BLD-Final | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Jim Sly
|
|
|
Jen Phone #: ###-####
|
DOC - Permit Finaled | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 10/31/2017 | 11/1/2017 | 11/1/2017 | A | PART |
Jim Sly
|
|
|
Matt Phone #: ###-#### Met with Home owner..........Told him that I would inspect Epoxy dowels if Structural engineer would allow......Setbacks OK. Still need to inspect Engineered retro fit footings.
|
BLD-Framing/Rough-in | 10/31/2017 | 11/1/2017 | 11/1/2017 | A | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 10/17/2017 | 10/17/2017 | 10/18/2017 | P | PASS |
Jim Sly
|
|
|
Jen Phone #: ###-####
|
Routing Walk-In (Zoning) | 10/11/2017 | 10/11/2017 | 10/11/2017 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 10/11/2017 | 10/11/2017 | 10/11/2017 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/11/2017 | | 10/11/2017 | | PASS |
|
|
|
|
1st review completed | | | 10/11/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/11/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/11/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 10/11/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/11/2017 | | DONE |
|
|
|
|
Application received | | 10/11/2017 | | | |
|
|
|
|