Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD17-03885
StatusFinaled
Name CM COMPANY
Site Address 355 W JULIA DAVIS DR
Project NameZoo Boise
Customer Number 
ePlanReviewYes
Description
(ZOO BOISE) Zoo Boise-D7 EO Wilson: THERE ARE A TOTAL OF 20 ASSOCIATED PERMITS PLEASE SIGN OFF ON ALL.(BLD17-4409-4413, BLD17-04415-4420, and BLD17-04422-4429) Permit for the construction of a new 7,343 sq. ft. building with work to include a covered viewing area, two accessible restrooms and associated animal exhibits per the approved plans. This buiding is fully fire sprinklered. CDM NOTE:
Two Elevation Certificates will be required; one prior to any vertical construction, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
MISC ACTIONS  10/16/2019 DONE
Recalculated plan check fees for entire project for permits BLD17-03885, 4409, 4410, 4411, 4413, 4415, 4417, 4418, 4419, 4420, 4422, 4423, 4424, 4425, 4426, 4427, 4428, 4429. Overall final plan check fee put on BLD17-03885, see calculation worksheet attached to that permit.
Third Notice 9/23/201910/14/2019 DONE
This permit finaled on the web by Jackie Phelps
Second Notice 8/16/20199/18/2019 DONE
mailed 9-19-19
First Notice 8/1/20198/6/2019 DONE
mailed 8-7-19
PubWorks Occupancy Approval7/12/20197/12/20197/12/2019 DONE
DetailsTiffany Lowery
Print Occupancy Form  7/12/2019 DONE
Permanent Occupancy  7/12/2019 DONE
BLD-Final7/8/20197/8/20197/11/2019PPASS
DetailsDave Hannah
BLD final for Occ EO wilson Phone #: ###-#### Inspection requested via web by Brandon Reynolds
Elevation Cert Rec'd-Final  7/9/2019 DONE
The final Elevation Certificate has been received and is acceptable. Final occupancy may be approved by the building department. Jason Taylor ###-####
BLD-Conference6/25/20196/26/20196/26/2019ACANC
DetailsMike Jordan
Safari Camp Tents Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Final6/20/20196/21/20196/20/2019PCANC
DetailsDave Hannah
Final inspection for Occ. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Final6/20/20196/20/20196/20/2019PCANC
DetailsBrandon Shaw
Final Occ for EO Wilson bulding Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
FIRE-Final Inspection6/20/20196/20/20196/20/2019PPASS
DetailsJim Page
Previously noted items in the 15MAY2019 inspection have been completed, final life fire safety inspection for area of work is complete.

Life safety for Occ. Reviewed today while on site for other buildings Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Final5/13/20195/14/20195/15/2019PPART
DetailsDave Hannah
Temp Occupency for D7 prior to animals moving in. Not open to public yet. Phone #: ###-#### Inspection requested via web by Brandon Reynolds ok to load anaimal
FIRE-Final Inspection5/14/20195/14/20195/14/2019APART
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Permanant manhole cover will be placed over sewer clean-out pit located by FDC, platform to enter fire sprinkler riser room will be extended out to meet the height requirements for the wall mount post indicator valve. 45 day TCO for life fire safety is authorized per conversation with Ron Johnson with Boise Fire. Life fire safety can be finaled after permanent manhole cover is placed and platform is extended, all other life safety items are complete.
FIRE-Conference5/13/20195/13/20195/13/2019PDONE
DetailsJim Page
Wall mounted post indicator is to high above finish grade, maximum allowable elevation above finish floor needs to be 48 inches or less per conversation with Ron Johnson with Boise Fire. Manhole cover will be placed over sewer clean-out pit prior to final occupancy.

FIRE-Final Inspection5/13/20195/13/20195/13/2019PCANC
DetailsJim Page
Request was for a conference, this request is cancelled.

