BLD-Final | 8/22/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Tony Young
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | PASS |
Tony Young
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Tony Young
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Tony Young
|
|
|
David Phone #: ###-####
|
BLD-Conference | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | PASS |
Tony Young
|
|
|
David Phone #: ###-####,, wanting a framing walk through prior to the framer leaving
|
BLD-Conference | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Tony Young
|
|
|
David Phone #: ###-####,, wanting a framing walk through prior to the framer leaving
|
BLD-Framing/Rough-in | 4/25/2018 | 4/25/2018 | 4/26/2018 | P | NR |
Tony Young
|
|
|
David Phone #: ###-####
|
Plan Modification Accepted | | | 4/24/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 4/24/2018 | | 4/24/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
Issue PAID IN FULL permit | | | 1/5/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | | 10/24/2017 | 12/12/2017 | | DONE |
Brian McGowan
|
|
|
1st review done - need additional engineering 11/10 Townhome L2 paper
|
Routing - PLAN CHECK | 12/12/2017 | | 12/12/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 12/12/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/12/2017 | | DONE |
|
|
|
Met-
ESC on parcel (ESC 17-01464)
|
Inspection Record Card- Bld | | | 12/12/2017 | | DONE |
|
|
|
|
Telephone call | | | 12/12/2017 | | DONE |
|
|
|
Left a message for David informing him that the six townhome permits are ready and the fee amount due for each
|
Plan resubmittals received | | | 12/5/2017 | | DONE |
|
|
|
Two copies each of structural edge engineering,S000,S001,S002,S002,S004,S100,S101,S102,S200,S201,S202,S203,S204,S300,S400, and S401. Two copies of each S000-S401 in 8x11. Taken to BJM
|
1st review completed | | | 11/20/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering for metal overhang
|
Routing - PLAN CHECK | 11/2/2017 | | 11/20/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering for metal overhang
|
Routing - PLANNING | 11/2/2017 | | 11/3/2017 | | PASS |
Todd Tucker
|
|
|
|
Plan resubmittals received | | | 11/3/2017 | | DONE |
|
|
|
Received two sets of revised foundation calcs, stamped and taken to BGM for review
|
Routing - MECHANICAL | | | 11/2/2017 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 10/30/2017 | | 10/30/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH17-00464.
|
Route to Impact Fee Review | 10/24/2017 | 10/27/2017 | 10/25/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | | | 10/25/2017 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/24/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 10/24/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/24/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 10/24/2017 | | 10/24/2017 | | PASS |
Doug Chausow
|
|
|
|
Application received | | 10/24/2017 | | | |
|
|
|
|