Third Notice | | 4/20/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
Second Notice | | 3/21/2019 | 4/15/2019 | | DONE |
|
|
|
mailed 4-16-19
|
First Notice | | 3/11/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12
|
Permanent Occupancy | | | 3/1/2019 | | DONE |
|
|
|
|
BLD-Final | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Jim Sly
|
|
|
Clive Phone #: ###-#### OK for Perm Occ.
|
Print Occupancy Form | | | 1/23/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. Panic hardware has been provided on the south east door and the southwest door hardware has been removed.
|
BLD-Final | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | CANC |
Jim Sly
|
|
|
|
BLD-Final | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PART |
Jim Sly
|
|
|
Carson Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Elevator to mezzanine installed, .......CDHD, and Fire signs off Perm. Zoning and Public Works N/A.
|
FIRE-Final Inspection | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PART |
Troy Cobbley
|
|
|
The temporary has been extended to the 30th of this month so that the panic hardware can get installed and the other hardware removed.
Carson Phone #: ###-####
|
BLD-Final | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PART |
Jim Sly
|
|
|
OK for Temp Occ. OK for Perm Occ. when..........Fire, CDHD and Zoning signs off Perm Occ. Public Works N/A
|
FIRE-Final Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PART |
Troy Cobbley
|
|
|
A temporary until Monday is ok so that panic hardware can be installed on the front/east side doors. Hardware to be removed from the front/west side doors. Building inspector and I discussed this as well as plan review (Carl). All other life safety items, fire sprinkler and fire alarm are passed.
Carson Phone #: ###-####
|
Zoning Approval | 11/16/2018 | 11/16/2018 | 11/16/2018 | | DONE |
Colleen T Carroll
|
|
|
no zoning inspection needed
|
FIRE-Final Inspection | 11/2/2018 | 11/5/2018 | 11/5/2018 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for final. Todays final was for approval for cover of the platform. It appears to have been completely filled with insulation and is ok for cover.
Clive Phone #: ###-####
|
FIRE-Final Inspection | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for final yet. The project related fire alarm and fire sprinkler permits need addressed and the non-combustible insulation filling the raised platform needs to be completed and inspected.
Clive Phone #: ###-####
|
BLD-Framing/Rough-in | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
Jim Sly
|
|
|
Clive Phone #: ###-#### Platforms Ramp, Stairs.
|
FIRE-Conference | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | DONE |
Troy Cobbley
|
|
|
We discussed the placement of the emergency lights.
Junior Phone #: ###-####
|
BLD-Framing/Rough-in | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Jim Sly
|
|
|
Clive Phone #: ###-####
|
BLD-Framing/Rough-in | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Jim Sly
|
|
|
Clive---around 10 am or after would be best Phone #: ###-####
|
BLD-Conference | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | DONE |
Troy Cobbley
|
|
|
We went over sprinkler protection under the raised platforms (I deferred them to a sprinkler contractor for guidance and showed NFPA 13 code references), We went over fire alarm requirements which appear to require full notification due to an A3 occupancy with two A3 occupant loads of 321 and 81. We also discussed having the plans match the actual field conditions ( doors are shown on the plans that they want to delete). Also there is an ageing permit for sprinkler work that has never been inspected for this space that will need to be finaled prior to a final for this tenant.
Clive- need a conference on fire issues Phone #: ###-####
|
Print Occupancy Form | | | 4/19/2018 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final. Todays inspection was a conference with the electrician about the placement of exit signs and emergency lights. There were no approved plans on site so there was not much I could do. I met with one of the owners and let him know that I would not be signing off untill the aging permit FIR12-004
74 was finaled.
