Permit Information
Permit NumberBLD17-03872
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 6707 S EISENMAN RD
Project NameGowen Indust. Park - Bldg. A
Customer Number 
ePlanReviewYes
Description
(GOWEN INDUSTRIAL PARK – WAREHOUSE BUILDING A – NEW BUILDING) (DRH17-00215) (GRD17-00058) (8-22-18 PLAN MODIFICATION TO OMIT THE PREVIOUSLY PROPOSED 2 OFFICES WITH MEZZANINE DECK ABOVE (INCLUDING BEARING WALLS AND SHEAR WALLS) AND THEIR ASSOCIATED TOILET ROOMS (4 TOTAL) AND WATER HEATERS. DRINKING FOUNTAINS AND SERVICE SINKS ARE ALSO BEING OMITTED. SPANDREL BRACES WILL BE ADDED TO PROVIDE RESISTANCE TO OUT-OF-PLANE LATERAL LOADS AS PROVIDED IN OTHER LOCATIONS. IN ADDITION, THERE ARE CHANGES TO LIGHTING, ELECTRICAL POWER, AND MECHANICAL SYSTEMS. SEPARATE PERMITS ARE REQUIRED TO ESTABLISH OCCUPANCY FOR EACH TENANT SPACE. PLUMBING FIXTURES WILL BE REQUIRED AT THAT TIME.) (4-4-18 PLAN MODIFICATION TO DELETE THE 1-HR FIRE RATED CEILING HATCH LOCATED WITHIN THE FIRE RISER ROOM. THE CEILING HATCH WAS TO BE INSTALLED BELOW THE ROOF HATCH WHICH GIVES ACCESS TO ROOF TOP HVAC EQUIPMENT. THE FIRE RISER ROOM IS REQUIRED TO BE SEPARATED FROM THE REST OF THE BUILDING BY A MINIMUM 1-HR FIRE-RESISTANCE-RATED OCCUPANCY SEPARATION. SINCE A TILT-UP CONCRETE WALL PANEL SEPARATES THE FIRE RISER ROOM FROM THE REST OF THE BUILDING, THE ROOF DOES NOT PROVIDE THE REQUIRED SEPARATION. A FIRE RATED CEILING HATCH IS NOT REQUIRED.) The fire sprinkler system is used for building area increase and for fire area. To construct a 51,408 square foot building to be used for office, storage, and perhaps fabrication. A total of five (5) tenant spaces separated by potentially 1-hr interior walls with block-out framing for potential future openings will be created. This permit is not intended to establish a Certificate of Occupancy for any tenant or for any portion of this building. Each tenant is required to apply for their own Certificate of Occupancy. Separate permits for racking over 8 feet tall are also required. Work is to include reinforced concrete footings, reinforced concrete tilt-up panels, reinforced concrete slab on grade, recessed concrete floors with dock levelers at some overhead doors, cantilevered canopies, steel columns, open web steel roof girders, open web steel roof joists, steel roof deck, continuous insulation installed on top of the roof deck, a membrane roof covering, skylights, metal screens for roof top mechanical units, roll-up exterior doors, side-hinged swinging exterior doors, steel exterior landings and stairways at the West exit doors, storefront windows, trash enclosures, unoccupied mezzanine above the office area supported by bearing walls, interior nonbearing walls, four toilet rooms accessible to the disabled, and finishes. Special Inspection is required for soil (excavation and compacted fill), concrete footings (including reinforcing steel), concrete tilt-up panels (including reinforcing steel), anchors post-installed in hardened concrete, and steel (including welding). The work is required to comply with the approved drawings, with the Geotechnical Engineer’s recommendations, with the Structural Calculations, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice10/30/201810/30/201811/7/2018 DONE
DetailsJim Storey
mailed 11-12
BLD-Final10/30/201810/30/201810/30/2018APASS
DetailsJim Storey
DOC - Permit Finaled10/30/201810/30/201810/30/2018PPASS
DetailsJim Storey
BLD-Final10/25/201810/26/201810/26/2018PPART
DetailsJim Storey
Tim Phone #: ###-#### achd sign off/ letter aprovals engineer and si co.
PubWorks Occupancy Approval10/24/201810/24/201810/24/2018 DONE
DetailsTiffany Lowery
FIRE-Final Inspection10/8/201810/9/201810/9/2018APASS
DetailsJim Page
Bags have been removed from fire hydrants, final life fire safety inspection complete.

Tim Phone #: ###-####
FIRE-Final Inspection9/28/201810/1/201810/1/2018AFAIL
DetailsJim Page
Fire hydrants are bagged over by SUEZ due to payment issue, issue needs to be resolved before life fire safety inspection can be passed.

Tim Phone #: ###-####
Zoning Approval9/26/20189/26/20189/26/2018 PASS
DetailsKatelyn Menuge
CHANGE STATUS TO (ISS)  8/27/2018 DONE
Inspection Record Card- Bld  8/27/2018 DONE
OVERRIDE  8/22/2018  
Plan assigned to (CJW)8/17/20188/17/20188/22/2018 PASS
DetailsCarl Westfall
Plan Mod - Gowen Industrial Park - Warehouse Building A (plan intake approved and routed)
Routing PW Sewer Rating8/21/2018 8/22/2018 PASS
DetailsRachael Beierle
ALL FIXTURES REMOVED. CREDITS AVAILABLE.
