MISC ACTIONS | | | 10/16/2019 | | DONE |
|
|
|
Recalculated plan check fees for entire project for permits BLD17-03885, 4409, 4410, 4411, 4413, 4415, 4417, 4418, 4419, 4420, 4422, 4423, 4424, 4425, 4426, 4427, 4428, 4429. Overall final plan check fee put on BLD17-03885, see calculation worksheet attached to that permit.
|
Third Notice | | 9/23/2019 | 10/14/2019 | | DONE |
|
|
|
This permit finaled on the web by Jackie Phelps
|
Second Notice | | 8/16/2019 | 9/18/2019 | | DONE |
|
|
|
mailed 9-19-19
|
First Notice | | 8/1/2019 | 8/6/2019 | | DONE |
|
|
|
mailed 8-7-19
|
PubWorks Occupancy Approval | 7/12/2019 | 7/12/2019 | 7/12/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Print Occupancy Form | | | 7/12/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/12/2019 | | DONE |
|
|
|
|
BLD-Final | 7/8/2019 | 7/8/2019 | 7/11/2019 | P | PASS |
Dave Hannah
|
|
|
BLD final for Occ EO wilson Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
Elevation Cert Rec'd-Final | | | 7/9/2019 | | DONE |
|
|
|
The final Elevation Certificate has been received and is acceptable. Final occupancy may be approved by the building department. Jason Taylor ###-####
|
BLD-Conference | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | CANC |
Mike Jordan
|
|
|
Safari Camp Tents Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Final | 6/20/2019 | 6/21/2019 | 6/20/2019 | P | CANC |
Dave Hannah
|
|
|
Final inspection for Occ. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD-Final | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | CANC |
Brandon Shaw
|
|
|
Final Occ for EO Wilson bulding Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
FIRE-Final Inspection | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items in the 15MAY2019 inspection have been completed, final life fire safety inspection for area of work is complete.
Life safety for Occ. Reviewed today while on site for other buildings Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Final | 5/13/2019 | 5/14/2019 | 5/15/2019 | P | PART |
Dave Hannah
|
|
|
Temp Occupency for D7 prior to animals moving in. Not open to public yet. Phone #: ###-#### Inspection requested via web by Brandon Reynolds ok to load anaimal
|
FIRE-Final Inspection | 5/14/2019 | 5/14/2019 | 5/14/2019 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Permanant manhole cover will be placed over sewer clean-out pit located by FDC, platform to enter fire sprinkler riser room will be extended out to meet the height requirements for the wall mount post indicator valve. 45 day TCO for life fire safety is authorized per conversation with Ron Johnson with Boise Fire. Life fire safety can be finaled after permanent manhole cover is placed and platform is extended, all other life safety items are complete.
|
FIRE-Conference | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | DONE |
Jim Page
|
|
|
Wall mounted post indicator is to high above finish grade, maximum allowable elevation above finish floor needs to be 48 inches or less per conversation with Ron Johnson with Boise Fire. Manhole cover will be placed over sewer clean-out pit prior to final occupancy.
|
FIRE-Final Inspection | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | CANC |
Jim Page
|
|
|
Request was for a conference, this request is cancelled.
