Third Notice | | 6/16/2018 | 7/10/2018 | | DONE |
|
|
|
mailed 7-11-18
|
Second Notice | | 5/21/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
First Notice | 5/4/2018 | 5/4/2018 | 5/11/2018 | | DONE |
Mike Jordan
|
|
|
mailed 5-14
|
BLD-Final | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | CANC |
Mike Jordan
|
|
|
Cody Phone #: ###-####
|
FIRE-Final Inspection | 5/3/2018 | 5/4/2018 | 5/3/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per verbal agreement the existing red fire lane painting will be extended to the west end of the building complex next week when stripping occurs. Cody Phone #: ###-####
|
BLD-Conference | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | DONE |
Troy Cobbley
|
|
|
It appears that coverage is missing in the entry vestible that was constructed during the shell phase of this project. Coverage is still missing under the stair.
|
BLD-Final | 2/13/2018 | 2/14/2018 | 2/14/2018 | P | PART |
Mike Jordan
|
|
|
late PM please // Cody Phone #: ###-####. Vanilla TI ok for Temp occ. until the sheel and core and facade are completed and life safety signs perm.
|
FIRE-Final Inspection | 2/13/2018 | 2/14/2018 | 2/14/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given with Scott's approval until the exit discharge light is installed at the main exit and sprinkler protection is provided under the new stairs to the mezzanine.
Cody Phone #: ###-####
|
BLD-Final | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | NR |
Mike Jordan
|
|
|
CODY JONES Phone #: ###-####
|
FIRE-Final Inspection | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans and notes, provide installation that matches the approved plans such as fire extinguisher layout and exit signs and emergency lights and exit discharge lights. Exit discharge lights can not be on timer or photo sensor.
CODY JONES Phone #: ###-####
|
Zoning Approval | 2/13/2018 | 2/13/2018 | 2/13/2018 | | DONE |
Sarah Schafer
|
|
|
|
FIRE-Final Inspection | 1/30/2018 | 1/31/2018 | 2/1/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need plans for inspection, address and exit discharge light
|
BLD-Final | 1/30/2018 | 1/31/2018 | 1/31/2018 | P | NR |
Mike Jordan
|
|
|
Egor Phone #: ###-####
|
BLD-Framing/Rough-in | 1/29/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Mike Jordan
|
|
|
Byern Phone #: ###-####. Interior steel stud framed walls for new vestibule. Steel column and header wrap(2layers type X Dense glass for hr. rating on exterior at new store front opening.)
|
Inspection Record Card- Bld | | | 1/26/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/25/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/12/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 11/30/2017 | | |
|
|
|
|
Plan assigned to (JAR) | 10/31/2017 | 10/31/2017 | 11/30/2017 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 2nd Rec'd 11/17 - L2 ACE Vanilla Shell Project
|
Routing - PLAN CHECK | 11/17/2017 | | 11/30/2017 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/30/2017 | | DONE |
Christina Prado
|
|
|
Need
RP - met
Cert of Value - met
GC - met
|
Route to Impact Fee Review | 11/14/2017 | 11/17/2017 | 11/14/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 10/31/2017 | | 11/14/2017 | | FAIL |
Julie Romig
|
|
|
See corrections in ePlanReview
|
1st review completed | | | 11/14/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 10/31/2017 | 10/31/2017 | 11/6/2017 | | PASS |
Scott Arellano
|
|
|
Attached review comments to case
|
Routing PW Environmental | 10/31/2017 | | 11/3/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - Erosion and Sediment | 10/31/2017 | | 11/2/2017 | | PASS |
Michael Zawacki
|
|
|
Minor TI
|
Intake Approval | | | 10/31/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 10/31/2017 | | 10/31/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 10/31/2017 | | 10/31/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 10/31/2017 | | 10/31/2017 | | PASS |
Doug Chausow
|
|
|
Correct address 10499 W Fairview Ave
|
Routing - PUBLIC WORKS | 10/31/2017 | | 10/31/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 10/31/2017 | | 10/31/2017 | | PASS |
Sarah Schafer
|
|
|
|
Application received | | | 10/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 18 2017 6:14PM
|