Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD17-03817
StatusFinaled
Name CANDICE HOPKINS
Site Address 1333 W JEFFERSON ST
Project NameWaxed LLC - Occupancy
Customer Number 
ePlanReviewNo
Description
(WAXED LLC – SOUTH END OF THE BASEMENT) This building does not have a fire sprinkler system. Application for inspection to determine the requirements for the issuance of a Certificate of Occupancy for a 931 square foot tenant space located in the basement of an existing building to be used for waxing, facials, treatments, and massages. Harmful chemicals are not allowed to be used. This tenant is not a medical office. No one is allowed to be rendered incapable of self-preservation. This tenant space was previously part of the other tenant space located within this building on the 1st story and in the basement. Egress is directly to the outside to an exterior stairway that leads up to grade. No new work is authorized under this permit except guards, handrails, and minor work that may be needed to correct noncompliant conditions that may exist. Painting, carpeting, counter tops, shelves, and similar finish work are not required to have a building permit. New work is required to comply with the 2012 IBC and with all other applicable codes and ordinances. Compliance is required with the items listed in the plan review report under Referenced Code Sections because noncompliance with these items is believed to constitute a distinct hazard to life and safety. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/24/20182/14/2018 DONE
no values sent out on occ permits
Permanent Occupancy  2/14/2018 DONE
BLD-Final2/5/20182/6/20182/6/2018PPASS
DetailsDave Hannah
Candice Phone #: ###-####
BLD-Final2/5/20182/5/20182/5/2018PNH
DetailsTony Young
Candice Phone #: ###-####
Telephone call  2/5/2018 DONE
emailed Candice that the temp c of o expires next week
BLD-Aging Inspection1/15/20181/15/20181/17/2018 PEND
DetailsTony Young
BLD-Final11/14/201711/14/201711/15/2017PPART
DetailsDave Hannah
Candice-would like to know if you can do as early as possilbe in the PM Phone #: ###-#### ok for temp occ needs to change door hardware and add handrail
Temporary Occupancy11/15/20172/13/201811/15/2017 DONE
DetailsTiffany Carson-Herker
BLD-Final11/13/201711/14/201711/14/2017ANR
DetailsTony Young
Candice-would like to know if you can do as early as possilbe in the PM Phone #: ###-####
FIRE-Final Inspection11/13/201711/14/201711/14/2017APASS
DetailsJim Page
Previously noted items have been repaired. No fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection passed/complete.
BLD-Final11/3/201711/6/201711/6/2017PNR
DetailsTony Young
Candice Phone #: ###-####,, needs fire 1st
FIRE-Final Inspection11/3/201711/6/201711/6/2017AFAIL
DetailsJim Page
Surface mount slide bolt lock on exterior exit door from tenant space to outside stairs needs to be removed. Fire extinguisher needs inspected/serviced and tagged accordingly. Emergency egress ligh that is located in the corridor of the tenant space needs to be serviced, emergrncy light was in-operable at time of inspection.
Plan assigned to (CJW)10/23/201710/23/201710/30/2017 PASS
DetailsCarl Westfall
(Oct 25 - 3 days) Occupancy
PLANS/APPL TAKEN TO FRONT DESK  10/30/2017 DONE
Telephone call  10/30/2017 DONE
Called the applicant to explain that in addition to a new guard and handrails, the stairway needs to be rebuilt. Rise and run need not comply with current provisions but treads and risers must be uniform from the bottom landing to the top landing.
Permit Ready to Issue  10/30/2017 DONE
Print Occupancy Form  10/30/2017 DONE
Telephone call  10/30/2017 DONE
Spoke with Candice informing her that this permit is ready and which ever tech she sees will go over the required inspections
Issue PAID IN FULL permit  10/30/2017 DONE
Routing - PLAN CHECK10/23/2017 10/28/2017 PASS
DetailsCarl Westfall
1st review completed  10/28/2017 DONE
Plans ACCEPTED BY PLAN TECH  10/23/2017 DONE
Intake Approval  10/23/2017 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  10/23/2017 DONE
Routing - Addressing10/23/2017 10/23/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/23/2017 10/23/2017 PASS
DetailsRachael Beierle
NO NEW PLUMBING PERMITTED.
Application received 10/23/2017