Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD17-03687
StatusFinaled
Name BUILT
Site Address 2003 N 28TH ST
Project Name 
Customer NumberDRH17-00489
ePlanReviewNo
Description
Permit for a 222 sq ft addition to the rear of the home. Addition includes a new stairway to the basement and laundry room relocating to the main floor. Braced walls are engineered, 7/16" osb blocked at all edges, no hold-downs. All work per plans, engineering, & local code. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/23/20182/23/20182/23/2018PDONE
DetailsTony Young
Brian Phone #: ###-####
DOC - Permit Finaled2/23/20182/23/20182/23/2018PPASS
DetailsTony Young
BLD-Ceiling Grid Inspection2/22/20182/23/20182/23/2018ADONE
DetailsTony Young
Brian Phone #: ###-####
DOC - Permit Finaled2/23/20182/23/20182/23/2018PPASS
DetailsTony Young
BLD-Energy code compliance12/14/201712/15/201712/15/2017APASS
DetailsTony Young
Brian; Phone #: ###-####
BLD-Framing/Rough-in12/12/201712/12/201712/12/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by brian mcgaha
BLD-Framing/Rough-in12/11/201712/11/201712/11/2017PNR
DetailsDave Hannah
Pending mechanical inspection this AM Phone #: ###-#### Inspection requested via web by brian mcgaha needs air seal and fire blocking
BLD-Framing/Rough-in12/8/201712/8/201712/8/2017PNR
DetailsJim Storey
Give me a ring or text if/when you know your coming by Phone #: ###-#### Inspection requested via web by brian mcgaha
BLD-Wall Bracing11/27/201711/27/201711/27/2017PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by brian mcgaha
BLD-Footing10/27/201710/30/201710/30/2017APASS
DetailsDave Hannah
Darrel; Phone #: ###-####
BLD-Footing10/27/201710/27/201710/27/2017PNR
DetailsTony Young
Issue PAID IN FULL permit  10/25/2017 DONE
Routing Walk-In (BLD)10/20/201710/20/201710/20/2017ADONE
DetailsJosh Bogle
Routing Walk-In (Zoning)10/19/201710/19/201710/20/2017APASS
DetailsKatelyn Menuge
Building permit may be issued during the appeal period with the understanding that if an appeal is filed, all approvals are suspended pending the outcome of the appeal and all work must cease immediately.
Routing - PLAN CHECK10/20/2017 10/20/2017 PASS
DetailsJosh Bogle
1st review completed  10/20/2017 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  10/20/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  10/20/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/20/2017 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  10/20/2017 DONE
Need:
RP
MET GC FORM
Meeting  10/19/2017 DONE
took plans to Jeff in P & Z-he will take it to the planner that did the DRH-i asked him to bring it back to me when they were done until we hear from Ken Reed
Telephone call  10/19/2017 DONE
Keith called and said they will bring the signed list in to Katelyn for the DRH and will give to Josh B
Telephone call  10/19/2017 DONE
called Ken-left a message on his phone that we don't know where the plans came from or/and if he left them-did he already talk to P & Z-i asked him to call us and let us know what's going on with them
Routing Walk-In (Zoning)10/11/201710/11/201710/11/2017PPASS
DetailsJosh Bogle
no contact with applicant JAB
Application received 10/11/2017