Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD17-03863
StatusFinaled
Name ARMADA HOMES
Site Address 1317 N FRAZIER AVE
Project NameHollowrose 10-1
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2125 sq. ft., two story (first story 1212 sq. ft., second story 913 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 30 sq. ft. of covered patio/porch and a 628 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/11/20184/12/20184/12/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Kelly Stover
DOC - Permit Finaled4/12/20184/12/20184/12/2018PPASS
DetailsMike Jordan
BLD-Energy code compliance2/21/20182/21/20182/21/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD-Framing/Rough-in2/21/20182/21/20182/21/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Kelly Stover. Truss repaired per provided truss engineering.
BLD-Energy code compliance2/16/20182/20/20182/20/2018ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD-Framing/Rough-in2/16/20182/20/20182/20/2018AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Kelly Stover. Truss repair not yet completed.
BLD-Framing/Rough-in2/16/20182/16/20182/16/2018PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Kelly Stover ok to insulate but truss a01 is spun 180 deg need engineering tosee if it will work as is
BLD-Framing/Rough-in2/15/20182/15/20182/15/2018ANR
DetailsMike Jordan
Mech. rough inn inspection failed.
BLD-Wall Bracing1/16/20181/17/20181/17/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kelly Stover
Plan Modification Accepted  12/20/2017 DONE
new manual j report
Routing - MECHANICAL12/20/2017 12/20/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Foundation12/14/201712/15/201712/15/2017PPART
DetailsMike Jordan
Matt Phone #: ###-####
BLD-Footing12/12/201712/13/201712/13/2017PPASS
DetailsMike Jordan
Matt Phone #: ###-####
Issue PAID IN FULL permit  12/5/2017 DONE
OVERRIDE  11/30/2017  
Telephone call  11/30/2017 DONE
Left a message for Kelly informing him that this permit is ready, the fee amount due for issuance and that they would beed to contact West Boise for Sewer
Case Summary (BLD)  11/30/2017 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  11/30/2017 DONE
DetailsMichael Hanson
Inspection Record Card- Bld  11/30/2017 DONE
Permit Ready to Issue  11/30/2017 DONE
met-no SWR fees-this home is in West Boise
Plan assigned to (M_H)11/17/2017 11/30/2017 DONE
DetailsMichael Hanson
11/07 sfd L1 paper - 1st review complete. RTA - structural deficiences. MDH
Routing - PLAN CHECK11/29/2017 11/30/2017 PASS
DetailsJosh Bogle
Plan resubmittals received  11/29/2017 DONE
Two copies of sheet A5. Taken to Michael
Routing - PLAN CHECK11/29/2017 11/29/2017 FAIL
DetailsJosh Bogle
Resubmittal answered 2 of 3 structural deficiences. MDH
Plan resubmittals received  11/27/2017 DONE
Two copies of sheets A0, A1 and A3 taken to Mike
Plan Reviewer's activity  11/20/2017 DONE
1st review completed  11/20/2017 DONE
DetailsMichael Hanson
Routing - PLAN CHECK10/31/2017 11/20/2017 FAIL
DetailsBrian McGowan
Structural deficiences. MDH
Plan assigned to (BJM) 10/25/201711/17/2017 DEFR
DetailsBrian McGowan
11/7 sfd L1 paper
Routing - MECHANICAL10/26/2017 10/31/2017 PASS
DetailsTroy James
Route to Impact Fee Review10/25/201710/28/201710/26/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING10/26/2017 10/26/2017 PASS
DetailsBrent Moore
Routing - PUBLIC WORKS  10/26/2017 PASS
CONTACT WEST BOISE SEWER DISTRICT
Routing - Addressing10/25/2017 10/25/2017 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  10/25/2017 DONE
DetailsChristina Prado
Intake Approval  10/25/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  10/25/2017 DONE
DetailsChristina Prado
Application received  10/24/2017 DONE
Application submitted via PDS Online on Oct 24 2017 11:02AM