Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-04100
StatusFinaled
Name ALTURAS CONSTRUCTION
Site Address 4875 S CHUGWATER WAY
Project NameRH 14 10 TETON 2
Customer Number 
ePlanReviewYes
Description
***FLOODPLAIN = IN, BUT EXEMPTED BY JASON TAYLOR PUBLIC WORKS*** WUI ZONE B CLASS A ROOF REQUIRED*** Permit for the construction of a new 2983 sq. ft., two story (first story 2284 sq. ft., basement area 699 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 240 sq. ft. of covered patio/porch and a 991 sq. ft. attached garage per the approved plans. SP-02 zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  6/12/2018 DONE
BLD-Final6/6/20186/6/20186/7/2018PPASS
DetailsBrandon Shaw
Tim Phone #: ###-####
DOC - Permit Finaled6/7/20186/7/20186/7/2018PPASS
DetailsBrandon Shaw
BLD-Wall Bracing3/15/20183/15/20183/16/2018PPASS
DetailsBrandon Shaw
Tim-interior Phone #: ###-####
BLD-Energy code compliance3/8/20183/9/20183/9/2018APASS
DetailsBrandon Shaw
Tim Phone #: ###-####
BLD-Framing/Rough-in3/6/20183/7/20183/7/2018APASS
DetailsDave Hannah
BLD-Framing/Rough-in3/5/20183/6/20183/6/2018ANR
DetailsBrandon Shaw
Tim Phone #: ###-####
Plan Modification Accepted  2/21/2018 DONE
New manual j report
Routing - MECHANICAL2/21/2018 2/21/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing2/15/20182/16/20182/16/2018APASS
DetailsBrandon Shaw
Tim Phone #: ###-####
BLD-Foundation12/18/201712/20/201712/20/2017APASS
DetailsBrandon Shaw
Tim Phone #: ###-####
BLD-Footing12/12/201712/13/201712/13/2017APASS
DetailsBrandon Shaw
Work in progress

Frost protection required
OVERRIDE  12/8/2017  
Issue PAID IN FULL permit  12/8/2017 DONE
Inspection Record Card- Bld  12/8/2017 DONE
Plan assigned to (M_H)12/4/2017 12/8/2017 DONE
DetailsMichael Hanson
11/28 sfd L2 ePlan - 1st review completed. Sent to BJM and JAB. MDH
Plan Reviewer's activity  12/8/2017 DONE
DetailsMichael Hanson
1st review completed  12/8/2017 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  12/8/2017 DONE
DetailsMichael Hanson
Permit Ready to Issue  12/8/2017 DONE
met
Routing - PLAN CHECK11/9/2017 12/8/2017 PASS
DetailsBrian McGowan
Routing PW Flood Plain11/13/2017 11/17/2017 PASS
DetailsJason C. Taylor
LOMR in place. No floodplain review required. JCT
Routing - MECHANICAL11/9/2017 11/15/2017 PASS
DetailsChad Schwendiman
Route to Impact Fee Review11/9/201711/12/201711/13/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PUBLIC WORKS11/9/2017 11/13/2017 PASS
DetailsRachael Beierle
Application received  11/9/2017 DONE
Application submitted via PDS Online on Nov 9 2017 12:17PM
Plan assigned to (BJM)11/9/201711/9/201711/9/2017 DEFR
DetailsBrian McGowan
11/28 sfd L2 ePlan
Plans ACCEPTED BY PLAN TECH  11/9/2017 DONE
Intake Approval  11/9/2017 PASS
Recd Pcfee & Taken To Pln CK  11/9/2017 DONE
Routing - PLANNING11/9/2017 11/9/2017 PASS
DetailsJeff Lowe
Routing - Addressing11/9/2017 11/9/2017 PASS
DetailsDoug Chausow