Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-03830
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 10539 W OVERLAND RD
Project NameTrade Viet Market
Customer Number 
ePlanReviewYes
Description
(TRADE VIET MARKET) //Plan modification to front entry vestibule to remain the same no work or changes to the vestibule area and engineering letter attached for the support of the new mechanical unit. 5-2-2018 JG. // Permit is to remodel an existing 22,683 sq. ft. retail space in an existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select interior storefront glazing, removal of select plumbing fixtures, removal of select acoustic ceiling, removal of select roof assembly for new mechanical rooftop curbs, construction of interior non-bearing walls to create a kitchen and prep areas, select ne door/door frames, select new acoustic ceiling, relocate light fixtures, millwork, (2) walk-in coolers, (2) type 1 hoods, (1) rooftop MAU, rooftop exhaust fans, concrete slab work for new underground plumbing, electrical work. Plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/17/2018 DONE
First Notice 5/17/20186/11/2018 DONE
mailed 6-12
Permanent Occupancy  5/7/2018 DONE
BLD-Final5/3/20185/4/20185/4/2018APASS
DetailsMike Jordan
Jade Phone #: ###-####. All issues have been resolved. ok for perm occ.
CHANGE STATUS TO (ISS)  5/3/2018 DONE
Print Occupancy Form  5/3/2018 DONE
OVERRIDE  5/2/2018  
Plan assigned to (JG)4/26/20184/26/20185/2/2018 PASS
DetailsJavier Guzman
Plan Mod Trade Viet Market
Routing - PLAN CHECK5/1/2018 5/2/2018 PASS
DetailsJavier Guzman
Telephone call  5/2/2018 DONE
emailed tandrews@wbtbc.com that the temp c of o expired and that they need to ask for extension if not ready to final permit out
Permit Ready to Issue  5/2/2018 DONE
PLAN MOD
Telephone call  4/26/2018 DONE
emailed tandrews@wbtbc.com that the temp C of O will expire on the 30th of April . Asked him to request an extension if he's not ready for the final
Plan Modification Accepted  4/26/2018 DONE
DetailsChristina Prado
modifications to existing front entry, new calculations
BLD-Aging Inspection4/2/20184/2/20184/2/2018 PEND
DetailsMike Jordan
Spoke with Jade from Wright Brothers, Informed him that temp occ. expires at the end of this month (April). Jade noted that architect is waiting to get compensated prior to completing the plan mod.
BLD-Final1/29/20181/30/20181/30/2018PPART
DetailsMike Jordan
Jade Phone #: ###-####. Ok for temp occ. Waiting for approval of resubmittal for front entry and letter from engineer for new MAU.
FIRE-Final Inspection1/29/20181/30/20181/30/2018APASS
DetailsTroy Cobbley
life safety passed


Jade Phone #: ###-####
Temporary Occupancy1/30/20184/30/20181/30/2018 DONE
DetailsCandy A. Nichols
BLD-Final1/26/20181/29/20181/29/2018PCANC
DetailsMike Jordan
Jade Phone #: ###-####. Cancelled by contractor via phone call.
FIRE-Final Inspection1/26/20181/29/20181/29/2018AFAIL
DetailsTroy Cobbley
Repair the emergency lights as discussed, provide corrected hardware at the west/front exterior exit door or get plan review approval for the two doors with keyed lock/deadbolts

Jade Phone #: ###-####
BLD-Final1/25/20181/26/20181/26/2018PNR
DetailsMike Jordan
Jade Phone #: ###-####. Needs electrical, mech and fire finals first. Also noted that an RTU was not added that may be needed for make up air, two vent fans in bathroom also were deleted. Store front work also not done. Archtiect to submit plan mod for work not completed.
BLD-Framing/Rough-in1/26/20181/26/20181/26/2018PPASS
DetailsMike Jordan
Jade Phone #: ###-####. Framing already covered. HAd contractor remove ceiling tile to inspect above grid. All walls were supported to structure as shown on plans walls were steel stud as per plans. All trades were inspected prior to cover.
FIRE-Final Inspection1/25/20181/26/20181/26/2018ACANC
DetailsTroy Cobbley
Need the project related hood suppression permit and fire alarm permit finaled prior to a life safety inspection. I was willing to perform a conference for the life safety but due to time constraints and prior obligations was unable to.

Jade Phone #: ###-####
BLD-Final1/25/20181/25/20181/25/2018PCANC
DetailsMike Jordan
Jade Phone #: ###-####. Final scheduled for wrong day. Aslo noted that no framing framing or grid inspections have been scheduled or done. No insspections were ever conducted on this permit.
FIRE-Final Inspection1/25/20181/25/20181/25/2018PCANC
DetailsJim Page
Inspection request scheduled for the wrong date, request date is for 26JAN2018 to cooincide with fire sprinkler inspections. Per conversation with Jade Phone #: ###-####, this request is cancelled.
Issue PAID IN FULL permit  12/1/2017 DONE
Print Occupancy Form  12/1/2017 DONE
Plan assigned to (JG)11/7/201711/7/201711/29/2017 PASS
DetailsJavier Guzman
1st rev comp, 11/20 L2 Trade Viet Market ePlan (MH email)
Routing - PLAN CHECK11/25/2017 11/29/2017 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/29/2017 DONE
Permit Ready to Issue  11/29/2017 DONE
MET
NEED
GC FORM
REVISED CERT
Route to Impact Fee Review11/22/201711/25/201711/24/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  11/22/2017 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK11/7/2017 11/22/2017 FAIL
DetailsJavier Guzman
Routing - MECHANICAL11/7/2017 11/15/2017 PASS
DetailsTroy James
Routing - PLUMBING11/7/2017 11/15/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - FIRE11/7/201711/7/201711/13/2017 PASS
DetailsScott Arellano
Attached review comments to case
Routing PW Environmental11/8/2017 11/9/2017 PASS
DetailsRick Christenson
Routing - Addressing11/7/2017 11/8/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS11/7/2017 11/8/2017 PASS
DetailsMorgan Webb
NO NEW FEES.
Intake Approval  11/7/2017 PASS
DetailsJavier Guzman
Intake Approval  11/2/2017 FAIL
DetailsMichael Hanson
Jeff,
This application has failed prescreen due to the following:
1. Missing wall section(s) - only descriptions provided
2. Missing wall bracing detail (how are the new walls installed and secured)
3. Missing door schedule
4. Missing door hardware schedule
5. New roof top mechanical units require structural roof analysis and structural engineer stamped signed plans.
Thank You,
Michael Hanson
Boise City
###-####
Intake Approval  10/31/2017 FAIL
DetailsMichael Hanson
Returned to applicant, needs to seperate out racking permit from kitchen renovation. MDH
Application received  10/23/2017 DONE
Application submitted via PDS Online on Oct 23 2017 1:55PM