Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD17-04008
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 3756 S SINGLE TREE AVE
Project NameDelano A
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2653 sq. ft., two story (first story 1268 sq. ft., second story 1385 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 396 sq. ft. of covered patio/porch and a 665 sq. ft. attached garage per the approved plans. SP-01 zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20185/14/20185/14/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled5/14/20185/14/20185/14/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results5/14/20185/14/20185/14/2018ADONE
DetailsBrandon Shaw
ACH50- 3.3
BLD-Final5/8/20185/10/20185/10/2018ACANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Blower Door Test Results5/10/20185/10/20185/10/2018ADONE
DetailsBrandon Shaw
ACH50- 3.3
BLD-Energy code compliance3/7/20183/8/20183/8/2018APASS
DetailsBrandon Shaw
Corrections- SAT
BLD-Energy code compliance3/7/20183/7/20183/7/2018PNR
DetailsBrandon Shaw
Shear corrections not complete
BLD-Energy code compliance3/5/20183/7/20183/7/2018ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Wall cover3/2/20183/5/20183/5/2018AFAIL
DetailsBrandon Shaw
See correction notice

OK to insulate
BLD-Framing/Rough-in3/1/20183/5/20183/5/2018APEND
DetailsBrandon Shaw
Pending shear corrections
BLD-Foundation12/27/201712/28/201712/28/2017PPASS
DetailsBrandon Shaw
Work in progress

Frost protection required
BLD-Foundation12/27/201712/27/201712/27/2017PCANC
DetailsBrandon Shaw
Chris Phone #: ###-####
BLD-Footing12/20/201712/20/201712/20/2017PPASS
DetailsBrandon Shaw
Work in prorgess
OVERRIDE  12/8/2017  
Plan assigned to (RDP)11/30/201711/30/201712/8/2017 DONE
DetailsRob Patrick
Sent to Brian for eview
Plan Reviewer's activity  12/8/2017 DONE
DetailsRob Patrick
1st review completed  12/8/2017 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  12/8/2017 DONE
DetailsRob Patrick
Permit Ready to Issue  12/8/2017 DONE
Met
Issue PAID IN FULL permit  12/8/2017 DONE
Inspection Record Card- Bld  12/8/2017 DONE
Routing - PLAN CHECK11/7/2017 12/8/2017 PASS
DetailsBrian McGowan
Routing - MECHANICAL11/7/2017 11/9/2017 PASS
DetailsTroy James
Route to Impact Fee Review11/7/201711/10/201711/8/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PUBLIC WORKS11/7/2017 11/8/2017 PASS
DetailsRachael Beierle
Plan assigned to (BJM)11/7/201711/7/201711/7/2017 DEFR
DetailsBrian McGowan
11/20 sfd L1 ePlan
Plans ACCEPTED BY PLAN TECH  11/7/2017 DONE
Intake Approval  11/7/2017 PASS
Recd Pcfee & Taken To Pln CK  11/7/2017 DONE
Routing - PLANNING11/7/2017 11/7/2017 PASS
DetailsSue Cummings
Routing - Addressing11/7/2017 11/7/2017 PASS
DetailsDoug Chausow
Application received  11/3/2017 DONE
Application submitted via PDS Online on Nov 3 2017 10:25AM