BLD-Final | 5/16/2018 | 5/17/2018 | 5/18/2018 | P | PASS |
Jim Sly
|
|
|
Please call ahead for access - Dan Phone #: ###-####
|
DOC - Permit Finaled | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | PASS |
Jim Sly
|
|
|
Bobbie Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | PASS |
Jim Sly
|
|
|
Call 30 mins ahead- Bobby Phone #: ###-#### FRAME AND ENERGY>>>>OK.
|
BLD-Framing/Rough-in | 1/26/2018 | 1/29/2018 | 1/29/2018 | P | CANC |
Jim Sly
|
|
|
jojo Phone #: ###-####
|
Routing - MECHANICAL | 1/3/2018 | | 1/3/2018 | | PASS |
Troy James
|
|
|
New manual j report
|
BLD-Framing/Rough-in | 12/14/2017 | 12/15/2017 | 12/15/2017 | P | PART |
Jim Sly
|
|
|
Bobby Joe Phone #: ###-#### Roof and Shear nailing only.......OK.
|
BLD-Foundation | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-#### Existing and new addition.
|
BLD-Footing | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-#### Existing and new addition.
|
OVERRIDE | | | 12/1/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 12/1/2017 | 12/1/2017 | 12/1/2017 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 12/1/2017 | | 12/1/2017 | | FAIL |
Josh Bogle
|
|
|
missing a couple details: crawl acces, attic ventilation, etc.
|
Routing - PLAN CHECK | 12/1/2017 | | 12/1/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 12/1/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/1/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/1/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/1/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | FAIL |
Brian McGowan
|
|
|
More information required
|
Routing Walk-In (Zoning) | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 11/29/2017 | | 11/29/2017 | | FAIL |
Brian McGowan
|
|
|
Exterior elevations, window sizes, door sizes, bathroom fixtures, section thru proposed addition required.
|
Routing Walk-In (Zoning) | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | CANC |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/9/2017 | | 11/9/2017 | | FAIL |
Josh Bogle
|
|
|
no contact with applicant
|
1st review completed | | | 11/9/2017 | | CANC |
Josh Bogle
|
|
|
no contact with applicant
|
Application received | | 11/9/2017 | | | |
|
|
|
|