Permit Information
Permit NumberBLD17-03779
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 7102 E HIGHLAND VALLEY RD
Project NameMontage B
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2,465 sq. ft., two story (first story 912 sq. ft., second story 1,552 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 96 sq. ft. of covered patio/porch and a 826 sq. ft. attached garage per the approved plans, engineering, any notations, & local code. R-1C/DA zoning and setbacks per planning. Separate electrical, plumbing & mechanical permits required. **JAB**

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/28/20188/29/20188/29/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled8/29/20188/29/20188/29/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results8/28/20188/29/20188/29/2018ADONE
DetailsBrandon Shaw
ACH50- 4.6
PubWorks Occupancy Approval8/28/20188/28/20188/28/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Blower Door Test Results8/23/20188/24/20188/24/2018ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
BLD-Final8/23/20188/24/20188/24/2018ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
BLD-Energy code compliance5/20/20185/22/20185/22/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in5/16/20185/18/20185/18/2018APASS
DetailsBrandon Shaw
OK to insulate
BLD-Other4/24/20184/24/20184/24/2018PPASS
DetailsBrandon Shaw
Luna-soffits Phone #: ###-####
BLD-Wall cover4/24/20184/24/20184/24/2018PPASS
DetailsBrandon Shaw
Luna Phone #: ###-####
BLD-Foundation2/12/20182/12/20182/12/2018PPASS
DetailsJim Storey
Wall // Ryan Phone #: ###-####
BLD-Footing2/7/20182/8/20182/8/2018APASS
DetailsBrandon Shaw
Work in progress
PubWorks Subgrade Approval2/7/20182/7/20182/7/2018 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  11/27/2017 DONE
Inspection Record Card- Bld  11/27/2017 DONE
OVERRIDE  11/22/2017  
Plan assigned to (JAB) Josh11/17/201711/17/201711/22/2017 PASS
DetailsJosh Bogle
1st done - shear plan lacks detail
Routing - PLAN CHECK11/22/2017 11/22/2017 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  11/22/2017 DONE
DetailsJosh Bogle
Permit Ready to Issue  11/22/2017 DONE
1st review completed  11/18/2017 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK10/20/2017 11/18/2017 FAIL
DetailsJosh Bogle
Plan assigned to (BJM)10/20/201710/20/201711/17/2017 DEFR
DetailsBrian McGowan
11/8 sfd L2 ePlan
Routing - MECHANICAL10/20/2017 10/27/2017 PASS
DetailsChad Schwendiman
Routing PW Grading-Hillside10/20/2017 10/26/2017 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - FIRE10/20/201710/20/201710/25/2017 PASS
DetailsErika Akin
Plans were reviewed for FD access, availability of hydrants and defensible space.
Route to Impact Fee Review10/20/201710/23/201710/23/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Erosion and Sediment10/20/2017 10/23/2017 PASS
DetailsMichael Zawacki
Routing - PLANNING10/20/2017 10/20/2017 PASS
DetailsSue Cummings
Routing - Addressing10/20/2017 10/20/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/20/2017 10/20/2017 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  10/20/2017 DONE
Recd Pcfee & Taken To Pln CK  10/20/2017 DONE
Intake Approval  10/20/2017 PASS
Application received  10/19/2017 DONE
Application submitted via PDS Online on Oct 19 2017 7:17AM