First Notice | | 4/13/2018 | 4/3/2018 | | DONE |
|
|
|
This permit finaled on the web by Michael Gallegos
|
Permanent Occupancy | | | 4/3/2018 | | DONE |
|
|
|
|
BLD-Final | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Jim Storey
|
|
|
ti final ok
|
BLD-Final | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PART |
Jim Storey
|
|
|
Please inspect around 3 pm Phone #: ###-#### Inspection requested via web by Michael Gallegos ok for temp occ. need occupance card and door installed for storage rm
|
FIRE-Final Inspection | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher has a current inspection tag and will be mounted in discussed location. Final life fire safety inspection for area of work complete.
|
FIRE-Final Inspection | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | CANC |
Jim Page
|
|
|
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Gallegos
|
BLD-Final | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | NR |
Jim Storey
|
|
|
Inspection requested via web by Michael Gallegos need fire
|
BLD-Ceiling Grid Inspection | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Michael Gallegos
|
BLD-Framing/Rough-in | 1/9/2018 | 1/9/2018 | 1/10/2018 | P | PASS |
Jim Storey
|
|
|
Call Mike if door is locked for access Phone #: ###-#### Inspection requested via web by Michael Gallegos
|
Issue PAID IN FULL permit | | | 12/15/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/15/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 11/17/2017 | 11/17/2017 | 11/29/2017 | | PASS |
Javier Guzman
|
|
|
11/24 L1 Golf TI ePlan
|
Routing - PLAN CHECK | 11/17/2017 | | 11/29/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 11/17/2017 | | 11/29/2017 | | PASS |
Doug Chausow
|
|
|
Signed off in ePlan by Doug Chausow, Please also sign off on BLD17-04211
|
1st review completed | | | 11/29/2017 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/29/2017 | | DONE |
Christina Prado
|
|
|
NEED-do not issue without BLD17-04211
GC - met
Rev Cert of val - met
|
Routing - PLUMBING | 11/17/2017 | | 11/21/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PUBLIC WORKS | 11/17/2017 | | 11/20/2017 | | PASS |
Rachael Beierle
|
|
|
Please also sign off on BLD17-04211
|
Intake Approval | | | 11/17/2017 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 11/13/2017 | | FAIL |
Rob Patrick
|
|
|
Please provide accurate location for project. Cover Sheet A-0.0 shows 3 different locations:
(a) 2 on the picture of the "Vicinity Map" and, the address at the top of the sheet is for Fairview Ave. Permit depicts the project is on S. Federal Way.
(b) All dwgs need to have Stamp and Signature
|
Application received | | | 11/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 8 2017 10:28AM
|