Permit Information
Permit NumberBLD17-03692
StatusFinaled
Name EVERGREEN CONSTRUCTION LLC
Site Address 2872 S CANONERO WAY
Project Name2872 Canonero Way
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2,562 sq. ft., two story (first story 1,814 sq. ft., second story 768 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 230 sq. ft. of covered patio/porch and a 1,058 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/20/20192/21/20192/21/2019APASS
DetailsBrandon Shaw
garage code 4646 Phone #: ###-#### Inspection requested via web by Chris Laraway
DOC - Permit Finaled2/21/20192/21/20192/21/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results2/21/20192/21/20192/21/2019ADONE
DetailsBrandon Shaw
ACH50- 4.9
BLD-Final2/18/20192/19/20192/19/2019AFAIL
DetailsMike Jordan
Garage Code 4646. Thank you, Phone #: ###-#### Inspection requested via web by Chris Laraway. Glazing at mid landing of stairs is required to be tempered. Provide the blower door test results and post or the 3rd party airseal report. Correction notice posted.
Fees Due Hold2/19/20192/19/20192/19/2019 DONE
DetailsRita DeYoung
Fees owed on SWR. See Rita, Angela or Morgan
BLD-Aging Inspection8/1/20188/1/20188/1/2018 CANC
DetailsMike Jordan
BLD-Aging Inspection7/31/20187/31/20188/1/2018 PASS
DetailsMike Jordan
BLD-Wall cover3/19/20183/19/20183/19/2018PDONE
DetailsJim Storey
FYI, Momentum provided 3rd party inspection of insulation. Phone #: ###-#### Inspection requested via web by Chris Larawaycovered check at final .
BLD-Energy code compliance3/12/20183/12/20183/12/2018PPASS
DetailsMike Jordan
foam seal ; 3 shear hold down points in west wall. Phone #: ###-#### Inspection requested via web by Chris Laraway
BLD-Wall Bracing2/23/20182/26/20182/26/2018APASS
DetailsMike Jordan
Mr Jordan, Please call 30 min prior to arrival on site so I may meet with you on the corrections made. Thank you
~Chris Phone #: ###-#### Inspection requested via web by Chris Laraway
BLD-Wall Bracing1/29/20181/31/20181/31/2018AFAIL
DetailsMike Jordan
Framer is on site. Phone #: ###-#### Inspection requested via web by Chris Laraway. Install all mising hold downs on first floor, install missing floor to floor strap on 2nd. floor. Provide portal frame in back or engineering. Provide the wall bracing on garage wall. Correction notice issued. ok to tyvek.
Plan Modification Accepted  1/23/2018 DONE
new manual j report
Routing - MECHANICAL1/23/2018 1/23/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Foundation12/13/201712/13/201712/13/2017PPART
DetailsMike Jordan
Ready at 1:30 - James Phone #: ###-####
BLD-Footing12/11/201712/12/201712/12/2017APART
DetailsMike Jordan
late am please// James Phone #: ###-####
Inspection Record Card- Bld  11/29/2017 DONE
Issue PAID IN FULL permit  11/29/2017 DONE
Telephone call  11/27/2017 DONE
emailed Chris Laraway need to pay impact fees to issue permit and release approved plans.
OVERRIDE  11/24/2017  
Plan Reviewer's activity  11/24/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/24/2017 DONE
Permit Ready to Issue  11/24/2017 DONE
Plan assigned to (M_H)11/8/2017 11/24/2017 DONE
DetailsMichael Hanson
11/1 sfd L1 ePlan - 1st review complete RTA wall bracing deficiencies.
Routing - PLAN CHECK10/19/2017 11/24/2017 PASS
DetailsJosh Bogle
1st review completed  11/15/2017 FAIL
DetailsMichael Hanson
Returned to applicant. Wall bracing deficiencies.
Route to Impact Fee Review10/19/201710/22/201710/20/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL10/20/2017 10/20/2017 PASS
DetailsTroy James
Routing - MECHANICAL10/19/2017 10/20/2017 FAIL
DetailsTroy James
Emailed correction to TML
Routing - PLANNING10/19/2017 10/20/2017 PASS
DetailsSue Cummings
Routing - Addressing10/19/2017 10/20/2017 PASS
DetailsDoug Chausow
Plan assigned to (BJM)10/19/201710/19/201710/19/2017 DEFR
DetailsBrian McGowan
11/1 sfd L1 ePlan
Routing - PUBLIC WORKS10/19/2017 10/19/2017 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  10/19/2017 DONE
Recd Pcfee & Taken To Pln CK  10/19/2017 DONE
Intake Approval  10/19/2017 PASS
Intake Approval  10/12/2017 FAIL
Site plans needs to be of whole parcel.
Crawl vents on foundation plan or details of a condition crawl space.
Stair section needs details of treads and risers.
Intake Approval  10/12/2017 FAIL
Per resubmittals standards all files must use the Exact same file name as the original drawing.
Application received  10/11/2017 DONE
Application submitted via PDS Online on Oct 11 2017 4:54PM