Permit Information
Permit NumberBLD17-04103
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 7576 W VICTORY RD
Project NameCollins Engineering
Customer Number 
ePlanReviewYes
Description
(COLLINS ENGINEERING – ) The fire sprinkler system is used for building area increase and for fire area. Permit is to create a 2,800 sq. ft. office/warehouse tenant space within the 21,885 sq. ft. building. The building shell was constructed under permit BLD17-00763. Approval is contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create a demising wall, conference room, a storage room, an open office area, a warehouse area and (2) accessible restrooms, new door/doorframes, select new interior window, millwork, select new suspended acoustic and gypsum ceilings, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  6/27/2018 DONE
Second Notice 5/21/20186/11/2018 DONE
mailed 6-12
First Notice 4/14/20185/11/2018 DONE
mailed 5-14
Permanent Occupancy  4/4/2018 DONE
DetailsChristina Prado
BLD-Final3/30/20183/30/20183/30/2018PPASS
DetailsDave Hannah
Please call if you are running late, I can stay late if necessary. Thanks Phone #: ###-#### Inspection requested via web by Mark Steen
FIRE-Final Inspection3/29/20183/30/20183/30/2018APASS
DetailsTroy Cobbley
life safety passed


Please see request for fire sprinkler final to save on two trips to same site. Phone #: ###-#### Inspection requested via web by Mark Steen
BLD-Ceiling Grid Inspection3/22/20183/22/20183/22/2018PPASS
DetailsBrandon Shaw
Cover inspections above ceiling have been requested for Thursday PM.
Hoping to drop tile tomorrow. Thanks Phone #: ###-#### Inspection requested via web by Mark Steen
BLD-Framing/Rough-in2/15/20182/15/20182/15/2018PPASS
DetailsJim Storey
Collins Engineers Phone #: ###-#### Inspection requested via web by Mark Steen
Issue PAID IN FULL permit  1/24/2018 DONE
Print Occupancy Form  1/24/2018 DONE
Plan assigned to (JG)12/28/201712/28/20171/23/2018 PASS
DetailsJavier Guzman
1st rev comp, 1/10 L2 Collins Engineering T.I. ePlan
Routing - PLAN CHECK1/22/2018 1/23/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/23/2018 DONE
Permit Ready to Issue  1/23/2018 DONE
DetailsChristina Prado
Email Jacqi permits to sign - Jacqi Norton

Need
GC Form - met
Revised Cert of Value - met
Route to Impact Fee Review1/18/20181/21/20181/22/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK1/22/2018 1/22/2018 FAIL
DetailsJavier Guzman
1st review completed  1/18/2018 DONE
DetailsJavier Guzman
Routing - PLAN CHECK12/28/2017 1/18/2018 FAIL
DetailsJavier Guzman
Routing - FIRE12/28/201712/28/20171/4/2018 PASS
DetailsScott Arellano
Attached comments to case
Routing - MECHANICAL12/28/2017 12/29/2017 PASS
DetailsChad Schwendiman
Routing - PLUMBING12/28/2017 12/29/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing12/28/2017 12/28/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/28/2017 12/28/2017 PASS
DetailsRachael Beierle
NO REVIEW NEEDED FOR PRETREATMENT PER RWC
Intake Approval  12/28/2017 PASS
DetailsJavier Guzman
Application received  11/9/2017 DONE