Routing - Design Review | 11/9/2017 | | 11/9/2018 | | PASS |
KayCee Babb
|
|
|
|
BLD-Final | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
Zoning Approval | 9/5/2018 | 9/5/2018 | 9/5/2018 | | FAIL |
KayCee Babb
|
|
|
Bike parking has not been installed per CZC17-00256
|
Zoning Approval | 9/5/2018 | 9/5/2018 | 9/5/2018 | | PASS |
KayCee Babb
|
|
|
per CZC17-00256 revised 9-5-18
|
BLD-Final | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | NR |
Jim Sly
|
|
|
Chris Phone #: ###-#### Need Zoning final
|
FIRE-Final Inspection | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Chris Phone #: ###-####
|
FIRE-Final Inspection | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide small documents, provide exit discharge lighting at Door #2, remove the tape and shipping clip from sprinkler in Storage Room, provide hardware for the glass double doors, provide modified plans that show the actual installation or walls, provide occupant load sign in the approved location.
|
BLD-Framing/Rough-in | 6/15/2018 | 6/18/2018 | 6/18/2018 | P | PART |
Mike Jordan
|
|
|
Micheal Phone #: ###-####. grid ok, pending fire sprinkler rough in and electrical at back room.
|
BLD-Framing/Rough-in | 6/11/2018 | 6/12/2018 | 6/12/2018 | P | NR |
Mike Jordan
|
|
|
Michael, request before 3:30PM Phone #: ###-####. Grid inspection. Needs MEP's and fire sprinkler rough in inspections first.
|
BLD-Framing/Rough-in | 5/21/2018 | 5/22/2018 | 5/23/2018 | P | PART |
Jim Sly
|
|
|
Micheal Phone #: ###-#### Store front OK.
|
BLD-Framing/Rough-in | 5/15/2018 | 5/16/2018 | 5/16/2018 | P | PART |
Jim Sly
|
|
|
micheal Phone #: ###-#### All good......Just store front area left to go.....
|
BLD-Framing/Rough-in | 4/9/2018 | 4/10/2018 | 4/10/2018 | P | PART |
Jim Sly
|
|
|
Michael Phone #: ###-#### Everything OK except......Wall separating new from existing area.
|
BLD-Footing | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-#### (2) column pad footings....OK.
|
Print Occupancy Form | | | 2/22/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/22/2018 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 11/9/2017 | 11/9/2017 | 2/8/2018 | | PASS |
Carl D Madsen
|
|
|
Library Expansion
|
Routing - PLAN CHECK | 1/20/2018 | | 2/8/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/8/2018 | | DONE |
|
|
|
Need:
GC form
Revised value-met
|
Route to Impact Fee Review | 12/9/2017 | 12/12/2017 | 12/11/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 12/9/2017 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/9/2017 | | 12/9/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 11/9/2017 | 11/9/2017 | 11/16/2017 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - MECHANICAL | 11/9/2017 | | 11/15/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 11/9/2017 | | 11/15/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Erosion and Sediment | 11/9/2017 | | 11/13/2017 | | PASS |
Michael Zawacki
|
|
|
No ESCP needed. Interior improvements only.
|
Intake Approval | | | 11/9/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Carl M approved pre screen
|
Routing - Addressing | 11/9/2017 | | 11/9/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/9/2017 | | 11/9/2017 | | PASS |
Morgan Webb
|
|
|
|
Plan Reviewer's activity | | | 11/9/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
email sent 11-8-17
Steve,
Please make sure that you reach out to ACHD for review on this change of use/occupancy. If additional fees are due they will need to be paid or paid when the permit is issued. If no fees are do please submit the documentation from ACDH as such.
Thank you
|
Application received | | | 11/1/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 1 2017 10:33AM
|