Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD17-03752
StatusIssued
Name BIG D BUILDERS
Site Address 10988 W JOPLIN RD
Project NameSunRoc Batch Plant
Customer Number 
ePlanReviewYes
Description
(SUNROC) //PLAN MODIFICATION #2 TO CHANGE THE SIZE OF THE BUILDING FROM 1,695 TO APPROX. 1,118 SQ. FT. (28’ X 39’). 19-30-2019 JG// - //Plan Modification to footing/foundation, changing size of building from 1,698 sq. ft. (26’ x 65’4”) to 1,829 sq. ft. (28’ x 65’4”) and removed previous building structural framing plans from project due to changing building to a pre-engineered metal building (see those plans for structural framing). 11-26-2018 JG// Permit to construct a new 1,698 sq. ft. unheated metal building to enclose the existing batch plant equipment. Scope of work includes: construction of footing foundation, construction of the new metal framing, metal rib siding and roofing per the approved plans and the attached engineering. Some electrical work. This building is not fire sprinkled. Note: special inspection required see attached form #310. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection5/15/20205/15/20205/20/2020 PEND
DetailsTell Riley
BLD-Framing/Rough-in12/31/20191/2/20201/2/2020PPART
DetailsTell Riley
Ferd--###-####//310 form provided--no specials for bolting of members//still need specials for added/moved anchor bolts for upright column//roof bolt connections ok per plans, no bracing installed at this time//
BLD-Framing/Rough-in12/30/201912/31/201912/31/2019PPART
DetailsTell Riley
Inspection requested via web by Ferd Smith//WIP//talked to Ferd, need 310 form, added anchors for uprights, specials for post installed//will need another framinng inspection//
BLD-Foundation11/6/201911/6/201911/7/2019PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Ferd Smith//will adjust rebar for side form clearances//ok--plan mod approved//ok pending special inspections//
Plan Reviewer's activity  11/6/2019 DONE
DetailsJavier Guzman
added in the small documents of ePlan the foundation modification design
BLD-Footing11/1/201911/1/201911/1/2019PPART
DetailsTell Riley
After 9:30 am please but before the afteroon Phone #: ###-#### Inspection requested via web by Ferd Smith//ok when plan mod is approved for existing conditions--engineering onsite//pending all special inspection approvals//
BLD-Footing10/31/201911/1/201911/1/2019ACANC
DetailsTell Riley
Please call when you are about 30 minutes from being on jobsite.
Thank you
Ferd Smith
###-#### Phone #: ###-#### >> Inspection requested via web by Ferd Smith Inspection cancelled from web by: Ferd Smith
CHANGE STATUS TO (ISS)  10/15/2019 DONE
plan mod fee paid change to ISS
Plan assigned to (JG)9/23/20199/23/201910/14/2019 PASS
DetailsJavier Guzman
10/10 Plan Mod, SunRoc Batch Plant, pend eng
Routing Off Site - C.D.H9/30/2019 10/14/2019 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers
Permit Ready to Issue  10/14/2019 DONE
NEED Revised Value for plan mod
Routing - PLAN CHECK9/30/2019 10/11/2019 PASS
DetailsJavier Guzman
Routing PW Flood Plain10/1/2019 10/8/2019 CANC
DetailsJason C. Taylor
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
Routing - PLANNING9/30/2019 10/1/2019 PASS
DetailsDavid Moser
Routing - PUBLIC WORKS9/30/2019 10/1/2019 PASS
DetailsMorgan Webb
Plan Modification Accepted  9/23/2019 DONE
the extent of the metal siding has been reduced, design modified to include 4' high wainscott wall below metal siding. electrical drawings changed as needed
Issue PAID IN FULL permit  4/5/2019 DONE
Inspection Record Card- Bld  4/5/2019 DONE
Meeting  4/1/2019 DONE
sent an email to tiffany (big d builders), Peter, Bill and Steve informing them that this permit is going to expire in 9 days and has already had the two extensions. informed permit will need to be paid for and issued or voided and resubmit to go through the process again.
