BLD-Final | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.6
|
PubWorks Occupancy Approval | 8/28/2018 | 8/28/2018 | 8/28/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Blower Door Test Results | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Final | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Energy code compliance | 5/20/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 5/16/2018 | 5/18/2018 | 5/18/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Other | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Brandon Shaw
|
|
|
Luna-soffits Phone #: ###-####
|
BLD-Wall cover | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Brandon Shaw
|
|
|
Luna Phone #: ###-####
|
BLD-Foundation | 2/12/2018 | 2/12/2018 | 2/12/2018 | P | PASS |
Jim Storey
|
|
|
Wall // Ryan Phone #: ###-####
|
BLD-Footing | 2/7/2018 | 2/8/2018 | 2/8/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 2/7/2018 | 2/7/2018 | 2/7/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 11/27/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/27/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 11/22/2017 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 11/17/2017 | 11/17/2017 | 11/22/2017 | | PASS |
Josh Bogle
|
|
|
1st done - shear plan lacks detail
|
Routing - PLAN CHECK | 11/22/2017 | | 11/22/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 11/22/2017 | | DONE |
|
|
|
|
1st review completed | | | 11/18/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/20/2017 | | 11/18/2017 | | FAIL |
Josh Bogle
|
|
|
|
Plan assigned to (BJM) | 10/20/2017 | 10/20/2017 | 11/17/2017 | | DEFR |
Brian McGowan
|
|
|
11/8 sfd L2 ePlan
|
Routing - MECHANICAL | 10/20/2017 | | 10/27/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Routing PW Grading-Hillside | 10/20/2017 | | 10/26/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - FIRE | 10/20/2017 | 10/20/2017 | 10/25/2017 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Route to Impact Fee Review | 10/20/2017 | 10/23/2017 | 10/23/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Erosion and Sediment | 10/20/2017 | | 10/23/2017 | | PASS |
Michael Zawacki
|
|
|
|
Routing - PLANNING | 10/20/2017 | | 10/20/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 10/20/2017 | | 10/20/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/20/2017 | | 10/20/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/20/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/20/2017 | | DONE |
|
|
|
|
Intake Approval | | | 10/20/2017 | | PASS |
|
|
|
|
Application received | | | 10/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 19 2017 7:17AM
|