BLD-Final | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | PASS |
Tony Young
|
|
|
Dusty Phone #: ###-####,, all corrections made ok at time of inspection
|
DOC - Permit Finaled | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | PASS |
Tony Young
|
|
|
certificate of occupancy issued
|
Elevation Cert Rec'd-Final | | | 4/12/2018 | | DONE |
|
|
|
|
Routing PW Flood Plain | 4/12/2018 | | 4/12/2018 | | PASS |
Jason C. Taylor
|
|
|
Recieved elevation certificate #3
|
BLD-Final | 4/10/2018 | 4/11/2018 | 4/11/2018 | P | FAIL |
Tony Young
|
|
|
Dusty Phone #: ###-####,, walk through only,, needs trades, pw flood plain,, stairs, hand rails , drainage etc. to meet min. code
|
(F) Reprint permit | | | 3/21/2018 | | DONE |
|
|
|
|
BLD-Wall Bracing | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PASS |
Tony Young
|
|
|
Dusty Phone #: ###-####, interior ok
|
BLD-Energy code compliance | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | DONE |
Tony Young
|
|
|
Dusty Phone #: ###-####
|
BLD-Energy code compliance | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Tony Young
|
|
|
Dusty Phone #: ###-####,, work in progress,, ok,, will need interior shear later
|
BLD-Framing/Rough-in | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PART |
Tony Young
|
|
|
Dusty Phone #: ###-####,, see other notes,, flood cert ok per JT
|
BLD-Framing/Rough-in | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PART |
Tony Young
|
|
|
Dusty Phone #: ###-####,, need truss braces,, ok to insulate
|
BLD-Framing/Rough-in | 2/14/2018 | 2/15/2018 | 2/15/2018 | P | NR |
Tony Young
|
|
|
Dusty Phone #: ###-####,, needs truss engineering,, seal package
|
Override - Condition Holds | 2/15/2018 | 1/1/1900 | 2/15/2018 | | |
|
|
|
floodplain
|
Elevation Cert Rec'd-Midconst | | | 2/15/2018 | | DONE |
|
|
|
Recieved Elevation Certificate #2
|
BLD-Wall Bracing | 2/12/2018 | 2/13/2018 | 2/13/2018 | A | PASS |
Tony Young
|
|
|
Dusty Phone #: ###-####,, reviewed letter and fixes from performance engineering,, ok to cover exterior
|
BLD-Wall Bracing | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PEND |
Tony Young
|
|
|
Dusty Phone #: ###-####,, need a letter of ok from the structural engineer on all structural elements as built,, covered up and changes made,, added bolt for hold down,, king stud difference
|
Override - Condition Holds | 2/5/2018 | 1/1/1900 | 2/5/2018 | | |
|
|
|
not a frame inspection
|
Plan resubmittals received | | | 2/2/2018 | | DONE |
|
|
|
a copy of stair calculations stamped and taken to BJM
|
Routing - PLAN CHECK | 2/2/2018 | | 2/2/2018 | | PASS |
Brian McGowan
|
|
|
Uploaded new concrete stair design and calculations. Minimal time, no charge.
|
Case Summary (BLD) | | | 2/2/2018 | | DONE |
Brian McGowan
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/2/2018 | | DONE |
|
|
|
Plan Modification Approved
|
(F) Reprint permit | | | 2/2/2018 | | DONE |
|
|
|
|
BLD-Conference | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | DONE |
Dave Hannah
|
|
|
Dusty Phone #: ###-####
|
Override - Condition Holds | 1/30/2018 | 1/1/1900 | 1/30/2018 | | |
|
|
|
BLD CONF
|
Plan Modification Accepted | | | 1/26/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/26/2018 | | 1/26/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Concrete | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
BLD-Footing | 1/4/2018 | 1/4/2018 | 1/4/2018 | P | NR |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
BLD-Other | 12/20/2017 | 12/20/2017 | 12/20/2017 | P | PASS |
Mike Jordan
|
|
|
slab insulation insp // Zach ###-####
|
Override - Condition Holds | | | 12/20/2017 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/19/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/15/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 12/13/2017 | 12/13/2017 | 12/15/2017 | | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 12/15/2017 | | DONE |
|
|
|
called Zach to let know plan mod is ready to be picked up-
do not re issue-left message on cell
|
Routing - PLAN CHECK | | | 12/15/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 12/15/2017 | | DONE |
|
|
|
two copies for three sheets for engineering given to brian mc
|
Override - Condition Holds | | | 12/15/2017 | | |
|
|
|
|
Override - Condition Holds | | | 12/15/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 12/15/2017 | | DONE |
|
|
|
plan mod is ready but please do no re issue
|
Routing PW Flood Plain | 12/13/2017 | | 12/13/2017 | | CANC |
Jason C. Taylor
|
|
|
No review required. Resubmital of concrete stairs will not affect floodplain BFE. JCT
|
Plan resubmittals received | | | 12/13/2017 | | DONE |
|
|
|
Two copies of full set of plans, sheets 1 - 10 and two copies of concrete stair calculation. taken to Jason Taylor for floodplain review
|
BLD-Footing | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
Override - Condition Holds | 12/8/2017 | 1/1/1900 | 12/8/2017 | | |
|
|
|
this is for footings inspection
|
Telephone call | | | 12/8/2017 | | DONE |
|
|
|
talked to Zach about the flood plain inspections and certs that are needed. I printed out Jason Taylors notes and showed him and attached to his papaerwork
|
Override - Condition Holds | | | 12/8/2017 | | |
|
|
|
|
Override - Condition Holds | | | 12/8/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/8/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/7/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 11/29/2017 | 11/29/2017 | 12/7/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete - fail-12/4 sfd L2 paper
|
Inspection Record Card- Bld | | | 12/7/2017 | | DONE |
|
|
|
|
Telephone call | | | 12/7/2017 | | DONE |
|
|
|
Spoke with Zack informing him that this permit is ready to be picked up and the fee amount is due
|
Plan resubmittals received | | | 12/7/2017 | | DONE |
|
|
|
Two copies of HVAC packets taken to Brian Mc. Two copies of full set of plans (sheets 1 -10), but not stamped and signed, Brian said he would call Zack
|
Routing - PLAN CHECK | 12/7/2017 | | 12/7/2017 | | FAIL |
Brian McGowan
|
|
|
Resubmitted plans did not have the engineer's stamp and signature.
