Permit Information
Permit NumberBLD17-03810
StatusIssued
Name JUANG HUEI-MING
Site Address 709 W PUEBLO ST
Project Name 
Customer Number 
ePlanReviewNo
Description
MODIFICATION TO REPLACE ALL SIDING & ALL WINDOWS EXCEPT FOR THE BAY (DRH18-00052 & DRH18-00096) **jab** DRH17-00504 - Permit to add a new window in existing bathroom. All work per plans & local code. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection9/5/20189/5/20189/5/2018 PEND
DetailsTony Young
BLD-Aging Inspection9/4/20189/4/20189/5/2018 PEND
DetailsTony Young
Routing Walk-In (BLD)3/26/20183/26/20183/26/2018ADONE
DetailsJosh Bogle
Routing Walk-In (Zoning)3/26/20183/26/20183/26/2018APASS
DetailsTed Vanegas
Routing - PLAN CHECK3/26/2018 3/26/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/26/2018 DONE
DetailsJosh Bogle
Modification, added value - No ESC, No Energy
Permit Ready to Issue  3/26/2018 DONE
CHANGE STATUS TO (ISS)  3/26/2018 DONE
Inspection Record Card- Bld  3/26/2018 DONE
Routing Walk-In (BLD)3/16/20183/16/20183/16/2018PFAIL
DetailsMichael Hanson
"Pre" Discussed new windows, siding, plan mod. She want a awning now and is historical so advised to get information meet with historical again and will only charge one plan mod fee when all information is gathered. MDH
Routing Walk-In (BLD)3/9/20183/9/20183/9/2018ACANC
DetailsJosh Bogle
applicant updating Historic C of A - will return for a permit later
Routing Walk-In (Zoning)10/20/201710/20/201710/20/2017PPASS
DetailsTed Vanegas
Routing Walk-In (BLD)10/20/201710/20/201710/20/2017PDONE
DetailsJosh Bogle
Routing - PLAN CHECK10/20/2017 10/20/2017 PASS
DetailsJosh Bogle
1st review completed  10/20/2017 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  10/20/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  10/20/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/20/2017 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  10/20/2017 DONE
as per Katelynn (Ted V was not in to answer)- we can issue the permit before the 10 day appeal period but to let the customer know that changes may have to be done if anyone contests. I told Hue-Ming and so she knows
Issue PAID IN FULL permit  10/20/2017 DONE
Application received 10/20/2017