Meeting  3/18/2019 DONE
sent email to peter informing him that this permit is going to expire and that two extension have already been granted. informed him that all the documents needs to be turned in and fees paid or let us know if this permit needs to be voided and will reapply at a later date
Route to Impact Fee Review12/31/20181/4/201912/31/2018 PASS
DetailsEric Bilimoria
modification
Plan assigned to (JG)11/6/201811/6/201812/31/2018 PASS
DetailsJavier Guzman
1st rev comp, Plan Mod SunRoc Batch Plant ePlan 12/19
Routing - PLAN CHECK12/19/2018 12/31/2018 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL12/19/2018 12/31/2018 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Dave Haugland
Permit Ready to Issue  12/31/2018 DONE
MET
Need:
GC Form
Certificate of Value

MET
ACHD
Routing Off Site - STRUCTURAL11/23/2018 12/7/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineers Dave Haugland

Routing - PLAN CHECK11/23/2018 11/26/2018 FAIL
DetailsJavier Guzman
Plan Reviewer's activity  11/7/2018 DONE
DetailsJavier Guzman
Provide and upload the following:
• Provide a completed #522 plan mod application
• Provide a cloud on modified plans to show what is being modified
• Provide re-upload the revised plans with the same naming convection as the previous plans on file so that the new file will version (I have removed the five files you have uploaded so that there will not be excess files and create a confusion)
Plan resubmittals received  11/6/2018 DONE
eplan review
change structural connection details to allow for the future disassembly an drelocation of the batch plant
Extend Review Timeline  10/15/2018 DONE
Final 180 day extension per Adele. see documents
Meeting  9/25/2018 DONE
sent in extension request
Expiration Notice9/18/201810/9/20189/18/2018 DONE
DetailsBrittany Hill
Extend Review Timeline  3/28/2018 DONE
1st approved 180 day extension per Adele. See documents
Expiration Notice3/20/20184/10/20183/20/2018 DONE
DetailsBrittany Hill
Route to Impact Fee Review11/14/201711/17/201711/15/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Permit Ready to Issue  11/15/2017  
Need
GC FORM
REVISED CERT
Plan assigned to (JG)10/18/201710/18/201711/14/2017 PASS
DetailsJavier Guzman
11/07 SunRoc Batch Plant ePlan
Routing - PLAN CHECK10/18/2017 11/14/2017 PASS
DetailsJavier Guzman
1st review completed  11/14/2017 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/14/2017 DONE
Routing Off Site - STRUCTURAL10/18/2017 11/14/2017 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Dave Haugland
Routing - FIRE10/18/201710/18/201711/2/2017 PASS
DetailsScott Arellano
Attached comments to plans.
Hold  11/1/2017 DONE
Required Fire Hydrant location previously approved under a BLD15-02824 under approved code alternate; as per Fire Marshal.
Routing PW Flood Plain10/19/2017 10/20/2017 PASS
DetailsJason C. Taylor
Project is outside floodplain. Jason Taylor ###-####
Routing PW Drainage10/19/2017 10/19/2017 PASS
DetailsBrian Murphy
STATE MINING LAW NO JURISTDICTION
Routing - PLANNING10/18/2017 10/19/2017 PASS
DetailsDavid Moser
CUP14-00051
Routing - PLANNING Land Div10/18/2017 10/19/2017 PASS
DetailsTodd Tucker
Routing - PUBLIC WORKS10/18/2017 10/19/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment10/18/2017 10/19/2017 PASS
DetailsAndy J. Long
No ESC permit required. Project within active gravel pit and concrete batch plant.
Intake Approval  10/18/2017 PASS
Routing - Addressing10/18/2017 10/18/2017 PASS
DetailsDoug Chausow
Application received  10/17/2017 DONE
Application submitted via PDS Online on Oct 17 2017 11:33AM