|
Plan resubmittals received | | | 12/7/2017 | | DONE |
|
|
|
Two copies of full set of plans (sheets 1 -10),stamped and signed by engineer. Taken to BJM
|
Routing - PLAN CHECK | 12/7/2017 | | 12/7/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 12/7/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/2017 | | DONE |
Brian McGowan
|
|
|
|
Override - Condition Holds | | | 12/7/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 12/7/2017 | | DONE |
|
|
|
met
|
Routing - Erosion and Sediment | 12/5/2017 | | 12/6/2017 | | PASS |
Michael Zawacki
|
|
|
|
1st review completed | | | 12/5/2017 | | FAIL |
Brian McGowan
|
|
|
structure verification, egress windows, material specifications needed
|
Routing - PLAN CHECK | 11/30/2017 | | 12/5/2017 | | FAIL |
Brian McGowan
|
|
|
structure verification, egress windows, material specifications needed
|
Plan Modification Accepted | | | 12/4/2017 | | DONE |
|
|
|
Revised Manaul J
|
Routing - MECHANICAL | 12/4/2017 | | 12/4/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - MECHANICAL | 11/29/2017 | | 11/30/2017 | | FAIL |
Chad Schwendiman
|
|
|
Emailed corrections to Heating Supply
|
Routing - PLANNING | | | 11/29/2017 | | PASS |
|
|
|
|
Routing - Addressing | 11/29/2017 | | 11/29/2017 | | PASS |
Jason C. Taylor
|
|
|
Approved 11/16/2017 by Doug
|
Routing - PUBLIC WORKS | | | 11/29/2017 | | PASS |
|
|
|
|
Routing PW Flood Plain | 11/29/2017 | | 11/29/2017 | | PASS |
Jason C. Taylor
|
|
|
NOTE:
Two Elevation Certificates will be required; one prior to any vertical construction, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor ###-####
|
Elevation Cert Rec'd-Prelim | | | 11/29/2017 | | DONE |
|
|
|
|
Intake Approval | | | 11/29/2017 | | PASS |
|
|
|
just received plans that were left on BJM's desk. Started routing to all departments.
|
Plan resubmittals received | | | 11/27/2017 | | DONE |
|
|
|
Full new set of plans, sheets 1-10 and one copy of elevation certificate. taken to Brian Mc
|
Plan assigned to (BJM) | 11/15/2017 | 11/15/2017 | 11/17/2017 | | CANC |
Brian McGowan
|
|
|
12/4 sfd L2 paper
|
Routing PW Flood Plain | 11/16/2017 | | 11/17/2017 | | FAIL |
Jason C. Taylor
|
|
|
?Need entire new plan set, need elevation certificate, new site plan, foundation plans, details, elevatiosn etc. Routed to front counter for applicant to pick up. Jason Taylor ###-####
|
Routing - FRONT DESK | 11/17/2017 | | 11/17/2017 | | FAIL |
Tisha Gallop
|
|
|
Jason Taylor called customer to pick up failed plans. Plans loacated at Tisha's desk
|
Route to Impact Fee Review | 11/15/2017 | 11/18/2017 | 11/16/2017 | | PASS |
Eric Bilimoria
|
|
|
Can not find the parcel in the GIS system, the building permit may have been assigned a temporary parcel number
|
Routing - Addressing | 11/15/2017 | | 11/16/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Sewer Rating | 11/16/2017 | | 11/16/2017 | | PASS |
Morgan Webb
|
|
|
NO CREDIT FOR DEMO. NEVER CONNECTED TO SEWER.
|
Intake Approval | | | 11/15/2017 | | FAIL |
|
|
|
changed intake approval to failed on 11/17 due to floodplan fail and need to redesign structure to meet requirements
|
Plans ACCEPTED BY PLAN TECH | | | 11/15/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/15/2017 | | DONE |
|
|
|
|
Application received | | 11/13/2017 | | | |
|
|
|
|