Third Notice | | 3/18/2018 | 3/20/2018 | | DONE |
|
|
|
This permit finaled on the web by Garrett Bailey
|
Third Notice | | 2/17/2018 | 3/13/2018 | | DONE |
|
|
|
Mailed 3-14-18
|
Third Notice | | 1/17/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
Second Notice | | 12/22/2017 | 1/12/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
First Notice | | 12/11/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-17
|
Permanent Occupancy | | | 12/1/2017 | | DONE |
|
|
|
|
BLD-Final | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 11/30/2017 | 11/30/2017 | 11/30/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, life fire safety inspection for area of work passed/complete.
|
Temporary Occupancy | 11/7/2017 | 12/7/2017 | 11/7/2017 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 11/3/2017 | 11/6/2017 | 11/6/2017 | A | PART |
Jim Page
|
|
|
No fire alarm modifications, fire extinguishers are in common areas with current inspection tags. TCO for life fire safety is authorized for 30 days per conversation with Scott Arellano, TCO is contingent on the fire sprinkler modifications being completed. Once fire sprinkler work is completed then life fire safey can be finaled.
|
BLD-Final | 11/3/2017 | 11/6/2017 | 11/6/2017 | P | PART |
Jim Storey
|
|
|
30 heads up please- Garret Phone #: ###-#### tco ok FYI – See below regarding TCO on BLD17-03697 if that is all that is remaining.
Jason
|
FIRE-Final Inspection | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | FAIL |
Troy Cobbley
|
|
|
The existing sprinkler pendants are overspaced in atleast four locations and will need modified. I also noted that I would need to verify the hardware on the two new doors when installed. The annual inspection for the sprinkler system is current.
|
BLD-Framing/Rough-in | 11/1/2017 | 11/2/2017 | 11/2/2017 | A | PASS |
Jim Storey
|
|
|
call 30 min ahead // Garrett Phone #: ###-####
|
BLD-Framing/Rough-in | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | DEFR |
Jim Storey
|
|
|
call 30 min ahead // Garrett Phone #: ###-####
|
Print Occupancy Form | | | 10/27/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/27/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/19/2017 | 10/19/2017 | 10/26/2017 | | PASS |
Javier Guzman
|
|
|
10/25 L1 Logger Creek LLC Suite #200 ePlan
|
Routing - PLAN CHECK | 10/19/2017 | | 10/26/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 10/26/2017 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/26/2017 | | DONE |
|
|
|
Need
GC Form
Revised Cert of Value
|
Routing PW Flood Plain | 10/19/2017 | | 10/20/2017 | | PASS |
Jason C. Taylor
|
|
|
Project is a minor TI on 2nd floor. Jason Taylor ###-####
|
Intake Approval | | | 10/19/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 10/19/2017 | | 10/19/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/19/2017 | | 10/19/2017 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 10/13/2017 | | FAIL |
Michael Hanson
|
|
|
Treya,
This permit has failed prescreen due to the following:
1. Building plans must be stamped and signed by a licensed Idaho architect
2. Provide ceiling information (suspended ceiling or indication of "no changes")
3. Provide exit signs and emergency lighting locations
4. Provide portable fire extinguisher locations
5. Provide lighting information (plans, new fixtures, relocated fixtures, lighting schedule).
Thank You,
Michael Hanson
Boise City
###-####
|
Application received | | | 10/12/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 12 2017 11:30AM
|