BLD-Aging Inspection | 5/15/2020 | 5/15/2020 | 5/20/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 12/31/2019 | 1/2/2020 | 1/2/2020 | P | PART |
Tell Riley
|
|
|
Ferd--###-####//310 form provided--no specials for bolting of members//still need specials for added/moved anchor bolts for upright column//roof bolt connections ok per plans, no bracing installed at this time//
|
BLD-Framing/Rough-in | 12/30/2019 | 12/31/2019 | 12/31/2019 | P | PART |
Tell Riley
|
|
|
Inspection requested via web by Ferd Smith//WIP//talked to Ferd, need 310 form, added anchors for uprights, specials for post installed//will need another framinng inspection//
|
BLD-Foundation | 11/6/2019 | 11/6/2019 | 11/7/2019 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Ferd Smith//will adjust rebar for side form clearances//ok--plan mod approved//ok pending special inspections//
|
Plan Reviewer's activity | | | 11/6/2019 | | DONE |
Javier Guzman
|
|
|
added in the small documents of ePlan the foundation modification design
|
BLD-Footing | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PART |
Tell Riley
|
|
|
After 9:30 am please but before the afteroon Phone #: ###-#### Inspection requested via web by Ferd Smith//ok when plan mod is approved for existing conditions--engineering onsite//pending all special inspection approvals//
|
BLD-Footing | 10/31/2019 | 11/1/2019 | 11/1/2019 | A | CANC |
Tell Riley
|
|
|
Please call when you are about 30 minutes from being on jobsite. Thank you Ferd Smith ###-#### Phone #: ###-#### >> Inspection requested via web by Ferd Smith Inspection cancelled from web by: Ferd Smith
|
CHANGE STATUS TO (ISS) | | | 10/15/2019 | | DONE |
|
|
|
plan mod fee paid change to ISS
|
Plan assigned to (JG) | 9/23/2019 | 9/23/2019 | 10/14/2019 | | PASS |
Javier Guzman
|
|
|
10/10 Plan Mod, SunRoc Batch Plant, pend eng
|
Routing Off Site - C.D.H | 9/30/2019 | | 10/14/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers
|
Permit Ready to Issue | | | 10/14/2019 | | DONE |
|
|
|
NEED Revised Value for plan mod
|
Routing - PLAN CHECK | 9/30/2019 | | 10/11/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Flood Plain | 10/1/2019 | | 10/8/2019 | | CANC |
Jason C. Taylor
|
|
|
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Routing - PLANNING | 9/30/2019 | | 10/1/2019 | | PASS |
David Moser
|
|
|
|
Routing - PUBLIC WORKS | 9/30/2019 | | 10/1/2019 | | PASS |
Morgan Webb
|
|
|
|
Plan Modification Accepted | | | 9/23/2019 | | DONE |
|
|
|
the extent of the metal siding has been reduced, design modified to include 4' high wainscott wall below metal siding. electrical drawings changed as needed
|
Issue PAID IN FULL permit | | | 4/5/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2019 | | DONE |
|
|
|
|
Meeting | | | 4/1/2019 | | DONE |
|
|
|
sent an email to tiffany (big d builders), Peter, Bill and Steve informing them that this permit is going to expire in 9 days and has already had the two extensions. informed permit will need to be paid for and issued or voided and resubmit to go through the process again.
|
Meeting | | | 3/18/2019 | | DONE |
|
|
|
sent email to peter informing him that this permit is going to expire and that two extension have already been granted. informed him that all the documents needs to be turned in and fees paid or let us know if this permit needs to be voided and will reapply at a later date
|
Route to Impact Fee Review | 12/31/2018 | 1/4/2019 | 12/31/2018 | | PASS |
Eric Bilimoria
|
|
|
modification
|
Plan assigned to (JG) | 11/6/2018 | 11/6/2018 | 12/31/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Plan Mod SunRoc Batch Plant ePlan 12/19
|
Routing - PLAN CHECK | 12/19/2018 | | 12/31/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 12/19/2018 | | 12/31/2018 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Dave Haugland
|
Permit Ready to Issue | | | 12/31/2018 | | DONE |
|
|
|
MET
Need:
GC Form
Certificate of Value
MET
ACHD
|
Routing Off Site - STRUCTURAL | 11/23/2018 | | 12/7/2018 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Dave Haugland
|
Routing - PLAN CHECK | 11/23/2018 | | 11/26/2018 | | FAIL |
Javier Guzman
|
|
|
|
Plan Reviewer's activity | | | 11/7/2018 | | DONE |
Javier Guzman
|
|
|
Provide and upload the following:
• Provide a completed #522 plan mod application
• Provide a cloud on modified plans to show what is being modified
• Provide re-upload the revised plans with the same naming convection as the previous plans on file so that the new file will version (I have removed the five files you have uploaded so that there will not be excess files and create a confusion)
|
Plan resubmittals received | | | 11/6/2018 | | DONE |
|
|
|
eplan review
change structural connection details to allow for the future disassembly an drelocation of the batch plant
|
Extend Review Timeline | | | 10/15/2018 | | DONE |
|
|
|
Final 180 day extension per Adele. see documents
|
Meeting | | | 9/25/2018 | | DONE |
|
|
|
sent in extension request
|
Expiration Notice | 9/18/2018 | 10/9/2018 | 9/18/2018 | | DONE |
Brittany Hill
|
|
|
|
Extend Review Timeline | | | 3/28/2018 | | DONE |
|
|
|
1st approved 180 day extension per Adele. See documents
|
Expiration Notice | 3/20/2018 | 4/10/2018 | 3/20/2018 | | DONE |
Brittany Hill
|
|
|
|
Route to Impact Fee Review | 11/14/2017 | 11/17/2017 | 11/15/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 11/15/2017 | | |
|
|
|
Need
GC FORM
REVISED CERT
|
Plan assigned to (JG) | 10/18/2017 | 10/18/2017 | 11/14/2017 | | PASS |
Javier Guzman
|
|
|
11/07 SunRoc Batch Plant ePlan
|
Routing - PLAN CHECK | 10/18/2017 | | 11/14/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 11/14/2017 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/18/2017 | | 11/14/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Dave Haugland
|
Routing - FIRE | 10/18/2017 | 10/18/2017 | 11/2/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Hold | | | 11/1/2017 | | DONE |
|
|
|
Required Fire Hydrant location previously approved under a BLD15-02824 under approved code alternate; as per Fire Marshal.
|
Routing PW Flood Plain | 10/19/2017 | | 10/20/2017 | | PASS |
Jason C. Taylor
|
|
|
Project is outside floodplain. Jason Taylor ###-####
|
Routing PW Drainage | 10/19/2017 | | 10/19/2017 | | PASS |
Brian Murphy
|
|
|
STATE MINING LAW NO JURISTDICTION
|
Routing - PLANNING | 10/18/2017 | | 10/19/2017 | | PASS |
David Moser
|
|
|
CUP14-00051
|
Routing - PLANNING Land Div | 10/18/2017 | | 10/19/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - PUBLIC WORKS | 10/18/2017 | | 10/19/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 10/18/2017 | | 10/19/2017 | | PASS |
Andy J. Long
|
|
|
No ESC permit required. Project within active gravel pit and concrete batch plant.
|
Intake Approval | | | 10/18/2017 | | PASS |
|
|
|
|
Routing - Addressing | 10/18/2017 | | 10/18/2017 | | PASS |
Doug Chausow
|
|
|
|
Application received | | | 10/17/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 17 2017 11:33AM
|