Permit Information
Permit NumberBLD17-03978
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 720 E PARK BLVD Unit: 200
Project NameSt. Luke's Telehealth
Customer Number 
ePlanReviewYes
Description
(ST. LUKE’S TELEHEALTH – WG CENTRAL PLAZA – WEST HALF OF 2ND STORY) (4-26-18 PLAN MODIFICATION TO REMODEL A FORMER FILE ROOM WITHIN THIS TENANT SPACE ON THE 2ND STORY TO INCLUDE UPS ELECTRICAL EQUIPMENT. ELECTRICAL AND MECHANICAL EQUIPMENT WILL BE INSTALLED UNDER THIS PERMIT INCLUDING THE ELECTRICAL SUPPLY TO FAN COIL UNITS AND CONDENSING UNITS IN THE BASEMENT UPS ROOM. THE UPS ROOM IN THE BASEMENT IS COVERED UNDER PERMIT BLD18-00964) The fire sprinkler system is used for unlimited area of the building. To remodel an existing 27,164 square foot office tenant space for a new office tenant. Work is to include interior nonbearing walls, 2 multi-user toilet rooms upgraded to be accessible to the disabled, a sink within an existing single user toilet room relocation to make the toilet accessible to the disabled, new suspended acoustical ceilings, interior doors, millwork, and finishes. A new wall will be constructed within the mechanical penthouse. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/16/20194/11/2019 DONE
This permit finaled on the web by Curtis Weedop
Third Notice 3/12/20194/11/2019 DONE
mailed 4-12-19 with first follow up letter, mcenteev@slhs.org (vira)
First Follow up  4/11/2019 DONE
Third Notice 2/11/20193/7/2019 DONE
emailed curtis 3-7-19
Third Notice 1/13/20192/6/2019 DONE
emailed curtis 2-6-19
Second Notice 12/24/20181/8/2019 DONE
emailed value to curtis
First Notice 12/9/201812/14/2018 DONE
mailed 12-17
Permanent Occupancy  11/29/2018 DONE
BLD-Final7/31/20188/1/20188/1/2018APASS
DetailsDave Hannah
Zach Phone #: ###-####
FIRE-Final Inspection7/27/20187/30/20187/30/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, balcony thumbturn deadbolt will be removed or replaced before final building permit inspection. Final life fire safety nispection complete.

Please call ahead // Zac Phone #: ###-####
BLD-Ceiling Grid Inspection5/10/20185/10/20185/10/2018PPASS
DetailsDave Hannah
Ken Storey Phone #: ###-####
Print Occupancy Form  5/10/2018 DONE
CHANGE STATUS TO (ISS)  5/10/2018 DONE
Plan assigned to (CJW)4/24/20184/24/20184/26/2018 PASS
DetailsCarl Westfall
x plan mod
Routing - PLAN CHECK4/25/2018 4/26/2018 PASS
DetailsCarl Westfall
Plan Reviewer's activity  4/26/2018 PASS
DetailsCarl Westfall
1st plan mod approved
Permit Ready to Issue  4/26/2018 DONE
Plan Mod Approved
DO NOT REISSUE
CHANGE STATUS TO (FEE)  4/26/2018 DONE
waiting for revised cert of value
Permit Ready to Issue  4/26/2018 DONE
PLAN MOD
Need Cert of Value-met
Plan Modification Accepted  4/24/2018 DONE
Plan mod accepted-mModifying the original file room to include a UPS electrical equipment. Please note that the
room to be used for the UPS equipment is being constructed under permit application BLD18-00964.
Only the electrical and mechanical equipment is being installed as apart of this permit #BLD17-03978
BLD-Ceiling Grid Inspection3/27/20183/28/20183/28/2018APASS
DetailsDave Hannah
Zack Phone #: ###-#### hard lid
BLD-Framing/Rough-in3/23/20183/26/20183/26/2018APASS
DetailsDave Hannah
Zach Phone #: ###-####
BLD-Framing/Rough-in2/9/20182/12/20182/12/2018APASS
DetailsDave Hannah
Zach Muller Phone #: ###-####
Issue PAID IN FULL permit  1/25/2018 DONE
Plan assigned to (CJW)11/7/201711/7/20171/12/2018 PASS
DetailsCarl Westfall
(1st done) (Nov 27 - 15 days) (61 steets) St. Luke's Telehealth
Routing - PLAN CHECK1/11/2018 1/12/2018 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  1/12/2018 DONE
Permit Ready to Issue  1/12/2018 DONE
DetailsChristina Prado
Need
GC Form - met
Revised Cert of Value - met
Plan resubmittals received  1/11/2018 DONE
Route to Impact Fee Review1/2/20181/5/20181/3/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  1/2/2018 DONE
Plan resubmittals requested  1/2/2018 DONE
Routing - PLAN CHECK11/7/2017 1/2/2018 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - PUBLIC WORKS11/7/2017 11/16/2017 PASS
DetailsMorgan Webb
Routing - PLUMBING11/15/2017 11/15/2017 PASS
DetailsBill VanDegrift
provide a drain to accept the full discharge of the R.P.'s
Routing - FIRE11/7/201711/7/201711/13/2017 PASS
DetailsErika Akin
Attached review comments to case
Routing - MECHANICAL11/7/2017 11/8/2017 PASS
DetailsTroy James
Routing - Addressing11/7/2017 11/7/2017 PASS
DetailsDoug Chausow
Plan Reviewer's activity  11/7/2017 DONE
DetailsAdele J Schaffeld-Griffin
email sent 11/7/17

Doug,

Please make sure that you reach out to ACHD for review on this change of use/occupancy.(General Office to Medical Office) If additional fees are due they will need to be paid or paid when the permit is issued. If no fees are do please submit the documentation from ACDH as such.

Thank you


Adele Schaffeld-Griffin
Assistant Building Official
Planning and Development Services
Office: ###-####
aschaffeldgriffin@cityofboise.org

Making Boise the most livable city in the country.
Intake Approval  11/7/2017 PASS
DetailsAdele J Schaffeld-Griffin
Carl W accepted pre screen
Plan Reviewer's activity  11/6/2017 PASS
Plan intake review approved
Application received  11/1/2017 DONE
Application submitted via PDS Online on Nov 1 2017 3:09PM