Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-03709
StatusFinaled
Name ESI
Site Address 850 W FRONT ST
Project NameBoise Centre Restroom Remodel
Customer Number 
ePlanReviewYes
Description
(BOISE CENTRE CONVENTION CENTER – 1ST FLOOR RESTROOM REMODEL) The fire sprinkler system is used for fire area. Permit is to remodel 2,082 sq. ft. of existing men’s and women’s restrooms and entry lobby/ballroom work on the main floor of the existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior walls, removal of interior finishes, removal of select door/door frames, removal of select counters, removal of plumbing fixtures and accessories, removal of select gypsum ceiling and select soffits, construction of select interior non-bearing walls, select wall infill, select new door/door frame, new accessible restrooms for the disabled, new plumbing fixtures and accessories, select new acoustic ceiling, relocated and new light fixtures, lowering an existing lobby suspended acoustic ceiling, select new soffits, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/15/20185/18/2018 DONE
Third Notice 4/15/20185/10/2018 DONE
mailed 5-11-18

email from Robin, 4-16-18, stating they will try to get final values to us this week. Informed I would note email and we send out notices once a month.
Third Notice 3/19/20184/10/2018 DONE
mailed 4-11-18
Second Notice 2/22/20183/14/2018 DONE
Mailed 3-15-18
First Notice2/1/20182/1/20182/12/2018 DONE
DetailsDave Hannah
Mailed 2-13-18
BLD-Final2/1/20182/1/20182/1/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike Beeson
DOC - Permit Finaled2/1/20182/1/20182/1/2018PPASS
DetailsDave Hannah
BLD-Final1/30/20181/31/20182/1/2018PPEND
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike Beeson ok for temp occ
Letter of compliance/Occupancy  2/1/2018 DONE
FIRE-Final Inspection1/29/20181/30/20181/30/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, thumb-turn function for deadbolts on restroom doors has been made inoperable. Final life fire safety inspection for area of work complete.
FIRE-Final Inspection1/26/20181/26/20181/26/2018AFAIL
DetailsJim Page
Door holder magnets were not in place at time of inspection. Doors/door hardware were not installed on restroom doors at time of inspection. Fire alarms did not work correctly for final inspection which resulted in a failed inspection.
FIRE-Final Inspection1/24/20181/24/20181/24/2018PFAIL
DetailsJim Page
Project attached permits for fire alarm and fire sprinkler needs to be inspected and finaled before life fire safety inspection can be performed.
BLD-Ceiling Grid Inspection1/18/20181/19/20181/19/2018APASS
DetailsDave Hannah
Please call when you are heading this way, Thanks Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in1/12/20181/12/20181/12/2018APASS
DetailsDave Hannah
We got a UL rated drawing from the Architect on those columns. Please call Jake at ###-#### and he can meet you with a printed copy. Everything is wrapped with 2 layers and the ones on the west wall has three layers on the face. Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in1/10/20181/11/20181/12/2018PPASS
DetailsDave Hannah
Jake is on site during the day. Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in1/7/20181/8/20181/8/2018APART
DetailsDave Hannah
Restroom framing, all backing is done in fire treated lumber. Phone #: ###-#### Inspection requested via web by Mike Beeson ok to insulate and cover all but for around colunms colunms need fire proofing
BLD-Framing/Rough-in1/2/20181/3/20181/3/2018APASS
DetailsDave Hannah
Framing at lobby entry to Ballroom Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in12/27/201712/27/201712/27/2017PPART
DetailsDave Hannah
Framing inspection, Mike Beeson Phone #: ###-#### Inspection requested via web by Mike Beeson bottom of sofits
Issue PAID IN FULL permit  11/8/2017 DONE
Inspection Record Card- Bld  11/8/2017 DONE
Plan assigned to (JG)10/17/201710/17/201711/3/2017 PASS
DetailsJavier Guzman
10/30 L2 Boise Centre Restroom Remodel ePlan
Routing - PLAN CHECK10/17/2017 11/3/2017 PASS
DetailsJavier Guzman
1st review completed  11/3/2017 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/3/2017 DONE
Permit Ready to Issue  11/3/2017 DONE
NEED
GC -Met
Rev Cert of Val- Met
Routing - PLUMBING10/17/2017 10/20/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - FIRE10/17/201710/17/201710/19/2017 PASS
DetailsScott Arellano
Attached review comments to case
Routing - MECHANICAL10/17/2017 10/18/2017 PASS
DetailsTroy James
Intake Approval  10/17/2017 PASS
DetailsJavier Guzman
Routing - Addressing10/17/2017 10/17/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/17/2017 10/17/2017 PASS
DetailsMorgan Webb
CREDITS GIVEN FOR DEMO
Application received  10/13/2017 DONE
Application submitted via PDS Online on Oct 13 2017 10:23AM