BLD-Final | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PASS |
Dave Hannah
|
|
|
Genn Phone #: ###-####
|
DOC - Permit Finaled | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 4/4/2018 | 4/5/2018 | 4/5/2018 | A | FAIL |
Jim Storey
|
|
|
Qwen- Phone #: ###-#### R312.1.1 Where required. Guards shall be located along open-sided walking surfaces, including stairs, ramps and landings, that are located more than 30 inches (762 mm) measured vertically to the floor or grade below at any point within 36 inches (914 mm) horizontally to the edge of the open side. Insect screening shall not be considered as a guard.
|
BLD-Other | 4/2/2018 | 4/2/2018 | 4/2/2018 | P | PASS |
Jim Storey
|
|
|
Quinn-block and tie-please call if you have questions Phone #: ###-####
|
BLD-Final | 3/29/2018 | 3/30/2018 | 3/30/2018 | P | FAIL |
Brandon Shaw
|
|
|
No block and tie No landing, stairs, hand or guard rails
|
Issue PAID IN FULL permit | | | 11/21/2017 | | DONE |
|
|
|
|
Routing PW Flood Plain | 10/31/2017 | | 11/6/2017 | | PASS |
Jason C. Taylor
|
|
|
No EC required. Houses are well above BFE and no substantial improvements, tie down schedule recived and approved. Jason Taylor ###-####.
|
Telephone call | | | 11/6/2017 | | DONE |
Christina Prado
|
|
|
Called Daniel to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 11/6/2017 | | DONE |
Christina Prado
|
|
|
All met
|
Route to Impact Fee Review | 10/24/2017 | 10/27/2017 | 10/26/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Flood Plain | 10/24/2017 | | 10/24/2017 | | FAIL |
Jason C. Taylor
|
|
|
Need documentation for anchorage and elevation to 2' above grade as per floodplain ordinance. JCT
|
Telephone call | | | 10/24/2017 | | DONE |
|
|
|
Called Daniel Kangas to let know PW failed due to the flood plain-he will call the park owner and let them know
|
Application received | | 10/24/2017 | | | |
|
|
|
|