BLD-Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Tony Young
|
|
|
|
Zoning Approval | 10/1/2018 | 10/1/2018 | 10/1/2018 | | PASS |
Ted Vanegas
|
|
|
|
BLD-Energy code compliance | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | PEND |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to insulate but needs to fire block basement at top plates furred out walls and fur out walls with full leight 2x4 in kitchen wall where plumbing has over cut ext wall studs
|
BLD-Framing/Rough-in | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PASS |
Dave Hannah
|
|
|
shear // Derek Phone #: ###-####
|
BLD-Foundation | 1/18/2018 | 1/19/2018 | 1/19/2018 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Footing | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Brandon Shaw
|
|
|
john Phone #: ###-####
|
Routing Walk-In (BLD) | 12/21/2017 | 12/21/2017 | 12/21/2017 | A | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (Zoning) | 12/21/2017 | 12/21/2017 | 12/21/2017 | A | PASS |
Ted Vanegas
|
|
|
|
Routing - PLAN CHECK | 12/21/2017 | | 12/21/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/21/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2017 | | DONE |
Josh Bogle
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/21/2017 | | DONE |
|
|
|
Plan Mod approved
|
(F) Reprint permit | | | 12/21/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/9/2017 | 11/9/2017 | 11/9/2017 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 11/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 11/9/2017 | | 11/9/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/9/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/9/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/9/2017 | | DONE |
|
|
|
|
Application received | | 11/9/2017 | | | |
|
|
|
|