Permit Information
Permit NumberBLD17-03754
StatusFinaled
Name MARSH CREEK LLC
Site Address 5613 W OVERLAND RD
Project NameVerizon Wireless Boi Curtis
Customer Number 
ePlanReviewYes
Description
(VERIZON WIRELESS - BOI CURTIS) **Permit for the modifications to the existing cellular tower with work to include removal of (6) WWX063X13G00 antennas, (3) 60W AWS RRH’s. New installation of (6) panel antennas, (3) CWX063X19X00 panel antennas, (3) 90W AWS RRH Units, (3) 80W 850 RRH Units, (9) proposed pipe mounts, (6) side by side RRH antenna mounts. Relocation of (3) CWX063X19X00. No changes to the height of the tower and minor equipment modification to interior of existing ground equipment structure. Structural engineering and plans provided. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice5/7/20185/7/20189/11/2018 DONE
DetailsBrandon Shaw
This permit finaled on the web by Kim Anderson
BLD-Final5/7/20185/7/20185/7/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kaleb Checketts
DOC - Permit Finaled5/7/20185/7/20185/7/2018PPASS
DetailsBrandon Shaw
Issue PAID IN FULL permit  12/15/2017 DONE
DetailsChristina Prado
Inspection Record Card- Bld  12/15/2017 DONE
Plan assigned to (JAR)10/26/201710/26/201711/22/2017 DONE
DetailsJulie Romig
1st Rev Comp - L3 Verizon Wireless antenna replacement
Routing - PLAN CHECK10/26/2017 11/22/2017 PASS
DetailsJulie Romig
1st review completed  11/22/2017 DONE
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  11/22/2017 DONE
Permit Ready to Issue  11/22/2017 DONE
MET
NEED
GC FORM
REVISED CERT
Routing - PLANNING10/26/2017 10/26/2017 PASS
DetailsLeon Letson
Intake Approval  10/26/2017 PASS
Intake Approval  10/18/2017 FAIL
Please provide the structural calculations to support the engineers report.
Please provide the plan sheets with a minimum 18 x 24 plan sheet size per the checklist requirements.
Please provide the required stamping area in the lower right hand corner of each plan sheet per the eplan submittal requirements.
Please upload any zoning approval letters.
Application received  10/17/2017 DONE
Application submitted via PDS Online on Oct 17 2017 12:54PM