Please coordinate with fire suppression and alarm. building D7 Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
FIRE-Final Inspection | 5/6/2019 | 5/7/2019 | 5/7/2019 | P | CANC |
Troy Cobbley
|
|
|
Since the project related fire alarm and fire sprinkler permits could not be finaled I did a conference on general life safety requirements. Life safety inspection will need to be rescheduled. This is for fire life safety in building D7 EO wilson Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Framing/Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 | P | PASS |
Dave Hannah
|
|
|
Inspection for framing sometime between 12pm and 4pm please. Phone #: ###-#### Inspection requested via web by Savannah Sanderson
|
BLD-Wall cover | 3/13/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Dave Hannah
|
|
|
Approval to cover ceiling prior to spray foam, had a partial already this is for the remainder Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Wall cover | 2/28/2019 | 2/28/2019 | 3/1/2019 | P | PART |
Jim Sly
|
|
|
This is a partial approval for cover in the bathrooms and common area of D7. Please check in with Brandon ###-#### Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Framing/Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | PASS |
Dave Hannah
|
|
|
Building D7 Partial approval to cover with spray foam. Electrical is approved and Plumbing should be first thing in a.m. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
Elevation Cert Rec'd-Midconst | | | 2/21/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PEND |
Dave Hannah
|
|
|
Roddy Phone #: ###-#### needs flood plan certs
|
BLD-Framing/Rough-in | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Dave Hannah
|
|
|
Rody Phone #: ###-#### roof framing ok to cover ext side
|
BLD-Concrete | 9/5/2018 | 9/6/2018 | 9/6/2018 | P | PEND |
Dave Hannah
|
|
|
Requesting a rebar inspection for Thursday afternoon between 3pm-4pm. There will be a concrete pour on Friday morning. Phone #: ###-#### Inspection requested via web by Justin Palm ok after specal inspection sign off
|
BLD-Foundation | 8/31/2018 | 9/5/2018 | 9/6/2018 | P | PEND |
Dave Hannah
|
|
|
Rebar inspection at remaining stem walls D7 EO Wilson building. Phone #: ###-#### Inspection requested via web by Brandon Reynolds ok after spec inspection sign off
|
BLD-Foundation | 8/31/2018 | 9/4/2018 | 8/31/2018 | P | CANC |
Dave Hannah
|
|
|
Rebar inspection in remaining walls D7 EO Wilson Building. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD-Concrete | 8/27/2018 | 8/28/2018 | 8/29/2018 | P | PASS |
Dave Hannah
|
|
|
We need a rebar inspection in the afternoon on Tuesday, 8/28. Anytime in the afternoon before 4pm. Phone #: ###-#### Inspection requested via web by Justin Palm
|
BLD-Foundation | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | PASS |
Dave Hannah
|
|
|
rebar inspection for NW half of EO Wilson building Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Footing | 8/7/2018 | 8/8/2018 | 8/9/2018 | P | PASS |
Dave Hannah
|
|
|
There will be a footing pour the following day, Thursday, at 5am. Inspection can be as late as 3:30pm on Wednesday the 8th. Inspection requested via web by Justin Palm
|
BLD-Concrete | 8/7/2018 | 8/9/2018 | 8/7/2018 | A | CANC |
Dave Hannah
|
|
|
Column footing to be poured early morning. Expecting mud at 5am. There is an additional footing pour happening on site, same day/same time, different building and permit number. I will put in for an individual inspection, just know its all on the same job site. Number listed is for Savannah, she will be on site. Phone #: ###-#### >> Inspection requested via web by Justin Palm Inspection cancelled from web by: Justin Palm
|
CHANGE STATUS TO (ISS) | | | 8/7/2018 | | DONE |
|
|
|
put in rdy staus by mistake
|
Permit Ready to Issue | | | 7/10/2018 | | DONE |
|
|
|
|
Telephone call | | | 4/23/2018 | | DONE |
|
|
|
Spoke with Jackie to recommend sending in a request for an extension if not ready to pay and pick up. stated that they should be paid for and picked up today, but will call back if not able to
|
Issue PAID IN FULL permit | | | 4/23/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/23/2018 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 4/20/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 4/20/2018 | | DONE |
|
|
|
met
|
Plan assigned to (CDM) | 12/6/2017 | 12/6/2017 | 4/19/2018 | | PASS |
Carl D Madsen
|
|
|
Zoo Boise
|
Routing - PLAN CHECK | 3/15/2018 | | 4/19/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 3/15/2018 | | 4/19/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 4/19/2018 | | 4/19/2018 | | PASS |
Mike Sheppard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2018 | | DONE |
|
|
|
|
Routing PW Sewer Design | 4/17/2018 | | 4/19/2018 | | PASS |
Mike Sheppard
|
|
|
per eplan
|
Elevation Cert Rec'd-Prelim | | | 4/4/2018 | | DONE |
|
|
|
|
Routing PW Flood Plain | 4/4/2018 | | 4/4/2018 | | PASS |
Jason C. Taylor
|
|
|
NOTE:
Two Elevation Certificates will be required; one prior to any vertical construction, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor ###-####.
