Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD17-04149
StatusFinaled
Name JORDAN WILLIAM A
Site Address 2828 N CAMDEN PL
Project NameJordan Addition
Customer Number 
ePlanReviewNo
Description
Permit for a remodel, to include: adding 320sq' of basement (enlarging two bedrooms and adding an en-suite bath to one of them), adding 320sq' of main level space which enlarges & reconfigures the kitchen and dining room. All work per plans, notes, engineering, & local code. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/7/20198/9/20198/9/2019PPASS
DetailsTell Riley
JORDAN Phone #: ###-####//added smoke detectors as discussed onsite--photos sent//
DOC - Permit Finaled8/9/20198/9/20198/9/2019PPASS
DetailsTell Riley
FIRE-Final Inspection8/7/20198/9/20198/9/2019PCANC
DetailsTroy Cobbley
SCHEDULE WRONG INSPECTION JORDAN Phone #: ###-####
BLD-Conference3/13/20193/13/20193/13/2019PDONE
DetailsJim Sly
WIP
BLD-Framing/Rough-in10/26/201810/29/201810/29/2018APASS
DetailsJim Sly
William Phone #: ###-####
Frame and Energy Code Pass.
BLD-Conference2/26/20182/26/20182/27/2018PPASS
DetailsJim Sly
William Phone #: ###-####
BLD-Wall Bracing2/13/20182/14/20182/14/2018APASS
DetailsJim Sly
Mike Phone #: ###-####
BLD-Wall cover12/18/201712/19/201712/19/2017APASS
DetailsJim Sly
mike Phone #: ###-####
Concrete Bsmnt wall.
BLD-Footing12/8/201712/11/201712/11/2017APASS
DetailsJim Sly
Mike Phone #: ###-####
Issue PAID IN FULL permit  11/24/2017 DONE
OVERRIDE  11/22/2017  
Plan assigned to (JAB) Josh11/14/201711/14/201711/22/2017 PASS
DetailsJosh Bogle
1st done - egress effects bearing.
Routing - PLAN CHECK11/22/2017 11/22/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  11/22/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  11/22/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  11/22/2017 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  11/22/2017 DONE
Telephone call  11/22/2017 DONE
Called the representative to let him know what fees are due and that the permit is ready.
Routing - PLAN CHECK11/15/2017 11/15/2017 FAIL
DetailsJosh Bogle
1st review completed  11/15/2017 FAIL
DetailsJosh Bogle
Routing Walk-In (Zoning)11/14/201711/14/201711/14/2017ADONE
DetailsSue Cummings
Routing Walk-In (BLD)11/14/201711/14/201711/14/2017APASS
DetailsJosh Bogle
took in as a level 2
Application received 11/14/2017