Permit Information
Permit NumberBLD17-03778
StatusFinaled
Name DATUM CONSTRUCTION MANAGEMENT INC
Site Address 10499 W FAIRVIEW AVE
Project NameBelmont Plaza - ACE Vanilla TI
Customer Number 
ePlanReviewYes
Description
(BELMONT PLAZA – ACE Vanilla TI) **NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR PERMIT PRIOR TO OCCUPYING THE SPACE. Permit to remodel an existing 17,744 sq ft retail tenant space within the existing Belmont Plaza. The building was previously occupied by K-Mart and subdivided into smaller tenant spaces under shell/core permit BLD17-01449. Work to include demo of exterior masonry wall for new openings; infill of existing openings in exterior wall; demo of interior non-bearing partitions; new floor slab; new stair; new interior non-bearing walls; new plumbing, electrical, and mechanical work; and new interior finishes in compliance with Ch. 8 of the 2012 IBC. Special inspections required per Form 310. The fire sprinkler system is used for unlimited area of the building AND to allow 3-hr fire barrier walls in lieu of fire walls. The fire sprinkler system is NOT allowed to be used for building area increase for A Occupancies. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/16/20187/10/2018 DONE
mailed 7-11-18
Second Notice 5/21/20186/11/2018 DONE
mailed 6-12
First Notice5/4/20185/4/20185/11/2018 DONE
DetailsMike Jordan
mailed 5-14
BLD-Final5/4/20185/4/20185/4/2018PPASS
DetailsMike Jordan
DOC - Permit Finaled5/4/20185/4/20185/4/2018PPASS
DetailsMike Jordan
BLD-Final5/3/20185/4/20185/4/2018ACANC
DetailsMike Jordan
Cody Phone #: ###-####
FIRE-Final Inspection5/3/20185/4/20185/3/2018APASS
DetailsTroy Cobbley
Life safety passed. Per verbal agreement the existing red fire lane painting will be extended to the west end of the building complex next week when stripping occurs.
Cody Phone #: ###-####
BLD-Conference3/7/20183/7/20183/7/2018PDONE
DetailsTroy Cobbley
It appears that coverage is missing in the entry vestible that was constructed during the shell phase of this project. Coverage is still missing under the stair.
BLD-Final2/13/20182/14/20182/14/2018PPART
DetailsMike Jordan
late PM please // Cody Phone #: ###-####. Vanilla TI ok for Temp occ. until the sheel and core and facade are completed and life safety signs perm.
FIRE-Final Inspection2/13/20182/14/20182/14/2018APART
DetailsTroy Cobbley
A temporary for life safety is being given with Scott's approval until the exit discharge light is installed at the main exit and sprinkler protection is provided under the new stairs to the mezzanine.

Cody Phone #: ###-####
BLD-Final2/13/20182/13/20182/13/2018PNR
DetailsMike Jordan
CODY JONES Phone #: ###-####
FIRE-Final Inspection2/13/20182/13/20182/13/2018PFAIL
DetailsTroy Cobbley
Provide city approved plans and notes, provide installation that matches the approved plans such as fire extinguisher layout and exit signs and emergency lights and exit discharge lights. Exit discharge lights can not be on timer or photo sensor.

CODY JONES Phone #: ###-####
Zoning Approval2/13/20182/13/20182/13/2018 DONE
DetailsSarah Schafer
FIRE-Final Inspection1/30/20181/31/20182/1/2018PFAIL
DetailsTroy Cobbley
Need plans for inspection, address and exit discharge light
BLD-Final1/30/20181/31/20181/31/2018PNR
DetailsMike Jordan
Egor Phone #: ###-####
BLD-Framing/Rough-in1/29/20181/30/20181/30/2018PPASS
DetailsMike Jordan
Byern Phone #: ###-####. Interior steel stud framed walls for new vestibule. Steel column and header wrap(2layers type X Dense glass for hr. rating on exterior at new store front opening.)
Inspection Record Card- Bld  1/26/2018 DONE
(F) Reprint permit  1/25/2018 DONE
Issue PAID IN FULL permit  12/12/2017 DONE
Inspection Record Card- Bld  12/12/2017 DONE
OVERRIDE  11/30/2017  
Plan assigned to (JAR)10/31/201710/31/201711/30/2017 DONE
DetailsJulie Romig
**1st Rev Comp - 2nd Rec'd 11/17 - L2 ACE Vanilla Shell Project
Routing - PLAN CHECK11/17/2017 11/30/2017 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  11/30/2017 DONE
Permit Ready to Issue  11/30/2017 DONE
DetailsChristina Prado
Need
RP - met
Cert of Value - met
GC - met
Route to Impact Fee Review11/14/201711/17/201711/14/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK10/31/2017 11/14/2017 FAIL
DetailsJulie Romig
See corrections in ePlanReview
1st review completed  11/14/2017 FAIL
DetailsJulie Romig
Routing - FIRE10/31/201710/31/201711/6/2017 PASS
DetailsScott Arellano
Attached review comments to case
Routing PW Environmental10/31/2017 11/3/2017 PASS
DetailsRick Christenson
Routing - Erosion and Sediment10/31/2017 11/2/2017 PASS
DetailsMichael Zawacki
Minor TI
Intake Approval  10/31/2017 PASS
DetailsJavier Guzman
Routing - MECHANICAL10/31/2017 10/31/2017 PASS
DetailsTroy James
Routing - PLUMBING10/31/2017 10/31/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing10/31/2017 10/31/2017 PASS
DetailsDoug Chausow
Correct address 10499 W Fairview Ave
Routing - PUBLIC WORKS10/31/2017 10/31/2017 PASS
DetailsRachael Beierle
Routing - Design Review10/31/2017 10/31/2017 PASS
DetailsSarah Schafer
Application received  10/18/2017 DONE
Application submitted via PDS Online on Oct 18 2017 6:14PM