|
Routing PW Sewer Design | 4/3/2018 | | 4/3/2018 | | FAIL |
Mike Sheppard
|
|
|
|
Routing PW Drainage | 3/16/2018 | | 3/16/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 3/15/2018 | | 3/16/2018 | | PASS |
David Moser
|
|
|
|
Routing - FIRE | 2/8/2018 | 2/9/2018 | 2/9/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 1/20/2018 | | 2/8/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 1/20/2018 | | 2/8/2018 | | FAIL |
Carl D Madsen
|
|
|
Pending other department approvals
|
Routing PW Sewer Design | 1/22/2018 | | 2/8/2018 | | FAIL |
Mike Sheppard
|
|
|
Sewer plans have not been approved
|
Routing PW Flood Plain | 1/22/2018 | | 2/2/2018 | | FAIL |
Jason C. Taylor
|
|
|
Elevation Certificate Needed, elevations need to be placed on site plan, foundation plan, and these cross section plans. Jason Taylor ###-####
|
Routing - PLANNING | 1/20/2018 | | 1/24/2018 | | FAIL |
David Moser
|
|
|
Need to submit Floodplain Development application
|
Routing - PUBLIC WORKS | 1/20/2018 | | 1/22/2018 | | PASS |
Rachael Beierle
|
|
|
ADDED 2 MORE HB'S IN MOD. PERMIT ADJUSTED.
|
Route to Impact Fee Review | 1/5/2018 | 1/8/2018 | 1/10/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 1/5/2018 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/6/2017 | | 1/5/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 12/6/2017 | | 1/5/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 12/6/2017 | | 12/22/2017 | | FAIL |
Mike Sheppard
|
|
|
Submit new sewer plans per BFE Requirements
|
Routing - PLANNING | 12/6/2017 | | 12/21/2017 | | FAIL |
David Moser
|
|
|
need floodplain review application
|
Routing PW Flood Plain | 12/6/2017 | | 12/18/2017 | | FAIL |
Jason C. Taylor
|
|
|
Need project to comply with floodplain ordiance and new BFE from FEMA maps. Please resubmit revised drawings showing how project will comply with ordinance. Jason Taylor ###-####
|
Routing PW Environmental | 12/6/2017 | | 12/18/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 12/6/2017 | 12/6/2017 | 12/15/2017 | | FAIL |
Scott Arellano
|
|
|
Emailed correction items to architect. Attached plan review report to case.
|
Routing - PUBLIC WORKS | 12/6/2017 | | 12/13/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 12/6/2017 | | 12/12/2017 | | FAIL |
Brian Murphy
|
|
|
SOIL MIX APDX J AND INFILTRATION RATES
|
Routing - PLUMBING | 12/6/2017 | | 12/11/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 12/6/2017 | | 12/6/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 12/6/2017 | | 12/6/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 12/6/2017 | | 12/6/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - Erosion and Sediment | 12/6/2017 | | 12/6/2017 | | PASS |
Michael Zawacki
|
|
|
Two SWPPP provided. Job is located in floodplain. CM company will provide RP which is still needed. SWPPP states 2.3 acres of disturbed area.
|
Routing PW Solid Waste | 12/6/2017 | | 12/6/2017 | | PASS |
Evan Carpenter
|
|
|
Assuming there are no changes to solid waste dumpster access at the site
|
Plans ACCEPTED BY PLAN TECH | | | 12/4/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/4/2017 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/4/2017 | | DONE |
|
|
|
plan review intake fees all paid to this permit
|
Application received | | | 10/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 25 2017 4:44PM
|
Routing PW Drainage | 1/22/2018 | | 2/1/2017 | | FAIL |
Brian Murphy
|
|
|
need new swale detail geo,stormwater grade to swales
|