BLD-Framing/Rough-in | 11/29/2017 | 11/30/2017 | 11/30/2017 | A | PASS |
Dave Hannah
|
|
|
Nick Phone #: ###-####
|
BLD-Wall Bracing | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | PASS |
Dave Hannah
|
|
|
Nick Phone #: ###-####
|
BLD-Foundation | 10/19/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Footing | 10/18/2017 | 10/19/2017 | 10/20/2017 | A | PASS |
Dave Hannah
|
|
|
John Pullman Phone #: ###-####
|
OVERRIDE | | | 10/13/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | PASS |
KayCee Babb
|
|
|
|
Routing Walk-In (BLD) | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | DONE |
Jason C. Taylor
|
|
|
|
Routing Walk-In PW FloodPlain | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | PASS |
Jason C. Taylor
|
|
|
Garage only (500 sqft), plans show flood vents in doors (600 sqft) and stem walls 1' above HAG. Jason Taylor ###-####
|
Routing - PLAN CHECK | 10/13/2017 | | 10/13/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/13/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/13/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/13/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/13/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
KayCee Babb
|
|
|
|
Routing Walk-In (BLD) | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | FAIL |
Josh Bogle
|
|
|
need flood plain details
|
1st review completed | | | 10/12/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/12/2017 | | 10/12/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 10/12/2017 | | | |
|
|
|
|