Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD17-04089
StatusFinaled
Name AURIC SOLAR
Site Address 916 W WASHINGTON ST
Project NameBoise High School
Customer Number 
ePlanReviewYes
Description
(BOISE HIGH SCHOOL - AWNING SOLAR PANELS) Permit is to add 12 grid tied solar panels type Silfab 310 each being 39 inches by 65 inches on a listed solar panel Sunshield Sunmodo awning racking system attached to the existing exterior wall. Approval contingent upon adhering to the approved plans on file, structural engineering, and manufactures installation instructions. Work to include: installation of solar panels and associated electrical work. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/15/20187/13/2018 DONE
This permit finaled on the web by Rob Maes
Second Notice 6/21/20187/10/2018 DONE
mailed 7-11-18
First Notice5/29/20185/29/20186/11/2018 DONE
DetailsTony Young
mailed 6-12
BLD-Final5/29/20185/30/20185/29/2018APASS
DetailsTony Young
Pls contact Greg (Project Mgr) @ ###-#### if you have any questions. Thank you. Inspection requested via web by Rob Maes// the electrical permit was on the 1010 Washington address,, ok,, see ele18-00880
DOC - Permit Finaled5/29/20185/29/20185/29/2018PPASS
DetailsTony Young
done
BLD-Final5/25/20185/29/20185/29/2018ANR
DetailsTony Young
Pls contact Greg (Project Mgr) @ ###-#### if you have any questions. Thank you. Inspection requested via web by Rob Maes,, still needs electrical permit and inspection,, recieved letter from structural engineer of ok on installation
BLD-Final5/10/20185/11/20185/11/2018ANR
DetailsTony Young
Please contact Greg Meyet @ ###-#### one hour prior to arrival. He will meet you on site. Thank you. Inspection requested via web by Rob Maes,, called.. no answer,, left messege.. no return call,, will need electrical permit and inspection,, need letter of ok as built from the structural engineer..
BLD-Final5/3/20185/4/20185/4/2018ANR
DetailsJim Sly
Pls contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes
Verified Electr. finaled. Told Bryce That he needs Special inspection of epoxy bolting ....before final.
BLD-Framing/Rough-in3/16/20183/21/20183/21/2018PPASS
DetailsBrandon Shaw
Work in progress
Plan assigned to (JG)11/22/201711/22/20173/7/2018 PASS
DetailsJavier Guzman
1st rev comp, 12/05 Boise High Solar Panels pend eng
Routing Off Site - STRUCTURAL3/6/2018 3/7/2018 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Dave Haugland
PLANS/APPL TAKEN TO FRONT DESK  3/7/2018 DONE
Permit Ready to Issue  3/7/2018 DONE
NEED
GC FORM - met
Issue PAID IN FULL permit  3/7/2018 DONE
Inspection Record Card- Bld  3/7/2018 DONE
Routing Off Site - STRUCTURAL2/22/2018 3/5/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK2/22/2018 2/24/2018 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL2/7/2018 2/20/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineers Dave Haugland
Routing - PLAN CHECK2/7/2018 2/20/2018 FAIL
DetailsJavier Guzman
Routing - Design Review2/7/2018 2/7/2018 PASS
DetailsAndrea Tuning
Plan Reviewer's activity  1/30/2018 DONE
DetailsJavier Guzman
No engineering calculation and No planning and zoning approval letter uploaded, please upload items requested from the panning & Zoning and the requested engineering calculations
Routing Off Site - STRUCTURAL1/22/2018 1/27/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineers Dave Haugland
Routing - PLAN CHECK1/22/2018 1/27/2018 PASS
DetailsJavier Guzman
Routing - Design Review1/22/2018 1/22/2018 FAIL
DetailsAndrea Tuning
This request requires Design Review approval.
Route to Impact Fee Review12/7/201712/10/201712/8/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  12/7/2017 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL11/22/2017 12/7/2017 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineers Dave Haugland
Routing - PLAN CHECK11/22/2017 12/7/2017 PASS
DetailsJavier Guzman
Routing - ELECTRICAL11/22/2017 12/7/2017 PASS
DetailsJavier Guzman
Routing - FIRE11/22/201711/22/201711/27/2017 PASS
DetailsScott Arellano
No separate comments attached to plans. The following items shall be field verified by the PDS/Fire & Electrical field inspectors.

IFC 605.11.1 Marking is required on interior and exterior direct-current (DC) conduit, enclosures, raceways, cable assemblies, junction boxes, combiner boxes and disconnects.

605.11.1.1 The materials used for marking shall be reflective, weather resistant and suitable for the environment.

605.11.1.2 The marking shall contain the words “WARNING: PHOTOVOLTAIC POWER SOURCE.”

605.11.1.3 The marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated.

605.11.1.4 Marking shall be placed on interior and exterior DC conduit, raceways, enclosures and cable assemblies every 10 feet , within 1 foot of turns or bends and within 1 foot above and below penetrations of roof/ceiling assemblies, walls or barriers.
Routing - PLANNING11/22/2017 11/24/2017 PASS
DetailsNicolette Womack
Routing - Design Review11/22/2017 11/22/2017 FAIL
DetailsSarah Schafer
Planning approval required. Applicant's rep/contractor has been contacted. Further discussions will take place on 11/27/17.
Intake Approval  11/22/2017 PASS
Intake Approval  11/14/2017 FAIL
DetailsJavier Guzman
Please provide the following and upload:
• Any items the checklist is requesting and applies to your project shall be uploaded, Incomplete submittals will not be accepted. Applicants with incomplete submittals must upload additional documents
• Please provide a cut sheet showing the listing for the sunshield awning
• Please provide details, listing, size and type of combiner box “JB-R”
• Please provide per snap n rack manufacturer’s specifications and shows its listed
• Please provide per snap n rack manufacturer’s specifications that show method of grounding and bonding of modules and arrays
• Please provide Snap N Rack Cut manufactures specifications and shows its listed
• Plans show Enphase S280 micro inverters but a spec sheet od Enphase IQ 6 was uploaded please revise plans to match uploaded micro inverters or provide Enphase S280 micro inverters manufactures specifications and shows its listed
Application received  11/9/2017 DONE
Application submitted via PDS Online on Nov 9 2017 8:25AM
Intake Approval  11/9/2017 FAIL
DetailsJavier Guzman
Please provide the following and upload:
• Please provide a completed #520 PV Checklist found at our website at https://pds.cityofboise.org/media/466093/520-commercial-pv-solar-thermal-systems-submittal-checklist-final_9-25-17.pdf
• The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed.
• Any items the checklist is requesting and applies to your project shall be uploaded, Incomplete submittals will not be accepted. Applicants with incomplete submittals must upload additional documents
• Any item on the checklist that only has a single box for checking that item shall be required