Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD17-03849
StatusFinaled
Name HALE DEVELOPMENT
Site Address 1603 W IDAHO ST
Project Name 
Customer NumberBLD17-03855 FOUNDATION
ePlanReviewNo
Description
(IDAHO STREET TOWNHOMES) **UNIT D** Special inspections are required. Permit for the construction of a new 3,049 sq. ft., 3 story (first story 1,140 sq. ft., second story 1,583 sq. ft., 326 sq. ft.) Townhouse with 3 bedrooms, 4.5 bathrooms, approximately 248 sq. ft. of covered patio/porch and a 584 sq. ft. attached garage per the approved plans and any notations. R-ODD zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/22/20188/23/20188/23/2018PPASS
DetailsTony Young
David Phone #: ###-####
DOC - Permit Finaled8/23/20188/23/20188/23/2018PPASS
DetailsTony Young
BLD-Energy code compliance5/8/20185/9/20185/9/2018APASS
DetailsTony Young
David Phone #: ###-####
BLD-Framing/Rough-in5/8/20185/8/20185/8/2018PPASS
DetailsTony Young
David Phone #: ###-####
BLD-Framing/Rough-in5/7/20185/7/20185/7/2018PPASS
DetailsTony Young
David Phone #: ###-####
BLD-Conference4/26/20184/26/20184/26/2018PPASS
DetailsTony Young
David Phone #: ###-####,, wanting a framing walk through prior to the framer leaving
BLD-Conference4/25/20184/26/20184/26/2018APASS
DetailsTony Young
David Phone #: ###-####,, wanting a framing walk through prior to the framer leaving
BLD-Framing/Rough-in4/25/20184/25/20184/26/2018PNR
DetailsTony Young
David Phone #: ###-####
Plan Modification Accepted  4/24/2018 DONE
new manual j report
Routing - MECHANICAL4/24/2018 4/24/2018 PASS
DetailsTroy James
resubmitted manual j report
Issue PAID IN FULL permit  1/5/2018 DONE
Plan assigned to (BJM) 10/24/201712/12/2017 DONE
DetailsBrian McGowan
1st review done - need additional engineering 11/10 Townhome L2 paper
Routing - PLAN CHECK12/12/2017 12/12/2017 PASS
DetailsBrian McGowan
Case Summary (BLD)  12/12/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  12/12/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  12/12/2017 DONE
Met-
ESC on parcel (ESC 17-01464)
Inspection Record Card- Bld  12/12/2017 DONE
Telephone call  12/12/2017 DONE
Left a message for David informing him that the six townhome permits are ready and the fee amount due for each
Plan resubmittals received  12/5/2017 DONE
Two copies each of structural edge engineering,S000,S001,S002,S002,S004,S100,S101,S102,S200,S201,S202,S203,S204,S300,S400, and S401. Two copies of each S000-S401 in 8x11. Taken to BJM
1st review completed  11/20/2017 FAIL
DetailsBrian McGowan
Engineering for metal overhang
Routing - PLAN CHECK11/2/2017 11/20/2017 FAIL
DetailsBrian McGowan
Engineering for metal overhang
Routing - PLANNING11/2/2017 11/3/2017 PASS
DetailsTodd Tucker
Plan resubmittals received  11/3/2017 DONE
Received two sets of revised foundation calcs, stamped and taken to BGM for review
Routing - MECHANICAL  11/2/2017 PASS
DetailsTroy James
Routing - Design Review10/30/2017 10/30/2017 PASS
DetailsSarah Schafer
Approved per DRH17-00464.
Route to Impact Fee Review10/24/201710/27/201710/25/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PUBLIC WORKS  10/25/2017 PASS
Plans ACCEPTED BY PLAN TECH  10/24/2017 DONE
DetailsChristina Prado
Intake Approval  10/24/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  10/24/2017 DONE
DetailsChristina Prado
Routing - Addressing10/24/2017 10/24/2017 PASS
DetailsDoug Chausow
Application received 10/24/2017