Permit Information
Permit NumberBLD17-03713
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 7152 E HIGHLAND VALLEY RD
Project NameMontage B
Customer Number 
ePlanReviewYes
Description
*** HILLSIDE, WUI ZONE "A" REQUIREMENTS CLASS "A" ROOF / 1 HR RATED SOFFITS / NON-COMBUSTIBLE EXTERIOR*** Permit for the construction of a new 2,461 sq. ft., two story (first story 909 sq. ft., second story 1,552 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 115 sq. ft. of deck and a 830 sq. ft. attached garage per the approved plans and any notations. R-1C/DA zoning and setbacks per planning. MDH


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  3/6/2019 DONE
BLD-Final10/18/201810/19/201810/19/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled10/19/201810/19/201810/19/2018PPASS
DetailsDave Hannah
BLD-Blower Door Test Results10/18/201810/19/201810/19/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall 3.7
PubWorks Occupancy Approval10/17/201810/17/201810/17/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable and as-builts have been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Energy code compliance6/28/20187/2/20187/2/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in6/26/20186/28/20186/28/2018APASS
DetailsBrandon Shaw
OK to insulate
BLD-Wall Bracing6/11/20186/12/20186/12/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Footing3/29/20183/29/20183/29/2018PPASS
DetailsBrandon Shaw
Work in progress
PubWorks Subgrade Approval3/29/20183/29/20183/29/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

(F) Reprint permit  2/20/2018 DONE
Inspection Record Card- Bld  2/20/2018 DONE
Inspection Record Card- Bld  2/15/2018 DONE
Issue PAID IN FULL permit  2/15/2018 DONE
OVERRIDE  2/14/2018  
Routing - PLAN CHECK1/2/2018 2/14/2018 PASS
DetailsMichael Hanson
Routing PW Grading-Hillside2/14/2018 2/14/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
PLANS/APPL TAKEN TO FRONT DESK  2/14/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  2/14/2018 DONE
Plan assigned to (M_H)11/13/2017 2/14/2018 DONE
DetailsMichael Hanson
11/02 sfd L2 ePlan - 1st review completed. Return to applicant - Failed hillside and foundation/grading plan coordination. MDH
Routing PW Grading-Hillside2/2/2018 2/2/2018 FAIL
DetailsMelissa Jannusch
See changemark in ePlan. Footing elevation do not match detail. See changemark dated 1/19/2018
Routing - PLAN CHECK12/7/2017 1/2/2018 FAIL
DetailsBrian McGowan
RTA - Failed hillside and foundation/grading plan coordination. MDH
Routing PW Grading-Hillside1/2/2018 1/2/2018 FAIL
DetailsJason C. Taylor
see changemarks in eplan. JCT
Routing - PLAN CHECK11/16/2017 12/7/2017 FAIL
DetailsBrian McGowan
RTA - Applicant did not resolve hillside requirements. MDH
Routing PW Grading-Hillside11/30/2017 12/4/2017 FAIL
DetailsJason C. Taylor
see changemarks in eplan. JCT
Routing - PLANNING11/30/2017 11/30/2017 PASS
DetailsSue Cummings
1st review completed  11/16/2017 FAIL
DetailsMichael Hanson
RTA - Failed hillside and foundation/grading plan coordination. MDH
Routing - PLAN CHECK10/16/2017 11/16/2017 FAIL
DetailsBrian McGowan
RTA - Failed hillside and foundation/grading plan coordination. MDH
Routing - FIRE10/16/201710/16/201710/20/2017 PASS
DetailsErika Akin
Plans were reviewed for FD access, availability of hydrants and defensible space.
Routing - MECHANICAL10/16/2017 10/19/2017 PASS
DetailsChad Schwendiman
Routing PW Grading-Hillside10/16/2017 10/18/2017 FAIL
DetailsMelissa Jannusch
See cahngemarks in ePlan
Route to Impact Fee Review10/16/201710/19/201710/17/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Erosion and Sediment10/16/2017 10/17/2017 PASS
DetailsMichael Zawacki
BMPs need to follow approved map. RP & PD good. Site prep required.
Plan assigned to (BJM)10/16/201710/16/201710/16/2017 DEFR
DetailsBrian McGowan
11/2 sfd L2 ePlan
Plans ACCEPTED BY PLAN TECH  10/16/2017 DONE
Recd Pcfee & Taken To Pln CK  10/16/2017 DONE
Intake Approval  10/16/2017 PASS
Routing - PLANNING10/16/2017 10/16/2017 PASS
DetailsSue Cummings
Routing - Addressing10/16/2017 10/16/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/16/2017 10/16/2017 PASS
DetailsRachael Beierle
Application received  10/13/2017 DONE
Application submitted via PDS Online on Oct 13 2017 11:13AM