Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-03699
StatusFinaled
Name M R C INDUSTRIAL CONTRACTOR INC
Site Address 1161 W RIVER ST
Project NameVerizon Wireless - BOI BSU
Customer Number 
ePlanReviewYes
Description
(VERIZON WIRELESS - BOI BSU) Permit for the modifications to the existing cellular roof top antenna mount assembly with work to include removal of (6) existing 8’ panel antennas and replace with (6) new 6’ JAHH-65B-R3B panel antennas, removal of (3) existing 60W AWS RRH units and replace with (3) new 90W AWS RRH units, adding (3) new 850 RRH units, relocating (3) existing 700 RRH units, relocating (3) existing PCS RRH units and relocating (3) existing MOVP units, adding associated to antennas (6) new pipe mounts, at equipment shelter removal of (1) existing 700 TRDU and adding one (1) new PDF. There will be some minor modifications within the existing shelter, but no changes to the rooftop space or the height of the building. Structural engineering and plans provided. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/15/20182/16/20182/20/2018APASS
DetailsDave Hannah
Joey Phone #: ###-####
DOC - Permit Finaled2/20/20182/20/20182/20/2018APASS
DetailsDave Hannah
Issue PAID IN FULL permit  2/15/2018 DONE
Plan assigned to (JG)10/12/201710/12/201710/30/2017 PASS
DetailsJavier Guzman
1st rev comp, 10/18 L2 Verizon BOI BSU ePlan
Routing - PLAN CHECK10/19/2017 10/30/2017 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/30/2017 DONE
Permit Ready to Issue  10/30/2017 DONE
Need
GC
Rev Cert of Val
Route to Impact Fee Review10/16/201710/19/201710/16/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLANNING10/12/2017 10/16/2017 PASS
DetailsNicolette Womack
signed off in ePlAN BY Current Planning Nicolette Womack
1st review completed  10/16/2017 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK10/12/2017 10/14/2017 FAIL
DetailsJavier Guzman
Application received  10/12/2017 DONE
Application submitted via PDS Online on Oct 12 2017 12:17PM
Intake Approval  10/12/2017 PASS
DetailsJavier Guzman
First Notice2/20/20182/20/2018   
DetailsDave Hannah