Please coordinate with fire suppression and alarm. building D7 Phone #: ###-#### Inspection requested via web by Brandon Reynolds
FIRE-Final Inspection5/6/20195/7/20195/7/2019PCANC
DetailsTroy Cobbley
Since the project related fire alarm and fire sprinkler permits could not be finaled I did a conference on general life safety requirements. Life safety inspection will need to be rescheduled. This is for fire life safety in building D7 EO wilson Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Framing/Rough-in4/29/20194/29/20194/29/2019PPASS
DetailsDave Hannah
Inspection for framing sometime between 12pm and 4pm please. Phone #: ###-#### Inspection requested via web by Savannah Sanderson
BLD-Wall cover3/13/20193/18/20193/18/2019PPASS
DetailsDave Hannah
Approval to cover ceiling prior to spray foam, had a partial already this is for the remainder Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Wall cover2/28/20192/28/20193/1/2019PPART
DetailsJim Sly
This is a partial approval for cover in the bathrooms and common area of D7. Please check in with Brandon ###-#### Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Framing/Rough-in2/20/20192/21/20192/21/2019APASS
DetailsDave Hannah
Building D7 Partial approval to cover with spray foam. Electrical is approved and Plumbing should be first thing in a.m. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
Elevation Cert Rec'd-Midconst  2/21/2019 DONE
BLD-Framing/Rough-in2/19/20192/19/20192/19/2019PPEND
DetailsDave Hannah
Roddy Phone #: ###-#### needs flood plan certs
BLD-Framing/Rough-in1/22/20191/22/20191/22/2019PPASS
DetailsDave Hannah
Rody Phone #: ###-#### roof framing ok to cover ext side
BLD-Concrete9/5/20189/6/20189/6/2018PPEND
DetailsDave Hannah
Requesting a rebar inspection for Thursday afternoon between 3pm-4pm. There will be a concrete pour on Friday morning. Phone #: ###-#### Inspection requested via web by Justin Palm ok after specal inspection sign off
BLD-Foundation8/31/20189/5/20189/6/2018PPEND
DetailsDave Hannah
Rebar inspection at remaining stem walls D7 EO Wilson building. Phone #: ###-#### Inspection requested via web by Brandon Reynolds ok after spec inspection sign off
BLD-Foundation8/31/20189/4/20188/31/2018PCANC
DetailsDave Hannah
Rebar inspection in remaining walls D7 EO Wilson Building. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Concrete8/27/20188/28/20188/29/2018PPASS
DetailsDave Hannah
We need a rebar inspection in the afternoon on Tuesday, 8/28. Anytime in the afternoon before 4pm. Phone #: ###-#### Inspection requested via web by Justin Palm
BLD-Foundation8/16/20188/17/20188/17/2018APASS
DetailsDave Hannah
rebar inspection for NW half of EO Wilson building Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Footing8/7/20188/8/20188/9/2018PPASS
DetailsDave Hannah
There will be a footing pour the following day, Thursday, at 5am. Inspection can be as late as 3:30pm on Wednesday the 8th. Inspection requested via web by Justin Palm
BLD-Concrete8/7/20188/9/20188/7/2018ACANC
DetailsDave Hannah
Column footing to be poured early morning. Expecting mud at 5am. There is an additional footing pour happening on site, same day/same time, different building and permit number. I will put in for an individual inspection, just know its all on the same job site. Number listed is for Savannah, she will be on site. Phone #: ###-#### >> Inspection requested via web by Justin Palm Inspection cancelled from web by: Justin Palm
CHANGE STATUS TO (ISS)  8/7/2018 DONE
put in rdy staus by mistake
Permit Ready to Issue  7/10/2018 DONE
Telephone call  4/23/2018 DONE
Spoke with Jackie to recommend sending in a request for an extension if not ready to pay and pick up. stated that they should be paid for and picked up today, but will call back if not able to
Issue PAID IN FULL permit  4/23/2018 DONE
Print Occupancy Form  4/23/2018 DONE
DetailsChristina Prado
OVERRIDE  4/20/2018  
Permit Ready to Issue  4/20/2018 DONE
met
Plan assigned to (CDM)12/6/201712/6/20174/19/2018 PASS
DetailsCarl D Madsen
Zoo Boise
Routing - PLAN CHECK3/15/2018 4/19/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL3/15/2018 4/19/2018 PASS
DetailsCarl D Madsen
Routing - PUBLIC WORKS4/19/2018 4/19/2018 PASS
DetailsMike Sheppard
PLANS/APPL TAKEN TO FRONT DESK  4/19/2018 DONE
Routing PW Sewer Design4/17/2018 4/19/2018 PASS
DetailsMike Sheppard
per eplan
Elevation Cert Rec'd-Prelim  4/4/2018 DONE
Routing PW Flood Plain4/4/2018 4/4/2018 PASS
DetailsJason C. Taylor
NOTE:
Two Elevation Certificates will be required; one prior to any vertical construction, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor ###-####.