Dale Campbell Jr. Phone #: ###-####
|
BLD-Footing | 3/2/2018 | 3/5/2018 | 3/5/2018 | A | PASS |
Jim Sly
|
|
|
interior footings - Clive Phone #: ###-####
|
BLD-Footing | 3/1/2018 | 3/2/2018 | 3/2/2018 | P | PASS |
Jim Sly
|
|
|
Cliv or JR Phone #: ###-####
|
Fees Due Hold | 3/2/2018 | | 3/2/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/2/2018 | | DONE |
|
|
|
called Clive to tel know no inspection can be done until payment has been taken care of. Jim Sly will wait for a few mintues to see if they pay, then he'll do inspection otherwise Clive will need to reschedule
|
Issue PAID IN FULL permit | | | 2/23/2018 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 2/23/2018 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JAR) | 11/17/2017 | 11/17/2017 | 1/18/2018 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 2nd Rec'd 01/16 - L3 Fly High Trampoline Park
|
Routing - PLAN CHECK | 1/16/2018 | | 1/18/2018 | | PASS |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 1/16/2018 | | 1/18/2018 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/18/2018 | | DONE |
|
|
|
send permit to Clive at clive@standerconstruction.com
NEED
GC FORM-met
REVISED CERT-met
|
Route to Impact Fee Review | 12/29/2017 | 1/1/2018 | 1/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing Off Site - STRUCTURAL | 11/17/2017 | | 12/29/2017 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview
|
1st review completed | | | 12/29/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 11/17/2017 | | 12/29/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing Off Site - C.D.H | 11/17/2017 | | 12/13/2017 | | PASS |
Julie Romig
|
|
|
Passed per ePlanReview
|
Routing - FIRE | 11/17/2017 | 11/17/2017 | 11/24/2017 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - MECHANICAL | 11/17/2017 | | 11/21/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Erosion and Sediment | 11/17/2017 | | 11/21/2017 | | PASS |
Michael Zawacki
|
|
|
No ESCP needed.
|
Intake Approval | | | 11/17/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Javier accepted pre screen
|
Routing - PLUMBING | 11/17/2017 | | 11/17/2017 | | PASS |
Bill VanDegrift
|
|
|
Passed per ePlanReview
|
Routing - Addressing | 11/17/2017 | | 11/17/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/17/2017 | | 11/17/2017 | | PASS |
Morgan Webb
|
|
|
WEST BOISE SEWER DISTRICT
|
Intake Approval | | | 10/26/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Please complete the checklist as page #2 checklist is not complete unless all information is filled out, all appropriate boxes are checked.
• A completed Form #304 – Registered Design Professional form
• A completed Food Establishment License application and Food Establishment Plan Review where food is prepared, manufactured or stored form can be found at https://www.cdhd.idaho.gov/eh-food-forms.php
• A completed Approval form for any building where food is prepared, manufactured or stored at https://www.cdhd.idaho.gov/eh-food-forms.php
• Provide a Site specific fire flow at hydrants letter from Suez Water or other public water provider. Include static pressure if sprinklers are to be installed.
• All plan sheets that have the architects stamp are required to be signed the Idaho licensed architect (currently the architects stamp is on plans but not physically signed)
• All plan sheets that have the Utah engineers stamp are required to be stamped/signed by an Idaho licensed Engineer
• A Vicinity Map showing location of the property with street names identified
• A Key Plan showing the tenant space location within the existing building
• Provide and show the existing Fire sprinkler riser room locations
• Please provide and show exit sign and emergency lighting locations on all the main floor areas sheet EL101
• Please provide and show Portable fire extinguisher locations (no Portable fire extinguisher are shown on plan sheet G002 as stated in checklist)
• Please provide a completed form #310 found at our website at https://pds.cityofboise.org/home/documents/apps/300/ for the identified special inspection items on plan sheet S002
• Please provide all mechanical plans stamped/signed/dated by an Idaho licensed engineer
• Please provide an equipment schedule plan sheet Q102 stamped/signed/dated by an Idaho licensed mechanical engineer
• Please provide all plumbing plans stamped/signed/dated by an Idaho licensed engineer
• I am confused as to the uploaded plan sheet P401, PD401 as it is a mechanical plan, the restrooms shown does not match the floor plan and sheet is not stamped/signed/dated by an Idaho licensed plumbing engineer
|
Application received | | | 10/23/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 23 2017 3:01PM
|