review approval
Routing Off Site - STRUCTURAL1/17/2018 1/22/2018 PASS
DetailsJulie Romig
2nd Review
Routing - PUBLIC WORKS1/17/2018 1/19/2018 PASS
DetailsMorgan Webb
Routing PW Drainage1/17/2018 1/19/2018 PASS
DetailsBrian Murphy
Routing - PLUMBING1/17/2018 1/18/2018 PASS
DetailsBill VanDegrift
1) vent all traps
2) provide cleanouts per ISPC
3) additional cross connection protection may be required
4) 1/4" per foot grade on 3" and smaller waste piping
5) roof drainage system must be installed per ISPC. May be exterior downspouts.
Routing - Design Review1/17/2018 1/17/2018 FAIL
DetailsKatelyn Menuge
Landscape and light pole modifications required.
Route to Impact Fee Review1/8/20181/11/20181/10/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  1/8/2018 FAIL
DetailsJulie Romig
Routing - PLAN CHECK11/8/2017 1/8/2018 FAIL
DetailsJulie Romig
Routing - PLANNING11/8/2017 1/8/2018 PASS
DetailsJulie Romig
No Review required per Susan Riggs in ePlanReview
Routing PW Sewer Design11/9/2017 1/8/2018 PASS
DetailsMike Sheppard
Routing Off Site - STRUCTURAL11/8/2017 11/27/2017 FAIL
DetailsJulie Romig
Meeting  11/16/2017 DONE
Appendix J taken to Brain Murphy
Routing - MECHANICAL11/8/2017 11/15/2017 PASS
DetailsTroy James
Routing - PLUMBING11/8/2017 11/15/2017 FAIL
DetailsBill VanDegrift
change marks
1) provide rain water system design
2) provide a 4" drain to accept the discharge of the 1 1/2" R.P.
red lines
1) vent all floor drains
2) do not install a combination waste and vent system, vent all fixtures.
Routing - FIRE11/8/201711/8/201711/14/2017 PASS
DetailsScott Arellano
Attached comments to case
Routing PW Environmental11/9/2017 11/14/2017 PASS
DetailsRick Christenson
Routing PW Solid Waste11/9/2017 11/9/2017 PASS
DetailsEvan Carpenter
Routing - Addressing11/8/2017 11/9/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS11/8/2017 11/9/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment11/8/2017 11/9/2017 PASS
DetailsMichael Zawacki
Needs RP
Routing - Design Review11/8/2017 11/9/2017 FAIL
DetailsKatelyn Menuge
Landscape and lighting modifications required.
Intake Approval  11/8/2017 PASS
Intake Approval  10/10/2017 FAIL
DetailsJavier Guzman
Please provide and upload the following:
• Structural calculations stamped and signed by an Idaho licensed engineer.
• Please provide the missing specification book or clarify the specifications are incorporated within building plans
• Please provide owners signature and name of person who completed the form #310
• Please provide a Shallow Injection Well Inventory form from the Idaho Department of Water Resources available at: http://www.idwr.idaho.gov/wells/shallow-injection-wells.html
• Please have the provided ESC Narrative for this specific project signed by a plan designer certified by Boise City.
• Please provide the missing Recorded document (with instrument number) for all new and existing sewer easements
• Uploaded ESC Plans must be prepared and signed by a plan designer certified by Boise City.
• Please show location of the Portable fire extinguisher locations (checklist indicates this is a shell exception but the plans show this is going to be built out)
• Please provide a Commissioning Plan printed on the plans per 2012 IECC, you can also include a separate attached document. Form #308 IECC System Commissioning Agencies can be found at this link: http://pds.cityofboise.org/home/documents/apps/300/# (For new mechanical systems combined capacity 480,000 Btu/h or greater)
Application received  10/9/2017 DONE
Application submitted via PDS Online on Oct 9 2017 3:00PM
Routing - PLANNING Land Div11/8/2017    
DetailsTodd Tucker
Routing PW Drainage11/9/2017   FAIL
DetailsBrian Murphy
APDEX J AND PERC TEST