Routing PW Sewer Design4/3/2018 4/3/2018 FAIL
DetailsMike Sheppard
Routing PW Drainage3/16/2018 3/16/2018 PASS
DetailsBrian Murphy
Routing - PLANNING3/15/2018 3/16/2018 PASS
DetailsDavid Moser
Routing - FIRE2/8/20182/9/20182/9/2018 PASS
DetailsErika Akin
Attached comments to case
Routing Off Site - STRUCTURAL1/20/2018 2/8/2018 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK1/20/2018 2/8/2018 FAIL
DetailsCarl D Madsen
Pending other department approvals
Routing PW Sewer Design1/22/2018 2/8/2018 FAIL
DetailsMike Sheppard
Sewer plans have not been approved
Routing PW Flood Plain1/22/2018 2/2/2018 FAIL
DetailsJason C. Taylor
Elevation Certificate Needed, elevations need to be placed on site plan, foundation plan, and these cross section plans. Jason Taylor ###-####
Routing - PLANNING1/20/2018 1/24/2018 FAIL
DetailsDavid Moser
Need to submit Floodplain Development application
Routing - PUBLIC WORKS1/20/2018 1/22/2018 PASS
DetailsRachael Beierle
ADDED 2 MORE HB'S IN MOD. PERMIT ADJUSTED.
Route to Impact Fee Review1/5/20181/8/20181/10/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  1/5/2018 FAIL
Routing - PLAN CHECK12/6/2017 1/5/2018 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL12/6/2017 1/5/2018 FAIL
DetailsCarl D Madsen
Routing PW Sewer Design12/6/2017 12/22/2017 FAIL
DetailsMike Sheppard
Submit new sewer plans per BFE Requirements
Routing - PLANNING12/6/2017 12/21/2017 FAIL
DetailsDavid Moser
need floodplain review application
Routing PW Flood Plain12/6/2017 12/18/2017 FAIL
DetailsJason C. Taylor
Need project to comply with floodplain ordiance and new BFE from FEMA maps. Please resubmit revised drawings showing how project will comply with ordinance. Jason Taylor ###-####
Routing PW Environmental12/6/2017 12/18/2017 PASS
DetailsRick Christenson
Routing - FIRE12/6/201712/6/201712/15/2017 FAIL
DetailsScott Arellano
Emailed correction items to architect. Attached plan review report to case.
Routing - PUBLIC WORKS12/6/2017 12/13/2017 PASS
DetailsRachael Beierle
Routing PW Drainage12/6/2017 12/12/2017 FAIL
DetailsBrian Murphy
SOIL MIX APDX J AND INFILTRATION RATES
Routing - PLUMBING12/6/2017 12/11/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing12/6/2017 12/6/2017 PASS
DetailsDoug Chausow
Routing - MECHANICAL12/6/2017 12/6/2017 PASS
DetailsTroy James
Routing PW Street Lights12/6/2017 12/6/2017 PASS
DetailsTom Marshall
Routing - Erosion and Sediment12/6/2017 12/6/2017 PASS
DetailsMichael Zawacki
Two SWPPP provided. Job is located in floodplain. CM company will provide RP which is still needed. SWPPP states 2.3 acres of disturbed area.
Routing PW Solid Waste12/6/2017 12/6/2017 PASS
DetailsEvan Carpenter
Assuming there are no changes to solid waste dumpster access at the site
Plans ACCEPTED BY PLAN TECH  12/4/2017 DONE
Intake Approval  12/4/2017 PASS
DetailsCarl D Madsen
Recd Pcfee & Taken To Pln CK  12/4/2017 DONE
plan review intake fees all paid to this permit
Application received  10/25/2017 DONE
Application submitted via PDS Online on Oct 25 2017 4:44PM
Routing PW Drainage1/22/2018 2/1/2017 FAIL
DetailsBrian Murphy
need new swale detail geo,stormwater grade to swales