PLANS/APPL TAKEN TO FRONT DESK  8/22/2018 DONE
Permit Ready to Issue  8/22/2018 DONE
PLAN MOD
Routing - PLAN CHECK8/20/2018 8/21/2018 PASS
DetailsCarl Westfall
Drawings uploaded by applicant. 2nd plan mod plan intake approved.
Routing - PLAN CHECK8/21/2018 8/21/2018 PASS
DetailsCarl Westfall
2nd plan mod review approved
Plan Modification Accepted  8/17/2018 DONE
BLD-Framing/Rough-in7/11/20187/12/20187/12/2018PPART
DetailsJim Storey
John Phone #: ###-####-only walls demising and fire riser room well as joists
CHANGE STATUS TO (ISS)  7/5/2018 DONE
Inspection Record Card- Bld  7/5/2018 DONE
OVERRIDE  4/4/2018  
Plan assigned to (CJW)3/27/20183/27/20184/4/2018 PASS
DetailsCarl Westfall
x Gowan Industrial Park Plan Mod
Routing - PLAN CHECK3/27/2018 4/4/2018 PASS
DetailsCarl Westfall
1st plan mod approved
Plan Reviewer's activity  4/4/2018 PASS
1st plan mod approved
Permit Ready to Issue  4/4/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Plan Modification Accepted  3/27/2018 DONE
Remove 1 hour rarted ceiling access hatch
Inspection Record Card- Bld  2/13/2018 DONE
Issue PAID IN FULL permit  2/13/2018 DONE
Telephone call  2/6/2018 DONE
CAN eamiled David Minegar that all project fees must be paid prior to issuance of permit.
OVERRIDE  1/18/2018  
Plan assigned to (CJW)10/30/201710/30/20171/18/2018 PASS
DetailsCarl Westfall
(2nd done) (Dec 1 - 25 days) (92 sheets) Gowan Industrial Park Building A
PLANS/APPL TAKEN TO FRONT DESK  1/18/2018 DONE
Permit Ready to Issue  1/18/2018 DONE
EMAIL DAVID MINEGAR at dminegar@laytonconstruction.com
MET
Need:
GC form
Revised value
Routing PW Street Lights1/17/2018 1/18/2018 PASS
DetailsTom Marshall
Routing - Design Review1/17/2018 1/17/2018 PASS
DetailsKatelyn Menuge
Please remember to resolve your changemark. Delete it if it is on the most current version of a drawing.
Routing - PLAN CHECK1/16/2018 1/17/2018 PASS
DetailsCarl Westfall
Plan resubmittals received  1/16/2018 DONE
Routing - PLAN CHECK1/5/2018 1/9/2018 PASS
DetailsCarl Westfall
Plan resubmittals requested  1/9/2018 DONE
Routing - Design Review1/8/2018 1/8/2018 PASS
DetailsKatelyn Menuge
Routing PW Street Lights1/8/2018 1/8/2018 FAIL
DetailsTom Marshall
Route to Impact Fee Review1/4/20181/7/20181/5/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan resubmittals received  1/5/2018 DONE
Came in late on Friday. Routed early Monday morning.
1st review completed  1/4/2018 DONE
Plan resubmittals requested  1/4/2018 DONE
Routing - PLAN CHECK10/30/2017 1/4/2018 PASS
DetailsCarl Westfall
Routing PW Street Lights10/30/2017 12/19/2017 FAIL
DetailsTom Marshall
Routing - Erosion and Sediment11/20/2017 11/20/2017 PASS
DetailsAndy J. Long
Project scope under ESC17-01200 modified to cover Building A ESC coverage. Do not need to issue new ESC permit (ESC17-01510) with this building permit. Permit modification fee needs to be paid on ESC17-01200.
Routing PW Drainage11/15/2017 11/17/2017 PASS
DetailsJason C. Taylor
Reassigned from Brian Murphy
Routing PW Drainage10/30/2017 11/17/2017 PASS
DetailsBrian Murphy
Drainage project approved under ODI 3663. Jason Taylor ###-####
Routing Off Site - STRUCTURAL10/30/2017 11/10/2017 PASS
DetailsCarl Westfall
Chris Holladay (AHJ)
Routing PW Environmental10/30/2017 11/3/2017 PASS
DetailsRick Christenson
Routing - Erosion and Sediment10/30/2017 11/2/2017 PASS
DetailsMichael Zawacki
Routing - MECHANICAL10/30/2017 11/2/2017 PASS
DetailsTroy James
Routing - PLUMBING10/30/2017 11/1/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - FIRE10/30/201710/30/201710/31/2017 PASS
DetailsScott Arellano
Attached review comments to case
Routing PW Sewer Design10/30/2017 10/31/2017 PASS
DetailsKyle S. Rosenmeyer
Routing PW Solid Waste10/30/2017 10/31/2017 PASS
DetailsEvan Carpenter
Intake Approval  10/30/2017 PASS
Routing - PLANNING10/30/2017 10/30/2017 PASS
DetailsLeon Letson
Routing - Addressing10/30/2017 10/30/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/30/2017 10/30/2017 PASS
DetailsRachael Beierle
Routing - Design Review10/30/2017 10/30/2017 FAIL
DetailsKatelyn Menuge
Corrections required and ROS shall be completed prior to building permit issuance.
Intake Approval  10/26/2017 FAIL
Form 31 needs to be signed by the EOR
Site and landscape plans are required
Application received  10/24/2017 DONE
Application submitted via PDS Online on Oct 24 2017 4:01PM