Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-03838
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5693 E HOOTOWL DR
Project NameCottonwood Modern Prarie HN521
Customer Number 
ePlanReviewYes
Description
HILLSIDE, WUI ZONE "A", CLASS "A" ROOF REQUIRED. Permit for the construction of a new 3,112 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 531 sq. ft. of covered patio/porch and a 824 sq. ft. attached garage per the approved plans and any notations. SP-013 zoning and setbacks per planning. ***BJM***


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/14/20186/14/20186/14/2018APASS
DetailsBrandon Shaw
DOC - Permit Finaled6/14/20186/14/20186/14/2018PPASS
DetailsBrandon Shaw
BLD-Final6/11/20186/11/20186/12/2018PNR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Weston Wagner
PubWorks Occupancy Approval6/8/20186/8/20186/8/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Framing/Rough-in5/2/20185/2/20185/2/2018PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other3/15/20183/16/20183/16/2018APASS
DetailsBrandon Shaw
SOFFIT // Rolo Phone #: ###-####
BLD-Conference3/7/20183/7/20183/7/2018APASS
DetailsBrandon Shaw
Energy code- pass
BLD-Energy code compliance3/6/20183/7/20183/7/2018ACANC
DetailsBrandon Shaw
Rolo Phone #: ###-####
BLD-Framing/Rough-in3/2/20183/5/20183/5/2018APASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Wall Bracing2/16/20182/20/20182/20/2018ACANC
DetailsBrandon Shaw
Rolo Phone #: ###-####
BLD-Framing/Rough-in2/16/20182/20/20182/20/2018ACANC
DetailsBrandon Shaw
Rolo Phone #: ###-####
BLD-Wall Bracing2/14/20182/14/20182/14/2018PPASS
DetailsJim Storey
Rollo Phone #: ###-####
BLD-Footing1/4/20181/4/20181/4/2018PPASS
DetailsBrandon Shaw
Work in progress

Frost protection required
BLD-Footing12/28/201712/29/201712/29/2017APASS
DetailsBrandon Shaw
Work in progress

Frost protection required
PubWorks Subgrade Approval12/29/201712/29/201712/29/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  11/17/2017 DONE
Inspection Record Card- Bld  11/17/2017 DONE
OVERRIDE  11/16/2017  
Plan assigned to (BJM)10/24/201710/24/201711/16/2017 DONE
DetailsBrian McGowan
1st review complete - FAIL- 11/10 sfd L2 ePlan
Routing - PLAN CHECK10/24/2017 11/16/2017 FAIL
DetailsBrian McGowan
1st review completed  11/16/2017 FAIL
DetailsBrian McGowan
Missing pony walls in Foundation, Wall bracing
Routing - PLAN CHECK11/16/2017 11/16/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  11/16/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  11/16/2017 DONE
Routing - MECHANICAL10/24/2017 10/31/2017 PASS
DetailsTroy James
Routing PW Grading-Hillside10/24/2017 10/30/2017 PASS
DetailsMelissa Jannusch



A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.


Routing - Erosion and Sediment10/24/2017 10/26/2017 PASS
DetailsMichael Zawacki
Route to Impact Fee Review10/24/201710/27/201710/25/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE10/24/201710/24/201710/25/2017 PASS
Details
Plans were reviewed for FD access, availability of hydrants and defensible space.
Plans ACCEPTED BY PLAN TECH  10/24/2017 DONE
Recd Pcfee & Taken To Pln CK  10/24/2017 DONE
Intake Approval  10/24/2017 PASS
Routing - PLANNING10/24/2017 10/24/2017 PASS
DetailsSue Cummings
Routing - Addressing10/24/2017 10/24/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/24/2017 10/24/2017 PASS
DetailsMorgan Webb
Application received  10/23/2017 DONE
Application submitted via PDS Online on Oct 23 2017 4:26PM